PROJECT : BPO INTERNATIONAL OFFICE RENOVATION PROJECT LOCATION : 32/F Raffles Corporate Center, Emerald Ave.

, SUBJECT : BILL OF QUANTITIES DATE : 08 March 2012 SCOPE OF WORK QTY UNIT

1 LABOR SUBCONTRACTOR 1.1 Civil Works 1.2 Painting Works Sub-total 2 Interior Architectural Work 2.1 Floor Works 2.1.1 Supply and installation of carpet simulated vinyl tiles (Apo Mimicri 450 x 450 x 3mm) with self levelling cement base APO Vinyl Tiles 2,525.00 pcs Rugby / Adhesive 35.00 gal Self Levelling compund 15.00 bags 2.1.2 Supply and installation of 600mm x 600mm homogenous polished tiles for the Reception Felport Tiles 60 x 60 57.00 pcs Cement 8.00 bags Adhesive 2.00 bags Sand 56.00 bags Grouts 1.00 bag Consumables 1.00 lot 2.1.3 Supply and installation of 600mm x 600mm homogenous porcelain tiles for the Executive Washroom & Shower Room 1.00 1.00 lot lot

Capstone Builders Corporation

1 of 10 pages

BPO International- Raffles Office Fit-out

Felport Tiles 60 x 60 Cement Adhesive Sand Grouts Consumables Sub-total 2.2 Wall Works 2.2.1 Supply and installation of drywall partition using gypsum board panels with metal furring 12mm thk Gypsum Board Boral Metal Studs Metal Tracks Insulation Consumables 2.2.2 Supply and installation of mdf cladding for the Reception 3/4 MDF Board Duco Paint Materials 2.2.3 Supply and installation of aluminium inserts for the Reception 12" wide aluminum insets 2.2.4 Supply and installation of stainless steel tubing as accents for the Reception & Conference Room Stainless tubular Sub-total 2.3 Wood Trims 2.3.1 Supply and installation of the following doors complete with all necessary hardware and accessories (hinges, locksets, etc.)

42.00 6.00 1.00 42.00 1.00 1.00

pcs bags bags bags bag lot

100.00 115.00 50.00 8.00 1.00

pcs pcs pcs pcs

13.00 1.00

pcs lot

pcs

1.00

lot

Capstone Builders Corporation

2 of 10 pages

BPO International- Raffles Office Fit-out

2.3.1.1 Door 4 Door Jamb TKD Flush Door Lever type mortise lockset Door Stopper 2.3.3 Supply and installation for upper wall framing for all glass partitions & operable partition TKD S4S 2 x 4 x 10' Consumables Sub-total 2.4 Cabinetry 2.4.1 Supply and installation of the following 2.4.1.1 Rehabilitation of Pantry Cabinets 3/4" thk Melamine MDF Panels Refabrication charges Other consumables Labor for reinstallation 2.4.1.2 Admin Storage 3/4" thk marine plywood 1" x 2" x 10' S4S Consumables Painting Materials Sub-total 2.5 Ceiling Works 2.5.2 Supply and installation of gypsum ceiling accent for the Reception 3/4" thk MDF 1/4" thk MDF Painting Materials Sub-total

4.00 4.00 4.00 4.00

sets sets sets sets

15.00 1.00

pcs lot

3.00 1.00 1.00 1.00 2.00 6.00 1.00 1.00

pcs lot lot lot pcs pcs lot lot

2.00 2.00 1.00

pcs pcs lot

Capstone Builders Corporation

3 of 10 pages

BPO International- Raffles Office Fit-out

2.6 Painting Works 2.6.1 Wall Works 2.6.1.1 Semi gloss roller paint finish for all gypsum and plastered surfaces Flat Latex 701 Semi-gloss Latex Pre-mix Putty Consumables Other misc. paints 2.6.1.2 Duco finish for all specified doors 2.6.2 Ceiling Works 2.6.2.1 Flat roller paint finish for all gypsum surfaces Flat Latex 701 Pre-mix Putty Consumables Sub-total 2.7 Glass Works 2.7.1 Supply and installation of 1/2" thick clear tempered glass panels with frosted tint 2.7.2 Supply and installation of 1/4" thick painted glass panels for the Conference Room, Meeting Room & Reception 1/2" thk plywood Labor for plywood 2.7.4 Supply and installation of 1/4" thick mirror with 1/2" thick marine plywood backing for the Executive Washroom 44.98 sq.m.

10.00 10.00 8.00 1.00 1.00 1.00

tins tins tins lot lot lot

1.00 1.00 1.00

tins tins lot

22.00

sq.m.

8.00 1.00 0.84

pcs lot sq.m.

Capstone Builders Corporation

4 of 10 pages

BPO International- Raffles Office Fit-out

1/2" thk plywood Labor for plywood 2.7.5 Supply and installation of the following doors: 2.7.5.1 Door 1 2.7.5.2 Door 2 2.7.5.3 Door 3 Sub-total 2.8 Masonry Works 2.8.1 Supply and installation of 100mm thick CHB partition for the relocated door opening of the ACU Room CHB#4 10mm RSB Cement Sand 2.8.2 Supply and installation of new granite counter for the existing pantry counter 2.8.3 Supply and installation of 600mm x 600mm polished homogenous wall tiles for the Exec. Washroom and Shower Room Felport Tiles 60 x 60 Cement Adhesive Sand Grouts Consumables 2.8.4 Relocation of existing ACU Room door Welding Rods Painting in ducco finish Sub-total 2.8 Special Items

2.00 1.00

pcs lot

1.00 2.00 5.00

sets sets sets

5.25

sq.m.

70.00 5.00 3.00 20.00 1.00

sq.m. pcs sq.m. bags lot

135.00 12.00 8.00 70.00 5.00 1.00 1.00 1.00

pcs bags bags bags bag lot kl lot

Capstone Builders Corporation

5 of 10 pages

BPO International- Raffles Office Fit-out

2.8.1 Supply and installation of built up metal signage 2.8.2 Supply and installation of power poles (see detail) 1 1/2 x 1 1/2 Angle bar Graphicote Glass Reeded aluminum laminate 1/2 MDF Aluminum U-channel Consumables Sub-total 3 Mechanical Works 4 Sanitary/Plumbing Works 4.1 Additional Materials for Plumbing 4.2 Supply and installation of the following plumbing fixtures: 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 Water Closet Lavatory Lavatory Faucet Shower Assembly Pantry Sink Pantry Faucet

1.00

lot

6.00 12.00 1.00 3.00 6.00 6.00 1.00

sets sets lot pcs sets pcs lot

1.00

lot

1.00

lot

1.00 1.00 1.00 1.00 1.00 1.00

set set set set set set

2.4.3 Supply and installation of the following toilet accessories: 2.4.3.1 2.4.3.2 2.4.3.3 2.4.3.4 Towel Rack Towel Ring Robe hook Toilet Paper Holder Sub-total 1.00 1.00 2.00 1.00 set set sets set

Capstone Builders Corporation

6 of 10 pages

BPO International- Raffles Office Fit-out

5 General Requirements 5.1 Permits 5.2 Bonds 5.3 Insurance Sub-total GRAND TOTAL 1.00 1.00 1.00 lot lot lot

OTHER ITEMS OF WORK


1 General Requirements Mobilization / Demobilization Board-up & Miscellaneous Hauling & Delivery of Materials Cleaning Materials Warehousing Plastics & plywoods Sub-total 2 Hauling for Demolition Works 3 Accent Color Painting for Upper & Lower Wall Painting Materials 4 Realignment & Make Good of existing Acoustic Ceiling including replacement of damaged boards Acoustic Board Tee Runners Consumables 5 1/2" thk clear glass ledge at boardroom glass board 6 Phenolic Board Toilet Partition w/ stainlesss steel fittings including urinal 1.00 1.00 1.00 1.00 1.00 lot lot lot lot lot

1.00

lot

1.00

lot

30.00 800.00 1.00 2.40

pcs l.ft. lot lm

1.00

lot

Capstone Builders Corporation

7 of 10 pages

BPO International- Raffles Office Fit-out

7 Electrical Works CONDUIT PIPES AND FITTINGS 15mm EMT Pipe 250.00 lgt 20mm EMT Pipe 25.00 lgt 25mm EMT Pipe 10.00 lgt 15mm Flexible Mettallic Conduit 65.00 lm Conduit Accessories 1.00 lot Hangers & Supports 1.00 lot BOXES AND ENCLOSURES Utility box 2x4, Ga. # 16 250.00 pc Junction box 4x4, Ga. #16 120.00 pc Octagonal Box, Ga. #16 70.00 pc Square box 4 11/16 Ga. #16 40.00 pc WIRE AND CABLES 3.5mm2 THHN 2,500.00 lm 5.5mm2 THHN 500.00 lm 8.0mm2 THHN 50.00 lm 14mm2 THHN 80.00 lm WIRING DEVICES One-Gang Switch, single pole, 16A, 250V 4.00 set Two-Gang Switch, single pole, 16A, 250V 9.00 set Three-Gang Switch, single pole, 16A, 250V 4.00 set Four-Gang Switch, 'Wonpro' grey 2-gang PVC switch box 3.00 set Three-Way, One-Gang Switch, 16A, 250V 2.00 set Single Convenience Outlet, 16A, 250V, grounding 10.00 type set Duplex Convenience Outlet, 16A, 250V, grounding type 258.00 set Duplex Convenience Outlet, 16A, 250V, grounding 6.00 floor set type, mounted Twistlock Outlet, 20A, 2P+E, floor mounted 3.00 set Exhaust Fan, cassette type, ceiling mounted 2.00 set LIGHTING FIXTURES 2 x 36W Fluorescent Troffer 25.00 set 23W CFL Pinlight 11.00 set 12W LED Downlight, recessed mounted, warm white 10.00 set Emergency Light, with built-in battery pack & trickle charger set 10.00 Exit Light, single-faced, wall mounted 3.00 set Exit Light, double-faced, ceiling mounted 2.00 set

Capstone Builders Corporation

8 of 10 pages

BPO International- Raffles Office Fit-out

PANEL BOARD and EQUIPMENT Panel 'LP-UPS' 1.00 Main: 40AT/50AF, 3P, 22KAIC, 230V Brs: 6 - 20AT/50AF, 2P, 230V 12KVA, 3 Phase, 230V, 60Hz 40AT/50AF, 3P, 230V 7.00 40AT/50AF, 2P, 230V 4.00 40A, 3P, 230V Circuit Breaker, NEMA-3R Enclosure 1.00 40A, 2P, 230V Circuit Breaker, NEMA-3R Enclosure 2.00 LABOR FOR ELECTRICAL 1.00 Sub-total

assy

set set assy assy lot

GRAND TOTAL INCLUDING OTHER WORK ITEMS

Capstone Builders Corporation

9 of 10 pages

BPO International- Raffles Office Fit-out

Capstone Builders Corporation

10 of 10 pages

BPO International- Raffles Office Fit-out