Snagging

Level: Room No: Room Type:

QA / QC

Procedures

REMARKS

1.0 MAIN ENTRANCE DOOR 1.1 Door panel are properly stained, installed and free from scratches. 1.2 Eye Viewer Installed. 1.3 Door Closer installed and working properly. 1.4 Door stopper installed. 1.5 Door Hinges installed. 1.6 Door Frame are properly re-stained and free from scratches. 1.7 Drop Down Seal installed properly. 1.8 Rubber strip around door frame was installed properly. 1.9 Door knob installed and working properly 1.2O Door Bell Installed and working properly 1.21 Main Door Threshold installed and free from broken chip 2.0 WARBROBE / CORRIDOR 2.1 Wooden Wardrobe door are free from scratches. 2.2 Wardrobe Door decorative glass to be free from scratches 2.3 Wardrobe Door Pull installed. 2.4 Door Hinge working properly 2.5 Wardrobe frame should be free from scratches. 2.6 Wooden Drawers with decorative glass are installed and working properly 2.7 Safe / Deposit Box Installed 2.8 Ceiling paint are free from stain. 2.9 DB access shutter was installed and working properly. 2.1O

DB panel and RMS panel are installed.

2.11 Hanger rod installed 2.12 RMS access shutter was installed and working properly. 2.13 Return air grille installed parallel with ceiling bulkhead. 2.14 Interface between timber walls & warbrobe should be aligned. 2.15 Wardrobe wall paper installed and free from air lumps. 2.16 Iron board, torch and hygienic box installed. 2.17 Skirting installed and aligned with wardrobe base 2.18 Timber cladding free from scratches and uniform application of stain 2.19 Mirror full length was properly installed and aligned. 2.2O Lighting controls, Power point are installed and working properly. 2.21 Bulkhead finish at ceiling was done properly. 2.22 properly.
Ceiling Lights , Emergency lights, and Bulkhead Lights are installed and working

2.23 Inter-connecting Door with lock set, hinges, seals, drop down seal are installed. 3.0 BATHROOM 3.1 Sliding Door Installed and working properly. 3.2 Sliding Door are free from scratches. 3.3 Marble threshold installed and free from scratches.

REMARKS

3.4 Door pull handle installed. VANITY AREA 3.5 Vanity marble top was installed and free from broken edges 3.6 Vanity mirror installed and free from crack. 3.7 Vanity wall mosaic was installed and free from broken edges 3.8 Vanity timber unit and timber niche installed free from unnecessary stain. 3.9 Ceiling Light, Wooden bulkhead lights and Lights under vanity unit installed and working properly

3.10 Vanity timber bulkhead installed and free from scratches. 3.11 Wash basins installed and free from broken chip 3.12 Faucet, Mixers, and Pop-up waste installed and working properly. 3.13 Stone flooring installed, aligned, and free from broken edges. 3.14 Skirting installed, aligned, and free from broken edges. 3.15 Access panels installed at ceiling. 3.16 Volume Control and shaver outlet installed and working properly. 3.17 Speakers and firesprinkler are installed. 3.18 Shaving mirror and Vanity mirror lights are working properly. 3.19 Towel ring and Robe hook installed properly. BATHTUB AREA 3.2O Bathtub wall stone installed properly and free from broken edges. 3.21 Bathtub stone cover was installed. 3.22 Bathtub installed at proper location. 3.23 Bathtub faucet, Mixer, and Pop-up waste installed and working properly. 3.24 Bathtub niche installed and properly aligned. 3.25 Ceiling paint applied properly. 3.26 Ceiling Lights and niche light installed and working properly. SHOWER AREA 3.27 Shower Glass door and fixed panel are installed, and free from scratches. 3.28 Shower stone walls installed and properly aligned. 3.29 Shower mosaic installed and properly aligned. 3.3O Shower niches stone installed and aligned. 3.31 Shower covelight and ceiling light installed and working properly. 3.32 Shower ceiling paint applied properly 3.33 Ceiling level and joints are properly done 3.34 Stone skirting installed and free from broken edges. 3.35 Shower head installed, Shower mixer, and Hand shower are installed properly. 3.36 Grab bar, Door handle, and clothes line are installed properly. 3.37 Floor Drain installed properly. WC AREA 3.38 WC door with door pull installed and working properly. 3.39 Mirror at WC are free from scratches. 3.4O Mosaic walls installed properly 3.41 Timber cladding installed and free from scratches. 3.42 Timber niche installed and properly aligned. 3.43 WC and bidet bowl installed and sealant applied around. 3.44 Bidet, Bidet mixer, WC Flush Actuator were installed properly .

REMARKS

3.45 Interfacing of Wood panel and Mosaic done properly. 3.46 Ceiling paint applied and done properly 3.47 Ceiling/walls joints are properly aligned. 3.48 Ceiling Lights installed and working properly. 3.49 Stone flooring installed properly. 3.5O Niche light and Covelight installed and working properly 3.51 Telephone Outlet installed 3.52 Toilet paper, Robe hook, and Towel ring are installed. 3.53 Exhaust Grill installed properly. 4.0 TV MEDIA WALL 4.1 Credenza installed, properly level and aligned. 4.2 Credenza marble top installed. 4.3 Magazine rack installed. 4.4 Desk installed and swivel properly. 4.5 Shutters installed and working properly. 4.6 Media panel installed and properly aligned. 4.7 Mirror and metal trim installed properly. 4.8 Wallpaper installed and free from air lumps. 4.9 Skirting installed and properly aligned. 4.10 Artwork installed properly. 4.11 TV bracket installed and working properly. 4.12 Telephone, Switch and Socket, Media hub etc. are installed. 5.0 BED WALL AREA 5.1 Coffee niche installed and working properly 5.2 Nighstand shutter installed. 5.3 Amenity station installed and free from scratches. 5.4 Amenity station marble top installed and free from broken edges. 5.5 Wallpaper installed and free from air lumps. 5.6 Timber cladding and mouldings installed and free from scratches. 5.7 Textured wall should be properly aligned, groove to be consistent. 5.8 Ceiling/walls joints to be properly aligned. 5.9 Ceiling paint applied properly. 5.10 Lights installed and working properly 5.11 Curtain box aligned and properly painted. 5.12 Air Conditioning Supply grill was installed. 5.13 Wood Panel should free from paint stain and scratches 5.14 Bulkhead installed and aligned. 5.15 Covelights was installed and working properly 5.16 Speakers and Smoke detectors are installed and properly working. 5.17 Fire sprinklers are installed. 5.18 Switch and Sockets (power and telephone) installed and working properly. 5.19 Carpet was installed.