PROCEDIMIENTO DE OPERACIN 12.3: REQUISITOS DE RESPUESTA FRENTE A HUECOS DE TENSIN DE LAS INSTALACIONES ELICAS
In revision:
PROCEDIMIENTO DE OPERACIN 12.2: INSTALACIONES CONECTADAS A LA RED DE TRANSPORTE: REQUISITOS MNIMOS DE DISEO, EQUIPAMIENTO, FUNCIONAMIENTO Y SEGURIDAD Y PUESTA EN SERVICIO
The document can be found at the website:
http://www.ree.es/operacion/procedimientos_operacion.asp
New version Nr 10 of the Spanish Wind Energy Association document (PVVC_v10) is published in response to the revision of the Spanish Grid Code (P.O.12.3 and draft version of P.O.12.2):
PROCEDIMIENTOS DE VERIFICACIN, VALIDACIN Y CERTIFICACIN DE LOS REQUISITOS DEL P.O.12.3 SOBRE LA RESPUESTA DE LAS INSTALACIONES ELICAS Y FOTOVOLTAICAS ANTE HUECOS DE TENSIN
The document can be found at the website:
http://www.aeeolica.org/
DIgSILENT Ibrica S.L. 2
NOTE: this example is built using templates in the global library; Doubly Fed Induction Generators rated 6MW DFIG_WTG_6MW Wind Farm Rated Power: 60MVA
STEP 4.3: With the GridCode Editor, add the new procedure in the Spanish Grid Code (PVVC_v10_general).
STEP 4.3: With the GridCode Editor, add the new procedure in the Spanish Grid Code (PVVC_v10_general).
- Add the zones and edit them. Add the list of limits for the different series.
STEP 4.3: With the GridCode Editor, add the new procedure in the Spanish Grid Code (PVVC_v10_general).
- Edit the voltage dip shape for balanced dips.
10
STEP 4.3: With the GridCode Editor, add the new procedure in the Spanish Grid Code (PVVC_v10_general).
- Edit the voltage dip shape for unbalanced dips.
11
STEP 4: Analysis with DIgSILENT GridCode, checking for Grid Code compliance.
STEP 4.1: File Types & Channels to read the results file. STEP 4.2: Input of base values 60MVA and 220kV STEP 4.3: With the GridCode Editor, add the new procedure in the Spanish Grid Code (PVVC_v10_general).
12
STEP 4: Analysis with DIgSILENT GridCode, checking for Grid Code compliance.
STEP 4.1: File Types & Channels to read the results file. STEP 4.2: Input of base values 60MVA and 220kV STEP 4.3: With the GridCode Editor, add the new procedure in the Spanish Grid Code (PVVC_v10_general).
13
STEP 4: Analysis with DIgSILENT GridCode, checking for Grid Code compliance.
STEP 4.1: File Types & Channels to read the results file. STEP 4.2: Input of base values 60MVA and 220kV STEP 4.3: With the GridCode Editor, add the new procedure in the Spanish Grid Code (PVVC_v10_general).
14
RESULTS
In the second tab, a table summarizes the fulfillment of requirements in Zones A, B, C and D. THE OK? OPTION ACTIVATED MEANS THAT THE REQUIREMENT IS FULFILLED
15
RESULTS
The REE Voltage Dip Shape graph allows to check if the voltage dip is inside the voltage dip rms envelope the wind farm can not disconnect and must provide reactive current support.
16
RESULTS
The Ir/Itot(Vrms) Zone B graph allows to check if the wind farm is injecting or consuming reactive power and fulfilling the requirements established by REE on the reactive current during the dip.
17
RESULTS
The Power graph allows to check the restoration of active power of the wind farm after the voltage dip.
18
REPORTING
Results are reported in Word format.
19
REPORTING
Results are reported in Word format.
20
Ana Morales/Xavier Robe DIgSILENT Ibrica S.L. Ribera del Loira, 46 28042 Madrid Spain Phone: +34 911273723/24 Email: a.morales@digsilent.com x.robe@digsilent.com Website: www.digsilent.com
21