3.

1 GROUP-1 Structures of simplest, utilization character which are without complication of design or detailand require a minimum of finish, structural, mechanical and electrical design. Armories Parking StructuresBakeries Printing PlantsFarm Structures Public MarketsService GaragesFreight Facilities Simple Lofttype StructureHangarsIndustrial Buildings WarehousesManufacturing/Industrial PlantsPackaging and Processing PlantsAnd other similar utilization type buildings PROJECT CONSTRUCTION COST MINIMUM BASIC FEE P 50 Million and less........................................6 percentOver P 50 Million to P 3,000,000 plus 5 percentP100 Million .....................................................of excess of P 50 MillionOver P 100 Million to P 5,500,000 plus 4 percentP200 Million .....................................................of excess of P 100 MillionOver P 200 Million to P 9,500,000 plus 3 percentP500 Million .....................................................of excess of P 200 MillionOver P 500 Million to P 18,500,000 plus 2 percentP1 Billion ..........................................................of excess of P 500 MillionOver P 1 Billion ...............................................P 28,500,000 plus 1 percentof excess of P 1 Billion 3.2 GROUP-2 Structures of moderate complexity of design requiring a moderate amount of structural,mechanical and electrical design and research.Art galleries Nursing HomesBanks, Exchange and other Office BuildingsFinancial Institutions P ark, Playground and OpenairBowling Alleys Recreational FacilitiesChurches and Religious Facilities Police StationsCity Halls Post OfficesCollege Buildings Private ClubsConvents, Monasteries and Seminaries Publishing PlantsCorrecti onal and Detention Institutions Race TracksCourt Houses RestaurantsDormitories Retail StoresExhibition Halls and Display Structures Schools Fire Stations Shopping CentersLaundries & Cleaning Facilities Specialty shopsLibraries SupermarketsMotels and Apartels Welfare BuildingsMulti-storey ApartmentsAnd other structures of similar nature or use PROJECT CONSTRUCTION COST MINIMUM BASIC FEE P 50 Million and less........................................7 percentOver P 50 Million to P 3,500,000 plus 6 percentP100 Million .....................................................of excess of P 50 MillionOver P 100 Million to P 6,500,000 plus 5 percentP200 Million .....................................................of excess of P 100 MillionOver P 200 Million to P 11,500,000 plus 4 percentP500 Million .....................................................of excess of P 200 MillionOver P 500 Million to P 23,500,000 plus 3 percentP1 Billion ..........................................................of excess of P 500 MillionOver P 1 Billion ...............................................P 38,500,000 plus 2 percentof excess of P 1 Billion 3.3 GROUP-3 Structures of exceptional character and complexity of design or requiring comparatively largeamounts of structural, mechanical and electrical design and research.Aquariums LaboratoriesAtomic Facilities MarinasAuditoriums Medical Office Facilities & ClinicsAirports Mental In stitutionsBreweries MortuariesCold Storage Facilities ObservatoriesCommunication Buildings Public Health CentersConvent ion Halls Research FacilitiesGymnasiums

StadiumsHospitals and Medical Buildings Theaters and Similar FacilitiesHotels Veterinary HospitalsAnd other structures of similar nature or use PROJECT CONSTRUCTION COST MINIMUM BASIC FEE P 50 Million and less........................................8 percentOver P 50 Million to P 4,000,000 plus 7 percentP100 Million .....................................................of excess of P 50 MillionOver P 100 Million to P 7,500,000 plus 6 percentP200 Million .....................................................of excess of P 100 MillionOver P 200 Million to P 13,500,000 plus 5 percentP500 Million .....................................................of excess of P 200 MillionOver P 500 Million to P 28,500,000 plus 4 percentP1 Billion ..........................................................of excess of P 500 MillionOver P 1 Billion ...............................................P 48,500,000 plus 3 percentof excess of P 1 Billion 3.4 GROUP-4 Residences (Single Detached or Duplex), small apartment houses and town houses.Minimum Basic Fee............................................. 10 Percent of Project Construction Cost 3.5 GROUP-5 Monumental buildings and other facilities requiring consummate design skill and muchprecise detailing.Exposition and Fair Buildings Specialized decorative buildingsMausoleums, Memorials,Monuments And structures of similar nature or useMuseumsMinimum Basic Fee............................................. 10 percent of Project Construction Cost 3.6 GROUP-6 Repetitive Construction of Buildings When the design of the Architect is used again for the repetitive construction of similarstructures, without amending the drawing and the specifications, the Architects fee iscomputed as follows:First structure.......................................................Minimum Basic FeeSecond structure ..................................................80% of Basic FeeThird structure......................................................60% of Basic FeeSucceeding structure............................................40% of Basic Fee 3.7 GROUP-7 Housing Projects When the Architect is engaged to undertake a HOUSING PROJECT involving theconstruction of several residential units on a single site with the use of one basic planand specifications, the MINIMUM FEE chargeable thereunder shall conform with thefollowing:First Unit..............................................................10 Percent of the Construction Cost of oneunit as Basic FeeFrom two to ten units...........................................Fee of 1 unit plus 60% of Basic Fee foreach additional unitEleven units and above........................................Fee for 10 units plus 30% of Basic Fee foreach additional unit 3.8 GROUP-8 Projects involving extensive detail such as furniture design, built-in equipment, specialfittings, screens, counters, interiors and other detailed parts of appurtenances ofbuildings or structures and landscaping designs.Minimum Basic Fee............................................. 15 Percent of Project Construction Cost 3.9 GROUP-9 For alterations and additions of existing structures belonging to Groups 1 to 5enumerated above, compensation of services should be increased by 50 percent or atotal of 150 percent of the Basic Fee.

3.10 GROUP-10 Where the Architect is engaged to render opinion or give advice, clarifications orexplanation on technical matters pertaining to his profession, the Minimum Feechargeable thereunder shall not be less than Two Hundred Pesos (P200.00*) per hoursubject to increase depending on the extent and coverage of service required. Whenrendering service as an expert witness, the Architects fee shall not be less than FiveHundred Pesos (P500.00*) per appearance irrespective of whether the scheduledhearing took place or not.

You might also like