WELL CONTROL PROCEDURES AND RESPONSIBILITIES
WELLCONTROL PROCEDURES PREPARATION PROCEDURES
1.1

;r'':-..

;'

Priorto spudding, is the responsibility the Rig it of conjunclion with the OlM, to reviewthe well
mnlrol issues have been addressed.

that well
e potential No well will and

blorouUunderground blowout situations and


be spudded holesection or started unless
OIM have reviewed the relevant i

1 . 2 The OIM(person-in-charge) must have been selectedand clearly Appropriate formsmustbe made 1 . 3 The distance tromthe rotary and a space-out diagram Drillers floatingrigs must on 1 . 4 As well as the measured
depth (TVD)

metricor Sl units relevantpersonnel. mustbe known alltimes at of the Driller'sBOP panel. charts. mustalso knowtrue vertical
the correct kill mud weight all choke manifold, diverter and

1.5

and accurately complete lhe The Driller(or his overboard valves ensureconect the drillfloor.
Slow .lf
a a

line-upat the beginning each tour and of crossovers prepared are and availableon

1.5

of every tour.
properties changed. are
the bit nozzle configurationor boftom hole assembly (BHA) is

possible afterbotoms-upfromanytrip. (305m) newhole. 1000ft of pumpor surface mud equipment changes/repairs.
following materials are at the dg available to use, drilling

mustbe suspended:
h weightingmaterialand associatedchemicalsto raise the mud weight hole and riser volume and a surface active system of 150 bbls (24 m3)

at leastI ppg(120kg/ms 0.12sg). or Contingency as outlined tre drilling programme. LCM in Enoughcementand additives placeat least2 x 500 ft (2 x 150m)plugsin to openhole.

Confi dential Treatment Requested TODDI by

TRN-USCG-MM$M043818

CONFIDENTIAL

Exhibit No.

TRN-MDL-00286775 Inc.

WorldwideCourt

VT,ELLCONTROL HAS.OPS+IB-ltl

AND RESPOHSIBIUTIET WELL CONTROLPROCEDURES


PROCEDURES CONTROL UVELL 1.8 After setting the initial casing stfng(s) or dudng and of minimum two independent testedbaniersmustbe in mustceaseand Uponfailureof a banier,normaloperations position beenrestored. banieris A has a two banier
Any remote oparated vafue or set of valves that

until

pressure
hydrosta$c

tested. A lmown and monitoredfluid column the pressura overbalance poreprsssure. to that has Any cementplugin the wellbore in Any mechanicaldevice instralled the that has been or wellbore annulus pressure testedto the maximum sealing Anyother pnessure flow of fluidsfmm a well. 1.9 During relevantoperations, weekly basis with each crew. reportand shouldbe
of surfaoe hole, then

chlistmas trae, tubing, either inflowtesled or of the purpose preventing

must be held on at least a must be logged in the |.A.D.C. f the planis to divertduringdrilling
be held by each crew at the

cf beginning every 1.10 The period (excluding betwsanijssts testing

of the BOP and related equipment must not exceed a maximum period not exeed a maxlmumof 21 days, Pressure with the CompanyWell Gontrol accordance

manual.
1 . 1 1 BOP the fi must be functiontestedevery7 days or during -day interval. The intentis that the test be donewhen belng day and wlll dependon the type of cperations be canied out. The pnod betweenfuncton tests must of 14 days. holepriorto and opening mustbe run whiledrilling or ported) e casingor any time the postedwell oontrolplan ie to divert.In used belowsurfacecasingmustindude eithera float ddllstrings tanding sub for a dropln valvewith the drop-invalvekepton the rig

1.12

by TreatnentRaquesied TODDI Confidentiel

I TRN-USCG*MMS;0004381