Weekly Construction Progress Report

TITAN Contract No. LEC Job No. : CAF-583 : 511838

WCPR-01 Report Period : 2011. 10. 09 ~ 10. 15

TITAN Project - T

Contents
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Construction Activity Summary Weather Record Safety Control Status Quality Control Status Construction Progress Summary Quantitative Construction Progress Status Three Weeks Construction Schedule Construction Manpower Status Material Delivery Status Pending Matters --> Status of Pending Items Areas of Concern

1.
** **

Weekly Construction Activity Summary


Due Date
Highlight

Last Week

Major Activities 1) Civil * * * * 2) Structure * * 3) Mechanical * * 4) Piping Prepare Site ITP for Steel Stucture Site Visit to Precast Concrete Supplier/Vendor 13-10-2011 10-11-2011

1.

Weekly Construction Activity Summary


* * 5) Electrical * * 6) Instrumentation * * 7) Painting / Insulation * *

Status

This Week
Highlight ** ** Major Activities 1) Civil * * Prepare Bill of Quantity/Work Volume for Civil Works Prepare & Update Work Breakdown Schedule for Civil Structure Work

2) Structure * * 3) Mechanical * * 4) Piping

* * 5) Electrical * * 6) Instrumentation * * 7) Painting / Insulation * *

Due Date

Status

Ongoing Ongoing

2.

Weather Record
Description
Sun 10/9 Mon 10/10 Morning- clear Evening-cloudy Tue 10/11 Morning- clear Evening-cloudy Wed 10/12 Morning- clear Evening-storm Thu 10/13 Morning- cloudy Evening-clear

2.1

Weather Condition
a. Clear b. Cloudy c. Rainy * Morning * Afternoon * Evening ** Total (mm) d. Windy

2.2

Temperature (C)
a. Highest b. Lowest

Min - 24o C Max - 32o C

Min - 24o C Max - 32o C

Min - 24o C Max - 32o C

Min - 24o C Max - 32o C

2.3

Remarks

Fri 10/14 Morning- clear Evening-storm

Sat 10/15 Morning- clear Evening-storm

Min - 24o C Max - 32o C

Min - 24o C Max - 32o C

3. Safety Control Status


3.1. Induction Meeting / Training 1) Staff/Supervisor 2) Labor 3.2. Inspection for Construction Equipment 1) Pass 2) Reject 3.3. Incident / Accident 1) Working Hours without LTA 2) LTA(Lost Time Accident) 3) First-Aid-Case Unit MD Previous Current Last Week (Cumul.) (Cumul.) 4 15 0 0 4 15

EA

0 0

0 0

0 0

HR EA

960 0 0

0 0 0

960 0 0

4. Quality Control Status


1. Inspection Status
Period Previous (Cumul.) Last Week Current (Cumul.) Civil 0 0 0 Steel Structure 0 0 0 Equip. 0 0 0 Piping 0 0 0 Elec/Inst 0 0 0
Painting/ Insulation

Others 0 0 0

Total 0 0 0

Remarks

0 0 0

2.
1) 2) 3) 4) 5)

Highlights in Last Week


To Review Construction Specification for Civil and Steel Structural.

: : : : :

11-10-17

5. Summary of Construction Progress


Project Discipline Weight % 1 2 3 4 5 6 7 8 9 Temp. Fac. Civil Stl-Str. Equipment Piping Electrical I&C Paint/Insul. Pre-Comm. Total 0.53 1.52 2.64 1.96 6.01 1.90 0.90 0.59 0.06 16.11 Const. Weight % 3.29 9.44 16.39 12.17 37.31 11.79 5.59 3.66 0.37 100.00 Percent Complete Plan This WK 3.00 2.00 1.00 1.00 Cumul. 100.00 31.00 19.00 2.00 2.00 Actual This WK Cumul. 100.00 1.22 This WK 0.05 0.05 0.02 0.01 0.13 Plan Cumul. 0.53 0.47 0.50 0.04 0.02 1.56 Weight Complete Actual This WK Cumul. 0.53 0.02 0.55 Remarks

6. Quantitative Construction Progress


Discipl. Work Description Unit Total Q'ty 2011. 10. 09 ~ 10. 15 Progress
Previous (Cumul.) Last Week Current (Cumul.) %

Civil

Stl-Str.

Equip.

Piping

Elect.

I&C

14 of 22

6. Quantitative Construction Progress


Discipl. Work Description Unit Total Q'ty 2011. 10. 09 ~ 10. 15 Progress
Previous (Cumul.) Last Week Current (Cumul.) %

Paint'g

Insul.

Total

15 of 22

7.

Three(3) Week Schedule


* Cut Off Date : 2011-10-10
Schedule Discipline / Category / Activity
Start Finish

Project Name : TITAN Project-T

* Remaining Days for Completion :


Last Week

319 Days
This Week

* Project Period :

5/24/2011

~
Next Week

8/24/2012

Work Volume Dur Unit Plan Act. Prog. Mon


10/10

Tue
10/11

Wed
10/12

Thu
10/13

Fri
10/14

Sat
10/15

Sun
10/16

Mon
10/17

Tue
10/18

Wed
10/19

Thu
10/20

Fri
10/21

Sat
10/22

Sun
10/23

Mon
10/24

Tue
10/25

Wed
10/26

Thu
10/27

Fri
10/28

Sat
10/29

Sun
10/30

Remarks

Civil
1 2 3 4 5 6 7 8 9
1/12 1/16 1/8 1/20 1/18 1/9 9 3 2 EA m m 96 39 63 63 48 12/24 1/14 1/17 d 25
#VALUE!

m m 260 177 210 8 81%

50% 100% -

For Example Only


1/13 1/8 1/7 1/6 1/6 1/14 1/20 1/20 1/8 1/7 1/6 1/6 1/22 1/26 8 1 1 1 1 9 7 m m m m m m EA 177 39 63 39 31 260 96 36 39 63 39 31

Piping
1 2 3 4 5
20% 100% 100% 100% 100% 1/16 12/30 1/11 1/9 1/22 1/22 1/22 1/22 1/22 1/21 1/3 1/14 1/11 1/29 1/29 1/29 1/29 1/29 6 5 4 3 8 8 8 8 8 m m m m m m m m m 177 51 130 130 260 261 262 263 264 51 51 130 29% 100% 100% <Note>

Electrical
1 2 3 4 5

8. Construction Manpower Mobilization Status


<TITAN Project-T>
Original Mob. Plan (a) Actual Previous (Cumul.) Current Cumul. (b) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 Plan vs. Actual : (b/a) [%] #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Unit : Man-Week (M/W)

Discipline

Remarks

Last Week

1 2 3 5 7 8 9 10 11

Temp. Fac. Civil Stl-Str. Equipment Piping Electrical I&C Painting Insulation Total

9. Material Delivery Status


9.1 Materials Received Last Week
No. 1 2 3 4 5 6 7 8 9 10 11 P/O No. Description Q'ty No. Unit Date of Receiving Remarks

9.2 Materials to be Received This Week


No. 1 2 3 4 5 6 7 8 9 10 11 12 P/O No. Description U/G Piping & Fitting for Project-T Q'ty No. 8 Remarks Unit Pckg. 2011.10.22 Onhold for C/C Date of Receiving

9. Material Delivery Status

10. Status of Pending Items


TITAN Project-T Cat. Works To Be Done
** Fixed Lump-Sum Contract with TITAN * Expedite TITAN's on Budget Increase ** LOI to Subcontractors * Expedite TITAN's Decision on Budget Increase ** Preparation for Subcontract * Index * T&C * BOQ * Drawings * Main Text * SOW * Spec

Action By
PD PD PCM/PE

Due Date

Overall / General

14-Oct-11

** Project Coordination Procedure_R1 * Main Text * Construction Weekly Report (Form) * Submit to TITAN Engg ** ** RFQ/PO Pending Items * Field Fab Tanks * Mixer & Ejector * Fire-Fighting Eqt * Gas Detection Sys. * E&I Cable/Wire * Piping Mat'l (2nd) * Piping Special Parts (1st) * Butterfly Valve RFQ
14/06/11 10/08/11 19/09/11 27/07/11 08/09/11 12/10/11

PD PD PE(HO)

26-Sep-11 03-Oct-11 07-Oct-11

B/C
23/06/11 19/08/11 28/09/11 24/10/11 29/09/11

TBE

Nego

PO

SRD

19/07/11 22/08/11 14/10/11 19/10/11 03/11/11

12/10/11 20/10/11 25/10/11

Proc

** Additionally Required Material for U/G Piping * PE Coated Pipe ( ?" x ??m) * Heat-Shrink Sleeve/Wrapping Materials for PE Coated Piping - Option-1 : CO for Subcontractor - Option-2 : Use Wrapped Pipes for a certain Section ** Delay in CC Concern on Demurrage of Containers Write eMail to TITAN stating Demurrage Rate ** Construction Planning * Prepare Work Volume Distribution Plan (Preliminary)

DCM/PCM

HJS

06-Oct-11

DCM QCM Civil/QC Civil/QC

14-Oct-11 07-Oct-11 18-Oct-11 20-Oct-11

Const

** ITP * Reflect TITAN Comment and include Site/Field ITP * Detail ITP for Civil Works * Detail ITP for Steel Str. Works

[ Legend ]

U : Urgent,

A/B/C : Priority

H : Holding

ding Items
As of : 2011-10-15

Prio -rity
A U H

Status/ Forecast

Reference / Remarks

* Sent Expediting e-Mail to TITAN on 10-Oct. * Be ready for Approval Processing * Construction Team to review T&C and SOW

* Updating Details of Const. Matters

Done Done Done(12-Oct) * Weekly Reporting shall be practiced

ETA(Site)

* Indication of Date : DD-MM-YY

* Sight Glass, Flexible Hose, etc. * Site Procurement Item

* Consult with Subcontractor

Done

* Estimated to get C/C by 22.10.11 (Sat.)

* incl. Delivery Schedule of Equipment & Materials

* ITP shall be approved prior to start Works

Completed

11. Areas of Concern


Srl No. 1 2 3 4 5 Subject Underground Services Incoming Material U/G Piping Custom Clearance Description Underground for BD/OCU at cable trench & underground piping clashes with Hydrant,Cabinet Hose Reel and Lighting Pole. To revise Inspection Report and pending missing Mill. Certificate to be received. To expedite Titan for U/G Piping Custom Clearance 2011-10-15 Remarks To Contruct New Drawing Layout Follow -up ETA on Saturday (10/22)