You are on page 1of 2

CARLOS

MONCADA
Architect Masters in Design Research on Media Art and Architecture 516 S ST Andrews Pl. Unit 605 Los Angeles, CA 90020 [213] 9097036- camoncada1975@gmail.com http://cargocollective.com/carlosmoncada I am an architect with more than 9 years experience on Design, planning, performing, and evaluation of various phases of architectural and master planning projects from concept design to construction. I have developed different proposals for public buildings, housing, urban planning projects, and interactive installations, liaising with consultants and coordinating teams, managing the production of drawings, outline and detail design, and producing documentation packages. I believe that the foundations of architecture are a constant learning, serious research and creative experimentation; consequently, I have focused my work on creating and building responsibility through architecture, leading groups and working on decision- making. QUALIFICATION Register Architect. Professional Council of Architecture, Colombia. [A25282003-79687326] Masters of Design Research Studies - Mediascapes. Southern California Institute of Architecture. Thesis on Architecture and Media: Behavioral space. Installation proposal for SCI-ARC Gallery 160. Supervisor: Jean Michel Crettaz, Marcelyn Gow. 2010- 2011. Published by Sucker PUNCH. Chroma[RED] March 2012. Bachelor of Architecture, Faculty of Architecture and Design. Los Andes University, Colombia. Thesis on Social Housing in Bogota - new development area. Master Planhouse model. Supervisor: Stefano Anzellini, Rodrigo Rubio, Andrs Orrantia. 1995- 2001. PROFESSIONAL RECORD 2011: ELECTROLAND, SKATE 1.0. Los Angeles, CA. United States. Sound and light installation. The A+D Museum. Installation. 2010 : MUTTER HOUSE: 1115 sq.ft. Jenesano, BOYACA. Colombia. Project manager and Design Architect responsible for schematic design, design development and complete construction documentation. Construction Manager. 2010 : YOPAL HOUSES: 1525 sq.ft- 1850sq.ft. Yopal, META. Colombia. Project manager and Design Architect responsible for schematic design, design development and complete construction documentation. 2009: CALERA 10: 1067sq.ft. CASA DE CAMPO -Calera, CUNDINAMARCA, Colombia. Project manager and Design Architect responsible for schematic design, design development and complete construction documentation. Construction Manager. Developed in collaboration with Arch David Mora. 2009: CALERA 12: 1427sq.ft .CASA DE CAMPO -Calera, CUNDINAMARCA, Colombia. Project manager and Design Architect responsible for schematic design, design development and complete construction documentation. Developed in collaboration with Arch David Mora. 2007: 109 HOUSE: 1745 sq.ft. Bogota, Colombia. Project manager and Design Architect responsible for schematic design, design development and complete construction documentation. Construction Manager. Developed in collaboration with Arch David Mora. Published by REVISTA DECORACION (NUM 11-marzo/08), EL TIEMPO -2008. 2006: CENTRAL: 1,745 sq.ft -349 units. Bogota, CUNDINAMARCA, Colombia.. Schematic Design, Supervision and technical audit of the work during Design and construction process. Developed under the direction of Prodesa.

2006: CANDELARIA HOUSE: 651 sq.ft. Bogota, Colombia. Project manager and Design Architect responsible for schematic design, design development and complete construction documentation. Construction Manager. Developed in collaboration with Arch David Mora. 2006: PARQUES DE LA 90 ETAPAS I, II: 28 apartments average per unit 820 sqft. Bogot, Colombia. Schematic Design, Supervision and technical audit of the work during Design and construction process. Developed under the direction of Prodesa. 2006: VIZCAYA ETAPA I COTA: 26 units average per unit 984 sqft .CUNDINAMARCA, Colombia. Schematic Design, Supervision and technical audit of the work during Design and construction process. Developed under the direction of Prodesa. 2005: LEISURE PAVILION: 394sp.ft : Choachi CUNDINAMARCA, Colombia. Project manager and Design Architect responsible for schematic design, design development and complete construction documentation. Construction Manager. Developed in collaboration with Archs Daniel Cardoso, David Mora. 2005: SALITRE ALTO: 270 units. Bogota, CUNDINAMARCA, Colombia. Schematic Design, Supervision and technical audit of the work during Design and construction process. Developed under the direction of Prodesa. 2004: SENDEROS DE FUNZA: 1100 units Mosquera, CUNDINAMARCA, Colombia. Schematic Design, Supervision and technical audit of the work during Design and construction process. Developed under the direction of Prodesa. 2003: BOSQUE DE TIBANICA: 3100 units. Soacha, CUNDINAMARCA, Colombia. Schematic Design, Supervision and technical audit of the work during Design and construction process. Developed under the direction of Prodesa. 2002: SANTA MARIA DEL RESTREPO: 60 apartments. Bogot, Colombia. OSPINAS & CIA. Design Architect responsible for schematic design, design development. Developed under the direction of VARGAS WILLIAMSON Architecture and Urban Planning. 2003: LA ESPERANZA: 48 apartments. Bogot, Colombia. OSPINAS & CIA. Design Architect responsible for schematic design, design development. Developed under the direction of VARGAS WILLIAMSON Architecture and Urban Planning. 2003: HOGARES MULTIPLES: Public contest for urban and architectural project sponsored by public institutions and the Colombian Society of Architects. ICBF-FONADE. Design Architect responsible for schematic design, design development. Developed under the direction of VARGAS WILLIAMSON Architecture and Urban Planning. 2003: SINDAMANOY II: 31,453.158 sq.ft, Bogot, Colombia. PEDRO GOMEZ & cia. Design Architect responsible for schematic design, design development. Developed under the direction of VARGAS WILLIAMSON Architecture and Urban Planning and PEDRO GOMEZ Y CIA. 2003: EL BOSQUE: 52,493.438 sq.ft Bogot, Colombia. PEDRO GOMEZ & cia. Design Architect responsible for schematic design, design development. Developed under the direction of VARGAS WILLIAMSON Architecture and Urban Planning, and OSPINAS & CIA. PUBLIC COMPETITIONS: FIRST PLACE, Public contest for urban and architectural project sponsored by public institutions and the Colombian Society of Architects, ICBF-FONADE. Design Architect responsible for schematic design, design development. Developed under the direction of VARGAS WILLIAMSON Architecture and Urban Planning. MENTION Sucker PUNCH. Center for urban farming. URBAN [air]. Urban Farm Park proposal for Brooklyn Borough, NYC.

SOFTWARE:

Rhino, Maya, AutoCAD, Sketch Up, Adobe Creative Suite, Processing, Arduino, Zbrush, and Microsoft Office.

You might also like