A P P E N D I X A FORM OF COMPLETION CERTIFICATE I/We certify that the installation detailed below has been installed by me/usand tested

and that to the best of my/our knowledge and belief, it complies withIndian Electricity Rules, 1956, as well as IS:732 Code of practice of Electricalwiring Installations (system voltage not exceeding 650 volts)Electrical Installation at ________________________________________ Voltage & system of supply _____________________________________ 1. Particulars of Works :(a) Internal Electrical InstallationNo. Total Load Type of systemOf wiring(i) Light point(ii) Fan point(iii) Plug point(a) 3 pin 5 amp(b) 3 pin 15 amp(b) OthersDescription HP / KW Type of starting(a) Motors (i)(ii)(iii)(b) Other plants :2

.. 2 ..(c) If the work involves installation of over headline and/ or underground cable.[a] (i) Type & description of overhead line(ii) Total length and No. of spans(iii) No. of street light and its description.[b] (i) Total length of underground cable & its size.( ii) No. of joints End Joint :Tea Joint :St. through Joint :Earthing :(i) Description of earthing electrode(ii) No. of earth electrodes.(iii) Size of main earth lead.Test Results :(a) Insulation Resistance(i) Insulation resistance of the whole syst emof conductors to earth . Megohms(ii) Insulation resistance between the phaseConductor & neutral Between phase R and neutral . MegohmsBetween phase Y and neutral . MegohmsBetween phase B and neutral . Megohms(iii) Insulation resistance betwee n the phaseConductors in case of poly phase supplyBetween phase R and phase Y . MegohmsBetween phase Y and phase B . MegohmsBetween phase B and phase R . Megohms3 .. 3 ..(b) Polarity TestPolarity of non linked single pole branch switches.(c) Earth continuity testMaximum resistance between anypoint in the earth continuity conductorconductor including metal conduits andmain earthing lead .. Ohms(d) Earth Electrode Resistance(i) Ohms(ii) Ohms(iii) Ohms(iv) Ohms(e) Lighting Protective SystemResistance of the whole of lightingprotective system to earth before anybonding is effected with earth electrodeand met1 in/on the structure OhmsSignature of the Supervisor Signature of ContractorName and address Name and address RRP/tech.specification for electric.doc/my documents/old data/110208

of 48 Leave a Comment

.. 4 ..9.1.4.2 (a) Stra y currents flowin g in the soil may produce serious errors inmeasur ement of earth resistan

ce. To eliminate this, hand drivengenerator is used.(b) If the frequency of the supply of hand driven generator coincideswith

the frequency of stray current there will be wandering ofinstrument pointer. An increase or decrease of

generator speed willcause this to disappear.9.1.4. 3 At the time of test, the test ele ctrode shall be separated from theearthing

system.9.1.4.4 T he auxiliary elect rodes shall be of 13 mm diamete r mild steel roddr iven upto 1 m into the ground.9.1.4.5 A

ll the three electr odes shall be so placed that they will beindepend ent of the resistance area of each other.9.1.4.6 If t

he test electrod e is in the form of rod, pipe or pl ate, the auxiliar ycurrent electrode C shall be placed at least 30m

away from it and theauxiliary potential electrode B shall be placed mid way betweenthem.9. 1.4.7 Unless thr

ee consecutive r eadings of test e lectrode resistan ce agreethe test shall be repeated by increasing the distance

betweenelectrod es A and C upto 50 m and each time placing the electrode Bmidway between them.9.1.4.8 On

these principles Megger Earth Tester containin g a direct readin gohm meter, a hand driven generator and auxiliary

electrodes aremanufacture d for direct reading on earth resistance of electrodes.9.1.5 On completion o f an electric inst

allation (or an ex tension to aninst allation) a certificate shall be furnished by the contractorcount ersigned by the

certified supervisor under whose directsupervisio n the installation was carried out. This certificate shall

be inthe prescribed form as given in Appendix A, in addition to the testcertificate required by the local Electric

Supply Authorities.-.-.-..-.-.-.-.-.-. SECTION 10.0ACCEPTE D MAKES OF MATERIALS

---------------------------------------------------------------------------------------------------------Sr.No. Articles / Items Approved

Makes---------------------------------------------------------------------------------------------------------1. PVC Wires/ c onductors Finole

x, Polycab, Sun dep2, Conduits VIMCO / BEC3. Cables Gloster, Asian, Polycab, CCI(until 95 sq.mm.)4. Switc hes, Sockets St

andard, Anchor5 Amps / 15 Amps5. 15/30 A mps. ICDP switc hes Stanley, KE W6. I.C.T.P.N. S witches KEW, G E, L&T, Siemen

s7. Lighting Distr ibution Morarjee Dormans, Legra ndBoards MCB type8. Power Di stribution Board s GE, Legrand9.

All light fittings Crompton / GEC / Philips10. Any other item Samp le to be sent for Approval of E.I.C11. Change over switches L

&T, KEW--------------------------------------------------------------------------------------------------------APPENDI X A

FORM OF COMPLETION CERTIFICATE I/We certify that the installation detailed below has been

installed by me/usand tested and that to the best of my/our knowledge and belief, it complies withIndian

Electricity Rules, 1956, as well as IS:732 Code of practice of Electricalwiring Installations (system voltage not exceeding

650 volts)Electrical Installation at _____________ _____________ _____________ _ Voltage & system of

supply _____________ _____________ ___________ 1. Particulars of Works :(a) Inter nal Electrical Ins tallationNo. Tota

l Load Type of s ystemOf wiring(i) Light po int(ii) Fan point(ii i) Plug point(a) 3 pin 5 amp(b) 3 pin 15 amp(b) OthersDescripti

on HP / KW Typ e of starting(a) Motors (i)(ii)(iii)( b) Other plants : 2 .. 2 ..(c) If the work involves installation of

over headline and/ or underground cable.[a] (i) Type & description of overhead line(ii) Total length and No. of spans(iii)

No. of street ligh t and its descript ion.[b] (i) Total le ngth of undergro und cable & its s ize.(ii) No. of join ts End Joint :Te a Joint :St.

through Joint :Earthing :(i) Description o f earthing electro de(ii) No. of eart h electrodes.(iii) Size of main ear th lead.Test Res

ults :(a) Insulatio n Resistance(i) I nsulation resista nce of the whole systemof condu ctors to earth . Megohms(ii) Ins ulation resistanc

e between the p haseConductor & neutral Between phase R and neutral . MegohmsBetw een phase Y an d neutral . Me

gohmsBetween phase B and ne utral . Megoh ms(iii) Insulation resistance betw een the phaseC onductors in case of poly

phase supplyBetween phase R and ph ase Y . Mego hmsBetween ph ase Y and phas e B . Megohm sBetween phase

B and phase R . Megohms 3 .. 3 ..(b) Polarity Tes tPolarity of non linked single pole branch

switches.(c) Eart h continuity test Maximum resistance between anypoint in the earth continuity conductorcondu

ctor including metal conduits andmain earthin g lead .. Ohm s(d) Earth Electr ode Resistance( i) Ohms(ii) Ohms(iii)

Ohms(iv) Ohms(e) Lightin g Protective Sys temResistance of the whole of lightingprotectiv e system to earth before

anybonding is effected with earth electrodeand m et1 in/on the struct ure OhmsSig nature of the Su

pervisor Signatu re of Contractor Name and addr ess Name and a ddress
RRP/tech.specification for electric.doc/my documents/old data/110208