Project Design Lifecycle

Preliminary and tentative for discussion purposes only

Legends - Departments

P
Procurement

M
Marketing

A
Architecture

C
Contracts

BD
Business Development

PC
Projects Control

EM
Executive Management

TS
Technical service department

CT S
Construction team Statutory

L
Legal

DC AC
Accounts

IT
IT department

QQ
QC & QA

Drawings Control & Coordinator

MD

HR

QE
Quantity Estimation

AD
Administration Department

HD
Hospitality Department

SC Safety Controls

Maintenance Human Department Resource

Project Design Lifecycle Macro Overview


SUB PROCESS SUB ACTIVITY KEY - ACTIVITIES
Project Opportunity

BD

Plot Details

S EM
Pursue project

BD
Business Development team to develop project brief

Define key project parameters Screening out relevant proposal

EM BD

Project Brief BD
Design Basis

BD

Work out the feasibility of the project by getting inputs from various sources Business Plan

BD

Yes

EM EM

No

EM
BD

Proposal rejected

Executive Management team to review and approve project brief

A Design Brief
Architecture team to develop design brief based on project brief

Review of the design brief by the business development team

Review and approval of the design brief by the executive management

EM

Appointment of Architects/ Consultants


C

Appointment of Architects/ Consultants

Appointment of external architect/ consultants based on consulting strategy

Identify/ qualify/ Appoint

C
Award of work to architects/ consultants

PM

EM A

A
Concept Phase

A Preliminary/ Final Concept

TS

Preliminary concept presented by the architect/ consultant

Review and TS giving inputs on preliminary concept

BD S

Approval of preliminary concept EM

A TS Review of Final BD concept S

EM Approval of final concept

Project Design Lifecycle Macro Overview


SUB PROCESS Design Development Phase SUB ACTIVITY KEY - ACTIVITIES

TS

Preliminary Detail Design ST

A TS

Presenting Detail designs for the project with Technical services

Review of the detail designs

A S BD TS EM A TS S

Preparing preliminary budget (ROB)/ schedule based on the detail drawings

Ratifying cost/ schedule of project if necessary

PC EM

TS A Statutory Drawings A A Detail Design S S


Government Approvals
Approving detail designs submitted by architect/ consultants Statutory drawings is established

Statutory drawings is reviewed

S
Preparing Detailed order budget (DOB)/ BOQ and revising budget if required

PC

TS S S

Executive Management approves ratified budget/ schedule

EM

Statutory Approvals

Approval form government depts is obtained.

Project Design Lifecycle Macro Overview


SUB PROCESS SUB ACTIVITY KEY - ACTIVITIES

TS A
Drawings control and coordination

Receiving execution drawings at H.O. and checking if the drawings meet all the specified requirements

TS

Forwarding the drawings at site and updating the drawings management database

TS

Site raises a Request for information (RFI) in case it needs any clarification/ modification to the drawings

RFI is forwarded to all consultants with a cc marked to the design co ordination head TS

CT

CT A

Site Supervision Phase

TS A

Consultant gives the return back time based on the complexity of the clarifications

Change note is raised by the consultant to avoid any stoppage of work

TS A

CT

Revised drawings are received at H.O and check is done by the design coordination head

TS

Forwarding the drawings at site and updating the drawings management database

TS A

TS A
Periodic Inspections

Site checks the drawings for any clarification to be needed and closes the RFI

Periodic Meetings are conducted for resolving the pending RFI and also to check if the work is as per the drawings issued

A TS

CT

CT

PROJECT DESIGN LIFECYCLE

Process Overview

Home

1. Design basis

Masters

Process Process Overview Overview

2. Appointment of Architects/ Consultants

Key Inputs

Key Objectives

3. Concept phase

Key Activities

Process Owners

Project Design Lifecycle

4. Design development
Key Flowcharts

Key Formats

5. Statutory approval
Key Outputs KPM

6. Drawings control and coordination


MIS R&A

7. Periodic inspections
Help

6
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Process Overview

Home

1. Design Basis

1.1 Prepare Project Brief

Masters

Process Process Overview Overview

2. Appointment of Architects/ Consultants

1.2 Prepare Design Brief

Key Inputs

Key Objectives

3. Concept phase

Key Activities

Process Owners

Project Design Lifecycle

4. Design development
Key Flowcharts

Key Formats

5. Statutory approval
Key Outputs KPM

6. Drawings control and coordination


MIS R&A

7. Periodic inspections
Help

7
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Process Overview

Home

1. Design basis

Masters

Process Process Overview Overview

2. Appointment of Architects/ Consultants

2.1 Appointment of architect / consultant based on consulting strategy

Key Inputs

Key Objectives

3. Concept phase

Key Activities

Process Owners

Project Design Lifecycle

4. Design development
Key Flowcharts

Key Formats

5. Statutory approval
Key Outputs KPM

6. Drawings control and coordination


MIS R&A

7. Periodic inspections
Help

8
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Process Overview

Home

1. Design basis

Masters

Process Process Overview Overview

2. Appointment of Architects/ Consultants

Key Inputs

Key Objectives

3. Concept phase

3.1 Develop preliminary and final concept drawings

Key Activities

Process Owners

Project Design Lifecycle

4. Design development
Key Flowcharts

Key Formats

5. Statutory approval
Key Outputs KPM

6. Drawings control and coordination


MIS R&A

7. Periodic inspections
Help

9
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Process Overview

Home

1. Design basis

Masters

Process Process Overview Overview

2. Appointment of Architects/ Consultants

Key Inputs

Key Objectives

3. Concept phase

Key Activities

Process Owners

Project Design Lifecycle

4. Design development

4.1 Preparation of Detailed design

Key Flowcharts

Key Formats

5. Statutory approval
Key Outputs KPM

6. Drawings control and coordination


MIS R&A

7. Periodic inspections
Help

10
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Process Overview

Home

1. Design basis

Masters

Process Process Overview Overview

2. Appointment of Architects/ Consultants

Key Inputs

Key Objectives

3. Concept phase

Key Activities

Process Owners

Project Design Lifecycle

4. Design development
Key Flowcharts

Key Formats

5. Statutory approval

5.1 Approval from Statutory Department


Key Outputs

KPM

6. Drawings control and coordination


MIS R&A

7. Periodic inspections
Help

11
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Process Overview

Home

1. Design basis

Masters

Process Process Overview Overview

2. Appointment of Architects/ Consultants

Key Inputs

Key Objectives

3. Concept phase

Key Activities

Process Owners

Project Design Lifecycle

4. Design development
Key Flowcharts

Key Formats

5. Statutory approval

6.1 Receive execution drawings from Consultants


Key Outputs

KPM

6. Drawings Control and Coordination


MIS

6.2 Coordinate any changes through Change Note


R&A

7. Periodic inspections 6.3 Revision of drawings


Help

12
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Process Overview

Home

1. Design basis

Masters

Process Process Overview Overview

2. Appointment of Architects/ Consultants

Key Inputs

Key Objectives

3. Concept phase

Key Activities

Process Owners

Project Design Lifecycle

4. Design development
Key Flowcharts

Key Formats

5. Statutory approval
Key Outputs KPM

6. Drawings control and coordination


MIS R&A

7. Periodic inspections
Help

7.1 Conduct periodic site inspections

13
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Key Objectives

SOP Objectives
Home Masters

Process Overview

To specify procedures for the Project Design in order to increase consistency in the execution of the process To embed informational controls in the Project Design process To provide a monitoring framework in order to manage the performance of the Project Design function
Key Inputs

Key Objectives

Key Objectives

Key Activities

Process Owners

Project Design Objectives


Key Formats

Key Flowcharts

Assess feasibility of the project Develop project concept based on project and design brief Appointment of the external architect and other service consultants Step by Step design development for the project
R&A Key Outputs

KPM

MIS

Have effective drawings control and co ordination system

Help

14
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Process Owners & Responsibilities


Department Designation of Personnel
Director/ -Executive Head Business Development

Activities performed

Home

Business Development

Receive business proposals from various sources Prepare summary report of the proposals Screens out proposals based on pre-defined key - parameters Prepares list of Project Opportunities Follow up with marketing team to carry out Market Research Prepares / Validates Project Brief Prepares / Validates feasibility report Reviews / Approves Initial & Final Concept Plans Collect data regarding the plot details for the identified opportunities Reviews / Approves Concept Plans & Detail Design Plans Prepare preliminary / final statutory drawings Scrutinize the drawings received from the external architects / consultants Obtain statutory approvals Coordinates with the external architects / consultants for receiving drawings and sending to internal departments Maintaining and updating the Drawings Management Database Conducting Periodic Site Visit for checking the drawings register Coordinate for closing Request for Information raised by the drawings recipients

Masters

Process Overview

Key Inputs

Key Objectives

Key Activities

Process Owners

Process Owners

Statutory

Head - Design Head / Executive Management

Key Flowcharts

Key Formats

Key Outputs

KPM

Drawings Control & Coordinator


Head - Design Coordinator Management

MIS

R&A

Help

15
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Process Owners & Responsibilities


Department Designation of Personnel Activities performed

Home

Masters

Executive Management
Process Overview

Executive Director/ M.D. / C.E.O. / C.O.O. , Managing Director/ Vice all Head of Chairman Departments

Approves Business Model Approves Feasibility report Finalizes Go-No Go for the project Approves Project Brief Approves Design Brief Approves the appointment of the architect / consultants Approves the various designs / drawings received from external Consultants Approve budget / revised budget for the project
Key Flowcharts Key Activities Key Inputs

Key Objectives

Process Owners

Process Owners

Executive Director/ Head / Executive Managing Director

Key Formats

Marketing

Carry out / validate Market Research for identified project opportunities Prepares / Validates Design Brief Scrutinizes / Approves the various designs / drawings received from external Consultants Evaluates external Architect on technical parameters Approves the appointment letter of the external Architect / Consultant
R&A Key Outputs

Architecture
KPM

Head / Design Head - Design Manager Management

MIS

Help

16
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Process Owners & Responsibilities


Department Designation of Personnel
Head / Executive

Activities performed

Home

Contracts

Maintains and Update Architects Database Prepares / validates contract for appointment of consultants architect Identifies the various architects / consultants for the project Evaluates external architect based on financial parameters Approves the appointment letter

Masters

Process Overview

Key Inputs

Key Objectives

Key Activities

Process Owners

Process Owners

Projects Control

ProjectExecutive Head / Manager

Compiles Rough Order / Detailed Budget Compiles Preliminary / Final Budget


Key Flowcharts

Key Formats

Technical Service

Project Designer Head / Design Manger

Reviews / Approves the concepts / designs submitted by the external architects / consultants
Key Outputs

KPM

MIS

R&A

Help

17
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Sub - Process Owners


Project Brief

Business Development Team


Masters

Home

Process Overview

Design Brief

Design Management Group Architecture Team


Key Inputs

Key Objectives

Appointment of Architect/ Consultant

Design Management Group Contracts Team / Business Development Design Management Group Architecture Team / Technical Services / Business Development

Key Activities

Process Owners

Process Owners

Concept Phase

Key Flowcharts

Key Formats

KPM

Design Development

Design Management Group Architecture Team / Technical Services / Site Execution Team
Design Management Group / Site Statutory Team Execution Team
Designs Control Team Site Execution Team

Key Outputs

MIS

Statutory Approval

R&A

Help

Drawings control & Coordination

18

Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Design Basis
Key Inputs: Property Card
Masters

Home


Process Overview

Plot plan HUDA extract


Key Inputs Key Inputs

Key Objectives

Development Plan remarks Key Project Parameters Business Plan


Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

R&A

Help

19
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Design Basis > Prepare Project Brief


Key Activities: 1.1 Key Process Description Prepare Project Brief

Home

1. Based on preliminary assessment as per process for organisational growth, initiate proposals from 1. Business Development Team in different target cities receives various business location wise detailed feasibility. different sources such as brokers, land owners, business houses etc. 2. Short list cities/locations for consideration. 2. Based on the key project parameters defined by the Executive Management, the various proposals received by the Business Development Team would be screened. Key project parameters would 3. Prepare preliminary assessment report on shortlisted areas/cities/locations. include This would define the kind of Projects that would be undertaken by the company for its future expnasions.It would broadly coos, 4. Review with development team,includes & m for assessment and fit with product/brand standards.

Masters

Process Overview

Key Inputs

Key Objectives

Process Owners

Key Formats

Target Cities 5. If the project is found befitting initiate process for identification of land. Kind of development Minimum land size 6. Receive enquiries from land owners willing to enter into an agreement and proactively seek and initiate opportunities through agents. 3. On receiving a project opportunity, Information of the owner and plot details are ascertained by the Statutory Team (ST) and a Land Acquisition Report is compiled. 7. Review various opportunities. 4. Marketing Team carries out preliminary market research for the overall project for the screened 8. Conduct site visits for site under discussion (development team, COOs, S&M, as deemed appropriate. project opportunities.
9. Prepare preliminary feasibility on carries out detailed feasibility studies to determine the profitabilitydeal. 5. Business Development Team the basis of various scenarios (purchase/lease/license/jv) for the from And negotiate price on the basis of current market scenario, appropriateness of site in Taj portfolio. the FSI available for development of sales, cost of construction, land cost, TDR transfers, locality, available start discussion and demand commercial (structures specific to an industry/trade) 10. For the site,infrastructure, type oflegal checks. Involve representatives from legal and finance. or residential etc. and usage pattern. Feasibility to be carried out both in terms of Technical feasibility and economic viability. The inputs received from the Market research and Land acquisition report would be compiled in the feasibility report.

Key Key Activities Activities

Key Flowcharts

Key Outputs

KPM

MIS

R&A

Help

20
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Design Basis > Prepare Project Brief


Key Activities:

Home

Process Overview

11. Do a legal evaluation of the site. developed by the Executive Management and the feasibility report for 6. Based on the Business model the project, the Executive Management would decide whether project should be pursued or not. If the 12. Finalise terms of acquisition with owners, prepare the Project Brief and sign term sheet to be put up to project is finalized by Executive Management, If the proposal is rejected, the reason for same is management for approval. stated and sent to Business Development Team. If project is finalized then In house Architecture department would initiate Site Survey and prepare a Site Survey Report. Survey of the plot is conducted for development purpose through surveyors. Exact site dimensions, contours, conditions topographical information is collected and a Site layout report is prepared. A copy of site layout report is sent along with the project brief to the in-house architect department for developing the Design Brief.

Masters

Key Inputs

Key Objectives

7. 8.
Process Owners

Land acquisition team would proceed with the formalities for acquiring the land. Based on the inputs of the individual vertical specific reports for the project , broad requirements of the project will be conceptualized by a team comprising: C.E.O., M.D., Chairman, V.P. Sales/Marketing (residential or commercial as the case may be), V.P. Finance, V.P. Business Development, V.P. Statutory, V.P Projects, V.P. Commercial ( all HODs). It is recommended that the timeliness for conceptualization and preparing the Project Brief and forwarding it to in-house department for preparing Design Brief should be within 3 weeks (recommended) of purchasing site/plot. Business Development team shall capture the details of the project concept. Business Development team develops the Project Brief based on the projects concept. Project Brief shall reflect the type of project to be developed, the amenities to be provided, basic project aesthetics and the target group for project (based on market research). Project Brief is sent to Executive Management for approval. Executive Management reviews the Project Brief to check if the basic project concepts are captured and if there is any corrections required it is communicated to the business development team for rectifying it. Executive Management then approves and signs off the final Project Brief.

Key Key Activities Activities

Key Flowcharts

Key Formats

KPM

9.

Key Outputs

MIS

10 11

R&A

Help

12

21
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Design Basis > Prepare Design Brief


Key Activities: 1.2 Key Process Description Prepare Design Brief

Home

1. Once the board approves, purchase sent to in-house Architecture team for developing Design Brief Approved copy of Project Brief is land and complete land deal

Masters

Process Overview

2. Design Brief cost of the FSI available for residential, commercial, hospitality, IT building , 2. Prepare note onincludesdesign planning, put up to management for approval of appointment oftarget cost of construction and likely project concepts. consultants and execution of design planning. 3. Design Brief is forwarded to Business Development & Statutory Team for review. 3. If management approves, appoint concept design consultants and prepare design brief. Discuss the design brief with coo, development team, the departments are incorporated team, send to designer. case if 4. Changes if any recommended by operations and sales & marketing in the Design Brief. In

Key Inputs

Key Objectives

there are any changes required to the design brief, team to confirm or inform about modification within 3 working days (recommended) to the in house Architecture department. 5. 6. Business Development and Statutory team would approve the Design Brief. After approval of the Design Brief by the Business Development and Statutory Team, it is then forwarded to the Executive Management for approval. Executive Management finally signs off the

Key Key Activities Activities

Process Owners

Key Flowcharts

Key Formats

approved Design Brief .


Key Outputs

KPM

MIS

R&A

Help

22
Preliminary and tentative for discussion purposes only

Process: Prepare Project Brief


START

BASED ON PRELIMINARY ASSESSMENT AS PER PROCESS FOR ORGANISATIONAL GROWTH, INITIATE LOCATION WISE DETAILED FEASIBILITY

SHORT LIST CITIES/LOCATIONS FOR CONSIDERATION

PREPARE PRELIMINARY ASSESSMENT REPORT ON SHORTLISTED AREAS/CITIES/LOCATIONS REVIEW WITH DEVELOPMENT TEAM, COOs, S & M FOR ASSESSMENT AND FIT WITH PRODUCT/BRAND STANDARDS Y

FURTHER INPUTS REQUIRED N

INITIATE PROCESS FOR IDENTIFICATION OF LAND

RECEIVE ENQUIRIES FROM LAND OWNERS WILLING TO ENTER INTO AN AGREEMENT

PROACTIVELY SEEK AND INITIATE OPPORTUNITIES THROUGH AGENTS

GUIDELINES ON EVALUATION OF LAND OPTIONS (BDV/W/02)

REVIEW VARIOUS OPPORTUNITIES

LAND OPTIONS (PRESENTATIONS/NOT ES)

23

Process: Prepare Project Brief

LAND OPTIONS

CONDUCT SITE VISITS FOR SITE UNDER DISCUSSION (DEVELOPMENT TEAM, COOs, S & M, AS DEEMED APPROPRIATE

THIRD PARTY RESEARCH REPORTS INPUTS FROM CONSULTANTS

PREPARE PRELIMINARY FEASIBILITY ON THE BASIS OF VARIOUS SCENARIOS (PURCHASE/LEASE/LICENSE/JV) FOR THE DEAL

NEGOTIATE PRICE ON THE BASIS OF CURRENT MARKET SCENARIO, APPRPRIATENESS OF SITE IN TAJ PORTFOLIO

DRAFT TERM SHEET FOR THE SITE, START DISCUSSION AND LEGAL CHECKS. INVOLVE REPRESENTATIVES FROM LEGAL AND FINANCE

DRAFT TERM SHEET GUIDELINES ON DUE DILIGENCE OF SITE (BDV/W/03) SITE DOCUMENTS FROM OWNERS

DO A LEGAL EVALUATION OF THE SITE

TITLE CLEARANCE REPORT SIGNED TERM SHEET (BDV/F/04)

FINALISE TERMS OF ACQUISITION WITH OWNERS AND SIGN TERM SHEET TO BE PUT UP TO MANAGEMENT FOR APPROVAL

END

24

Process: Prepare Design Brief


START

PROJECT BRIEF

NOT APPROVED

BOARD APPROVAL

UPDATE DEVELOPMENT STRATEGY MAP

APPROVED

PURCHASE LAND AND COMPLETE LAND DEAL

IDENTIFY CONSULTANTS FOR DEVELOPMENT OF THE PROJECT.

PREPARE NOTE ON COST OF DESIGN PLANNING, PUT UP TO MANAGEMENT FOR APPROVAL OF APPOINTMENT OF CONSULTANTS AND EXECUTION OF DESIGN PLANNING.

NOT APPROVED

MANAGEMENT APPROVAL APPROVED APPOINT CONCEPT DESIGN CONSULTANTS

PREPARE PROJECT BRIEF, DISCUSS WITH COO, DEVELOPMENT TEAM, OPERATIONS AND S & M TEAM, SEND TO DESIGNER

25

PROJECT DESIGN LIFECYCLE

Design Basis
Key Outputs: Project Opportunities
Masters

Home


Process Overview

Site Survey Report Land Acquisition Report Market Research Report Feasibility report Project Brief Design Brief
Key Flowcharts Key Activities Key Inputs

Key Objectives

Process Owners

Key Formats

Key Key Outputs Outputs


KPM

MIS

R&A

Help

28 26
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Design Basis
Responsibility & Authority:
Head DMG

Home

Masters

Process Overview

Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

RR &A & A

Help

29 27
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Appointment of architects/ Consultants


Key Inputs: Consulting Strategy
Masters

Home

Architect/ Consultant database

Process Overview

Key Inputs Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

R&A

Help

30 28
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Appointment of architects/ Consultants


Key Activities: 2.1 Key Process Description Appointment of Architects/ Consultants

Home

Masters

1.

Executive Management communicates the consulting strategy for appointment of external Architect/ to the contracts department. Consulting strategy is decided by the Executive Management with consultation of the In-house Architecture and the Technical Service Team for appointment of external Architects and Consultants for the project.

Process Overview

Key Inputs

2.
Key Objectives

Contracts department initiates appointment of external Architect/ Consultant based on consulting strategy. External Architect is identified from Architect/ Consultant database maintained by Contracts/ In-house Architecture team.
Key Key Activities Activities

Process Owners

3.

Architects evaluation to be carried out on the basis of preset parameters laid down in a standard format. Preset parameters broadly to include fees, out of pocket expenses quoted, registration with the architecture council, relevant experience; clientele; financial background; adequacy of
Key Flowcharts

Key Formats

infrastructure; support team (total strength, qualification, relevant experience); sales area maximization, additional service consultancy provided. Technical evaluation is done by the Architecture department and financial evaluation is done by the Contracts Department and Evaluation report is prepared and forwarded to Contracts department who prepares the Comparison report for various external Architects/ Consultants identified. Comparison report is forwarded to Project Manager. Input is given by Project Manager on the Architects/ Consultants evaluation based on construction viability. 4. Executive Management finalizes appointment of external Architect/ Consultant based on the inputs received and the same is communicated to the Contracts / In-house Architecture / Technical service department.
Key Outputs

KPM

MIS

R&A

Help

29 31

Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Appointment of architects/ Consultants


Key Activities: 5. Contracts department prepares appointment letter of the external Architects / Consultants with all relevant terms and conditions. Letter of Appointment (LOA) to lay down the scope of work, deliverables, time schedule & fees (payment schedule) which would be offered to the appointed Architect/ Consultant. Letter of Appointment is forwarded to Architecture/ Technical Service Team for
Masters

Home

Process Overview

review. 6. Architecture/ Technical Service Team reviews the Appointment Letter and checks the terms and conditions and the same is forwarded to M.D/ C.E.O. 7. M.D/ C.E.O reviews the Appointment Letter and signs two copies. Signed copies of appointment letter is sent to the external Architect/ Consultant. 8. External Architect/ Consultant signs both the copies of the Appointment letter and returns one back to the Contracts department.

Key Inputs

Key Objectives

Key Key Activities Activities

Process Owners

Key Flowcharts

Key Formats

9.
KPM

Contracts department files the copy of the signed Appointment Letter in the contracts database.
Key Outputs

MIS

R&A

Help

32 30
Preliminary and tentative for discussion purposes only

Process: Appointment of Architects / Consultants


INPUTS 1
Executive Management Consulting Strategy Executive Management

PROCESS

OUTPUT

TS
Contracts Department

Communicates the appointment of external Architect/ Consultant based on consulting strategy

Architect/ Consultant database

BD Department Contracts / DMG

Notes

Consulting Strategy Consulting strategy would necessarily be decided by the executive management with consultation of the in-house architect and the Technical Service Team for appointment of external architects and consultants for the project

Identifies external Architect from Architect/ Consultant database maintained by Contracts/ In-house architect team

Short listed architect / consultant

BD Contracts Department
In-house DMG Architecture Evaluates Architect/ Consultant based on financial parameters Evaluates Architect/ Consultant on Technical parameters

2
Evaluation Report

Architect evaluation to be carried out on the basis of preset parameters laid down in a standard format. Preset parameters broadly to include fees, out of pocket expenses quoted, registration with the architecture council, relevant experience; clientele; financial background; adequacy of infrastructure; support team (total strength, qualification, relevant experience); sales area maximization, additional service consultancy provided.

33 31

Process: Appointment of Architects / Consultants


INPUTS PROCESS OUTPUT

Sends report to contracts department who prepares comparison report on evaluation of external Architects/ Consultants

Notes

Contracts

Comparison Report

The input of project Manager would be conditional based on project specific (like size of project, value, time period)

1
Project Manager gives input on the Architects/ Consultant evaluation based on construction viability

Executive Management

Finalizes appointment of external architect based on the inputs received

Finalized Architects / Consultants

34 32

Process: Appointment of Architects / Consultants


INPUTS
Finalized Architects / Consultant list

PROCESS G
Head, Projects Executive Management

OUTPUT

Standard format of Appointment Letter

Communicates the finalized Architects / Consultants to the BD DMG Contracts/ department

BD DMG Contracts /Department


Notes Appointment Letter The letter of appointment (LOA) to lay down the scope of work, deliverables, time schedule & fees (payment schedule). Architecture / Technical Service Team Prepares appointment letter of the external Architects / Consultants with all relevant terms and conditions

1
Appointment Letter

Reviews the appointment letter for checking terms and conditions

Approved Appointment Letter

35 33

Process: Appointment of Architects / Consultants


INPUTS PROCESS OUTPUT

BD / DMG Executive Management

M.D. / C.E.O. VP, Projects reviews the Notes

appointment letter and signs two copies

Signed copies of appointment letter by M.D. / C.E.O.

External Architect/ Consultant

Signs both the copies of the appointment letter and returns one back to the contracts department

Signed copies of appointment letter by external architect.

BD / DMG Contracts

Contracts BD / DMG files the Department copy in the contracts database

Contracts database

36 34

PROJECT DESIGN LIFECYCLE

Appointment of architects/ Consultants


Key Outputs: Evaluation Report
Masters

Home


Process Overview

Comparison Report Letter of appointment for Architects / Consultants


Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Key Outputs Outputs


KPM

MIS

R&A

Help

35 37
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Appointment of architects/ Consultants


Responsibility & Authority:

Home

Masters

Process Overview

Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

RR &A & A

Help

36 38
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Concept Phase
Key Inputs: Approved Design brief
Masters

Home

Process Overview

Key Inputs Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

R&A

Help

37 39
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Concept Phase - Develop Initial and Final Concept Drawings


Key Activities: 3.1 Key Process Description Concept Phase - Develop Initial and Final Concept Drawings

Home

1. Approved Design Brief with architect to develop Control & Coordinator to the external coo 1. Conduct kick off workshop is forwarded by Drawingsmaster plan with design direction from Architect. 2. The at least two master plan schemes 2. Developexternal Architect develops the preliminary concept for the project based on the Design Brief. It is

Masters

Process Overview

then forwarded to the in-house Architecture/ Technical Service Team for reviewing and giving inputs. 3. Verify it meets project brief, design direction and site usage/zoning requirements In-house Architecture/ Technical Service Team would check if the preliminary concept plans meets 4. Review basic projectwith coo & BD the master plan design. A check would be made by the Statutory Department for confirming if the concept confines to the statutory regulations. Also a check would be made by Business Development 5. Select one preferred scheme by COO & BD to be further developed Team for meeting the Basic Project Brief. 6. Complete the master plan. 3. After the review has been done by all these units and the necessary changes have 7. Conduct coordination workshop with design architect, municipal architect, interior designer, technicalbeen consultants, BD & TSG.plans are then sent across to the Executive Management for review and approval. incorporated, the
8. Receiveinternal detailing and buildfrom designer requirement detailing will be taken care by the In-house 4. The layouts & concept design to suit client

Key Inputs

Key Objectives

Key Key Activities Activities

Process Owners

Key Flowcharts

Key Formats

KPM

Architect department regulations, project brief, various service providers and which spaces 9. Verify it meets the zoningas per the tie-ups with thearea program, functional relationship of would then be forwarded to the external Architect for incorporating it. 10. Review concept design with operations 3. On approval of the preliminary concept plan by the Executive Management, external Architect would 11. Once approved by the coo, design consultant to prepare concept presentation for MD & senior develop detail the iteration till management and doconcept plans the concept design is approved. 4. Detail concepts should also include:

Key Outputs

MIS

R&A


Help

Unit plan Layout plan Elevations Area statement (sale, commercial, hospitality, etc.)

38 40

Preliminary and tentative for discussion purposes only

Process: Prepare Design Brief


PROJECT BRIEF BD DOC 11 AREA PROGRAMME TSG DOC 2 A/B/C DESIGN STANDARDS TSG DOC 1 A/B/C SITE PLAN FSI, ZONING REGULATION SITE CONDITION

START

CONDUCT KICK OFF WORKSHOP WITH ARCHITECT TO DEVELOP MASTER PLAN WITH DESIGN DIRECTION FROM COO

DEVELOP ATLEAST TWO MASTER PLAN SHCEMES

INPUT TO DESIGN CONSULTANT

NO

VERIFY IT MEETS PROJECT BRIEF, DESIGN DIRECTION AND SITE USAGE/ZONING REQUIREMENTS

REVIEW MASTER PLAN WITH COO & BD

NO

SELECT ONE PREFFERED SCHEME BY COO & BD TO BE FURTHER DEVELOPED MASTER PLAN SITE PLAN WITH ANALYSIS FLOOR PLAN ELEVATION

YES MASTER PLANNING COMPLETE X

39

Process: Prepare Design Brief


X
MASTER PLAN AREA PROGRAMME TSG DOC 2 A/B/C DESIGN STANDARDS TSG DOC 1 A/B/C PROJECT BRIEF BD DOC 11 SITE CONDITION STATUTORY & REGULATORY REQUIREMENT (PM DOC 4) NBC (TSG DOC 3) MUNICIPAL BYELAWS CONDUCT COORDINATION WORKSHOP WITH DESIGN ARCHITECT, MUNICIPAL ARCHITECT, INTERIOR DESIGNER, TECHNICAL CONSULTANTS, BD & TSG

RECEIVE LAYOUTS & CONCEPT DESIGN FROM DESIGNER

DESISGN CHECK LIST FOR CONCEPT STAGE TSG DOC 4

VERIFY IT MEETS THE ZONING REGULATIONS, PROJECT BRIEF, AREA PROGRAM, FUNCTIONAL RELATIONSHIP OF SPACES

COMMENTS NO REVIEW CONCEPT DESIGN WITH OPERATIONS YES COMMENTS

YES

INPUT TO DESIGNER

YES

NO REVIEW CONCEPT DESIGN WITH COO & BD YES NO APPROVED BY COO

DESIGN DELIVERABLES TSG DOC 5

DESIGN CONSULTANT TO PREPARE CONCEPT PRESENTATION FOR MD & SENIOR MANAGEMENT

NO

APPROVED 39 CONCEPT DESIGN STAGE COMPLETE END

CONCEPT DESIGN DOCUMENTATION POWER POINT PRESENTATION(ARC HITECTURE, INTERIOR DESIGN & LANDSCAPE) MOOD BOARDS

40

PROJECT DESIGN LIFECYCLE

Concept Phase
Key Outputs: Concept plans (Preliminary/ Detailed)
Masters

Home

Process Overview

Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Key Outputs Outputs


KPM

MIS

R&A

Help

41 46
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Concept Phase
Responsibility & Authority:

Home

Masters

Process Overview

Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

RR &A & A

Help

42 47
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Design Development
Key Inputs: Detail Concept Plans
Masters

Home

Process Overview

Key Inputs Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

R&A

Help

43 48
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Design Development
Key Activities: Guiding Principles

Home

Budget guidelines to ensure uniformity


Consistent usage of common terminology in terms of budget heads across the organization

Masters

Process Overview

Provide detailed break up of budget head cost through out the project life Disclosure of assumptions used. Consistency in usage of assumptions.

Key Inputs

Key Objectives

Usage of form and format prescribed for compiling budget costs. Additional details to be attached in the form of annexure. Periodic review, challenging and validation of the budget in the light of prevailing circumstances

Key Key Activities Activities

Process Owners

Procedure for amending budgets Procedure for reporting and holding periodic discussions
Key Flowcharts

Key Formats

KPM

MIS

4.1 Key Process Description Design Development - Preparation of Detail Design Schematic Stage Drawings 1. Conduct schematic design coordination workshop with design consultant. 1. Based on the Approved Detail Concepts, External Architect prepares Preliminary Design for the 2. Refine project. concept design to meet local zoning requirement, detailed area programme, function flow with circulation layout of all spaces with wall thickness, doors & windows. 2. Review of the Preliminary Design and virtual walk through is made by the in-house Architecture,, 3. Co-ordinate layout with structures and services (mechanical, electrical & plumbing). Statutory Department and Technical Service Team. They check if the designs meet the Basic Project Concepts. all any corrections are required it is then budget approved and accordingly, give comments to it 4. Review If spaces meet Taj design standards and communicated to the external Architect for getting the designers/ do value engineering (VE). rectified.
5. Do internal review with the operations, spa division and S&M and integrate their comments. 6. Ask consultants to prepare final documentation for schematic stage.
Preliminary and tentative for discussion purposes only

Key Outputs

R&A

Help

44 49

PROJECT DESIGN LIFECYCLE

Design Development
Key Activities:
4.2 Key Process Description their approval on it, it is finally sent to the Executive ManagementStage 3. After all these units give - Design Development - Preparation of Design Development for review Drawings and approval.

Home

Masters

Process Overview

4. On approval of the designs by the Executive interior designer, designs are forwarded to projects 1. Coordination with all discipline design architect, QSManagement, the landscape architect, structural, services (mechanical, fire, plumbing), lighting, facility planner, signage & security, life safety consultants. control department.
2. Review drawings & specification toto Project standards. 5. Preliminary Designs forwarded meet Taj Controls department which prepares the Preliminary Cost

Key Inputs

Key Objectives

Rough Order Budget. based on preliminary designs within 1 week of receipt of design. The 3. Accordingly, give comments to the designers/ do value engineering (ve). If there is a reduction in scope, redo the coordination with consultants else, review with inputs from the various compliance, regarding the preliminary cost would be compiled based on operation for operational department design standards compliance, amenity/ equipment list. expenditure to be incurred for the project. The departments would also include Sales and Marketing,
4. Do Engineering department, Accounts, Admin and HR. final coordination with all consultants.

Key Key Activities Activities

Process Owners

6. On the basis of preliminary cost, Preliminary budget 5. Receive tender drawings & specification from consultant. is compiled. Budget would include the entire
Key Formats

Key Flowcharts

project cost (Direct + Indirect) cost of construction per sq.ft. based on the Approved Conceptual 6. Review drawings, BOQ and specifications w.r.t. design deliverables. If there are comments, ask Plans. The allowed margin of to complete design +/- 10% (recommended) of the project cost consultants to redo tender drawingserror in this budget isdevelopment. 7. In case the budget is not within the target cost (Cost estimated at the time of project viability stage), MD/CEO ratifies budget to fit within the cost or vice versa and provides reason for the same. 8. Initial statutory drawing is prepared based on the Preliminary Designs approved by the Executive Management. 9. Review of initial statutory drawings is done by the in-house Architecture Team and the Technical Service Team.
R&A Key Outputs

KPM

MIS

Help

10.

If any corrections are required it is communicated to the Statutory Head and the in-house Architecture and Technical Service Team would agree upon the statutory details and drawings.

45 50

Preliminary and tentative for discussion purposes only

Process: Design Development Schematic Design Development


START CONCEPT PLAN DESIGN STANDARDS TSG DOC 1 A/B/C SERVICE STANDARDS TSG DOC 7 AREA PROGRAMME TSG DOC 2 A/B/C EQUIPMENT LIST TSG DOC 6 *DESIGN CONSULTANT DESIGN ARCHITECT LOCAL ARCHITECT MUNICIPAL ARCHITECT LANDSCAPE ARCHITECT STRUCTURAL CONSULTANT SERVICES FACILITY PLANNER LIGHTING

CONDUCT SCHEMATIC DESIGN COORDINATION WORKSHOP WITH DESIGN CONSULTANT*

REFINE CONCEPT DESIGN TO MEET LOCAL ZONING REQUIREMENT, DETAILED AREA PROGRAMME, FUNCTION FLOW WITH CIRCULATION LAYOUT OF ALL SPACES WITH WALL TICKNESS, DOORS & WINDOWS

STATUTORY & REGULATORY REQUIREMENT (PM DOC 4) NBC (TSG DOC 3)

CO-ORDINATE LAYOUT WITH STRUCTURES AND SERVICES (MECHANICAL, ELECTRICAL & PLUMBING)

REVIEW ALL SPACES MEET TAJ DESIGN STANDARDS AND BUDGET APPROVED

COMMENTS ON DESIGN OR VE NO INTERNAL REVIEW

YES

PUBLIC AREAS COO OPERATION

GUEST ROOMS COO OPERATION

F&B (KITCHEN RESTAURANT) COO OPERATION

SPA SPA DIVISI ON

SIGNAGE MAR KETIN G

BOH OPE RATI ON

YES COMMENTS NO SCHEMATIC DESIGN STAGE COMPLETE SHEMACTIC DESIGN DOCUMENT FROM ALL CONSULTANTS DESIGN DELIVERABLES

END

46

Process: Design Development DD Stage


START CONDUCT DETAILED DD WORKSHOP WITH DESIGN CONSULTANTS DESIGN CHECK LIST TSG DOC 4 DESIGN STANDARDS TSG DOC 1 A/B/C SERVICE STANDARDS TSG DOC 7 IT STANDARDS TSG DOC 8

CO-ORDINATION WITH ALL DISCIPLAINE DESIGN ARCHITECT, QS INTERIOIR DESIGNER, LANDSCAPE ARCHITECT, STRUCTURAL, SERVICES (MECHANICAL, FIRE, PLUMBING), LIGHTING, FACILITY PLANNER, SIGNAGE & SECURITY, LIFE SAFETY CONSULTANTS REVIEW DRAWINGS & SPECIFICATION MEETS TAJ STANDARDS YES NO VALUE ENGINEERING YES NO

COMMENTS QS COST P PLAN VALU ENGINEERING RECOMMENDATION BY QS

REDUCE SCOPE

PUBLIC AREAS OPERATION

GUEST ROOMS OPERATION

KITCHEN CHEF

SPA SPA DIVISION

SIGNAGE MARKETING

BOH OPERATION

NO

REVIEW WITH OPERATION FOR OPERATIONAL COMPLIANCE, DESIGN STANDARDS COMPLIANCE, AMENITY/ EQUIPMENT LIST ANY CHANGES ADVISED YES FINAL CO-ORDINATION WITH ALL CONSULTANTS RECEIVE TENDER DRAWINGS & SPECIFICATION FROM CONSULTANT

STATUTORY & REGULATORY REQUIREMENT (PM DOC 4) NBC (TSG DOC 3)

REVIEW DRAWINGS, BOQ AND SPECIFICATIONS WRT DESIGN DELIVERABLES YES COMMENTS NO RECEIVE TENDER DRAWINGS & SPECIFICATIONS DD PHASE COMPLETE TENDER DOCUMENT

47

PROJECT DESIGN LIFECYCLE

Design Development
Key Outputs: Preliminary Designs
Masters

Home


Process Overview

Initial Statutory Designs Preliminary Cost Preliminary Budget (Rough Order) Approved Detail Designs Bill of Quantities (BOQ) Detailed order budget (DOB) Ratified Cost of Budget
Key Flowcharts Key Activities Key Inputs

Key Objectives

Process Owners

Key Formats

Key Key Outputs Outputs


KPM

MIS

R&A

Help

48 58
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Design Development
Responsibility & Authority:

Home

Masters

Process Overview

Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

RR &A & A

Help

49 59
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Statutory Approvals
Key Inputs: Detailed Designs
Masters

Home

Initial Statutory Drawings

Process Overview

Key Inputs Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

R&A

Help

50 60
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Statutory Approvals
Key Activities: 5.1 Key Process Description Statutory Approvals - Approval from Statutory Department

Home

Masters

1.

Approved copy of detail designs are sent to the Statutory Department for revising the initial Statutory Drawings (if required).

Process Overview

2.

Corrections if any in the Statutory Drawings has to be approved by the in-house Architecture and Technical Service Team. Final statutory drawings are then sent to the required Government department for getting the required approvals. In case if any changes are required at this stage, the Statutory department would communicate it to in-house Architecture, Technical Service and external Architect to get it changed. Statutory drawing is submitted to the Government departments for approvals. In case drawings are not passed by Government department, permissible changes are made. Any change, to the drawings, is to be made only by the in-house Architecture/ Technical Services department in consultation with the respective external Consultants.

Key Inputs

Key Objectives

3.

Key Key Activities Activities

4.
Process Owners

5.
Key Formats

Key Flowcharts

6.

Key Outputs

KPM

7.
MIS

Once approval is received for the drawings, a copy is send to Drawings Control and Coordinator for his records.
R&A

Help

51 61
Preliminary and tentative for discussion purposes only

Process: Statutory Approvals


INPUTS
Signed copy initial statutory drawings

PROCESS U
Statutory Department

OUTPUT

Final Statutory drawings prepared

Final Statutory Drawings

Detail Designs

Send drawings for approval to government department

Yes
Notes Is approval obtained

Send copies of approved drawings to the in-house Architecture / Technical Service Team

Approved Statutory Drawings

No
The changes required are communicated to the in-house Architecture, Technical Service and the external Architect External Architect Revised Detail Designs

Prepares revised detail designs

62 52

Process: Statutory Approvals


INPUTS PROCESS S
DMG In-house Architecture / Technical Service
Revised Detail Designs Approved revised detailed designs

OUTPUT

Reviews the revised detailed designs

Are revisions approved Notes

No

Yes
The revised detail designs are sent to Statutory Team to get necessary revisions in the Statutory Drawings

63 53

PROJECT DESIGN LIFECYCLE

Statutory Approvals
Key Output: Revised detail designs
Masters

Home

Approved revised Statutory drawings

Process Overview

Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Key Outputs Outputs


KPM

MIS

R&A

Help

54 64
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Statutory Approvals
Responsibility & Authority:

Home

Masters

Process Overview

Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

RR &A & A

Help

55 65
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Drawings Coordination and Control


Key Inputs: Approved Detailed Design
Masters

Home

Process Overview

Key Inputs Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

R&A

Help

56 66
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Drawings Coordination and Control > Receive execution drawings from Architects / Consultants
Key Activities: 6.1 Key Process Description - Drawings Control and Coordination - Receive execution drawings from Consultants 1. The Document Control and Project Manager Drawings Coordination Head receives the Architects / Consultants drawings at HO. The drawings received could either be Advance copy meant for study purposes or a regular copy meant for execution purposes. The drawings are accompanied by a Transmittal Note. A Transmittal note contains a drawing code number, description of the work area covered by drawing and the total number of copies sent for that particular type. The purpose (study OR good for constructn.) of the execution) drawing is clearly mentioned on the transmittal note and on the drawing itself. 2.
Key Key Activities Activities
Key Inputs

Home

Masters

Process Overview

Key Objectives

Process Owners

PM The Document Control and Coordinator conducts a prima facie check of the drawings by referring to Drawings

the recent most minutes/ conversation/ email correspondence to ensure that the drawings sent are absolutely up to date and as per recent most requirements. In case the drawings are not as per
Key Flowcharts

Key Formats

PM requirements, Document Control and Coordinator makes his comments and sends back the drawings Drawings

to the Architects/ Consultants for revisions. 3.


KPM

Design Architecture Group The drawings are then sent to the in-house Managementand Technical Service Team for their review

Key Outputs

and inputs. 4. The respective aforementioned units approves it or makes a note for necessary changes required. If there are any corrections required it is sent back to the external Architect / Consultant for the same modifications.
R&A

MIS

5.

Help

57 67
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Drawings Coordination and Control > Receive execution drawings from Architects / Consultants
Key Activities: 6. If the drawings meet the requirements then it is updated in the Drawings Management database. The database stores drawings records for each Consultant. The database gives a trail into the history of any drawing right from its advance stage to good for execution and superseded status date wise.
PM The DocumentControl and Coordinator signs all copies. Drawings
Masters

Home

Process Overview

Key Inputs

Key Objectives

Key Key Activities Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

R&A

Help

68 58
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Drawings Coordination and Control > Coordinate any changes through Change Note
Key Activities: 6.2 Key Process Description - Drawings Coordination and Control - Coordinate any changes through Change Note 1. Copies of Drawings are sent to Site-in-charge, Project Management Team, all other Consultants and the Projects Controls department. One copy is maintained at HO with Drawings Control and Coordinator. 2. The recipients reviews the drawings and if there are no corrections/ clarifications sorted then the copies are updated in the recipients Master Folder. Drawings register is also updated at the site 3. If there are any comments/ observations/clarifications to be sorted, the Construction Team has a system of (Request for information) RFI where in any Technical query/ information is to be made only in writing or mail. The query is communicated through emails/ fax to the Architects/ Consultants
PM and a cc is marked to the Document Control and Coordinator. Any queries, omissions, corrections are Drawings
Key Flowcharts Key Inputs

Home

Masters

Process Overview

Key Objectives

Key Key Activities Activities

Process Owners

Key Formats

pointed out by written correspondence only. Architect/ Consultant addresses the RFI. It analyses the problem and determines the response time. If it is a simple clarification, Consultant responds within one working day with solution. 4. In case it is not a simple clarification, the Consultant gives the time period by which the query would be resolved.
R&A Key Outputs

KPM

MIS

5.

A Change Note is a temporary arrangement made to avoid any stoppage of work. The Change Note deals only with the area of change. The Architect/ Consultant makes the change note. The PM Change Note is signed by the Document Control and Coordinator. Drawings

Help

69 59
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Drawings Coordination and Control > Revision of drawings


Key Activities: 6.3 Key Process Description - Drawings Coordination and Control - Revision of drawings

Home

Masters

1. 2.
Process Overview

Consultant issues Revised Drawings to respective recipients. Revised Execution Drawings along with Transmittal Note are then sent by the Architects and PM Consultants to the DocumentControl and Coordinator. Drawings
PM The DocumentControl and Coordinator conducts a prima facie check of the drawings. Drawings

Key Inputs

3.
Key Objectives

4.

In case drawings are not as per requirements, comments are made by the DocumentControl and Drawings
PM Coordinator and the drawings are sent back to the Architects/ Consultants for revision. Revised

Key Key Activities Activities

Process Owners

Execution Drawing is prepared. 5. In case drawings are as per requirements, Drawings are updated in the Drawings Management
PM database. The DocumentControl and Coordinator signs all copies and sends to all the recipients. Drawings
PM Master folders are updated byDocument Control and Coordinator Drawings
Key Flowcharts

Key Formats

6.
KPM

PM Site enters the revised version in the Drawings Register. The Document Control and Coordinator Drawings

Key Outputs

conducts a weekly check of the Drawings Register at site. The Project Manager/ Site-in-charge ensures that the revised copies are updated in the Master folders maintained by Site, even by the Contractor. The marking of drawings as superseded will be the responsibility of the Site-in-charge

MIS

(even in case of contractors) and similarly the practice is to be followed by Projects Control Department.

R&A

Help

60 70
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Drawings Coordination and Control > Revision of drawings


Key Activities: 7. Recipients issue a closing email for closing the RFI. Closing mail is sent to the consultant within 2 working days. A CC is marked to the Drawings Control and Coordinator. 8.
Document The weekly meeting is attended by all the recipients and the Consultants and the Drawing Control
PM and Coordinator to discuss and close pending RFI. Timelines for solving pending RFI s will be
Masters

Home

Process Overview

determined. 9.
Key Objectives

Key Inputs

Minutes of the meeting is prepared and sent to C.O.O./ C.E.O. for review.
Key Key Activities Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

R&A

Help

61 71
Preliminary and tentative for discussion purposes only

Process: Drawings Coordination and Control - Receive execution drawings from Architects / Consultants
INPUTS
Detailed Designs

PROCESS
External Architect / Consultant prepares Execution Drawings

OUTPUT
Execution Drawings

External Architect / Consultant

Drawings Control and Coordinator

Transmittal Note

Notes

Execution drawings are received from the Consultants by the Drawings Control and Coordinator

Transmittal note contains a drawing code number, description of the work area covered by drawing and the total number of copies sent for that particular type. The purpose (study OR good for execution) of the drawing is clearly mentioned on the transmittal note and on the drawing itself. The Drawings Control and Coordinator conducts a prima facie check of the drawings by referring to the recent most minutes/ conversation/ email correspondence to ensure that the drawings sent are absolutely up to date and as per recent most requirements. In case the drawings are not as per requirements, Drawings Control and Coordinator makes his comments and sends it back the drawings to the Architects/ Consultants for revisions.

Conducts a prima facie check of the drawings Drawings are sent to the Design Manager in the Architecture and Technical Service Department Approved Execution Drawings

A TS

Are drawings as per requirements?

Drawings Control and Coordinator No Comments are made by Drawings Control and Coordinator and sent back to the Architects/ Consultants for revision Yes Drawings are updated in the Drawings Management Database and signed off by the Drawings Control and Coordinator

Drawings management database

72 62

Process: Drawings Coordination and Control - Coordinate any changes through Change Note
INPUTS
Drawings management database

PROCESS
Copies are sent to the recipients for their records and to the site for execution

OUTPUT
Execution Drawings

1
Recipients

Transmittal Note

All the recipients go through the drawings Notes

Site-in-charge, Project Management Team, Contractors, all other Consultants and Projects Controls department Site enters the revised version in the Drawings Register. The Drawings Control and Coordinator will conduct a weekly check of the drawings register at site. The Project Manager/ Site-in-charge will ensure that the revised copies are updated in the Drawings Register maintained by Site, even by the Contractor. The marking of drawings as superseded will be the responsibility of the Site-incharge (even in case of contractors) and similarly the practice is to be followed by Projects Control department. Yes

Construction Team

Are their any clarifications to be sorted?

Construction Team

No

2
Request for information (RFI) email/ fax is sent to the respective consultant with a cc to Drawings Control and Coordinator Copies are received and Master folders are updated by the copies and the Drawings Register is updated at site

Updated Drawings Register

RFI raised

73 63

Process: Drawings Coordination and Control - Coordinate any changes through Change Note
INPUTS
RFI raised

PROCESS
Consultant addresses the RFI. It analyzes the problem and determines the response time

OUTPUT

Is the clarification simple? Yes No

Notes

A Change Note is a temporary arrangement made to avoid any stoppage of work. The Change Note deals only with the area of change. The architect / consultant makes the change note. The Change Note is signed by the Drawings Control and Coordinator

1
Consultant will respond within one working day with solution Change Note issued

Consultant would give a return back time period within which the query would be resolved

Change Note issued

External Architect/ Consultant

External Architect/ Consultant prepares revised drawings

Revised Drawings

74 64

Process: Drawings Coordination and Control - Revised Drawings


INPUTS
Revised Execution Drawings

PROCESS
External Architect/ Consultant issues revised drawings

OUTPUT
Revised Execution Drawings

Drawings Control and Coordinator Revised Execution drawings are received from the Consultants by the drawings Control and Coordinator Notes Conducts a prima facie check of the drawings

Transmittal Note

Drawings are sent to the Design Manager in the Architecture and Technical Service department

Approved Revised Execution Drawings

A TS

Are drawings as per requirements?

No

Drawings Control and Coordinator

Yes

Comments are made by drawing coordinator and sent back to the Architects/ Consultants for revision

Drawings are updated in the Drawings Management Database and signed off by the Drawings Control and Coordinator

Drawings management database

75 65

Process: Drawings Coordination and Control - Revised Drawings


INPUTS
Drawings management database

PROCESS
Copies are sent to the recipients for their records and to the site for execution

OUTPUT
Revised Execution Drawings

Transmittal Note Recipients

All the recipients go through the drawings Notes

Are their any clarifications to be sorted?

Updated Drawings Register

Construction Team

RFI closing mail will be issued to all No

Yes Conduct a weekly meetings at site with respective Consultant to discuss and close pending RFI

Copies are received and Master folders are updated by the copies and the Drawings Register is updated at site

Minutes of Meeting

Minutes of meeting are sent to C.E.O. / C.O.O. for review

76 66

PROJECT DESIGN LIFECYCLE

Drawings Coordination and Control


Key Outputs: Approved Execution Drawings
Masters

Home


Process Overview

Transmittal Note Change Note Updated Drawings Management Database Revised Execution drawing Updated drawings register RFI Minutes of Meeting
Key Flowcharts Key Activities Key Inputs

Key Objectives

Process Owners

Key Formats

Key Key Outputs Outputs


KPM

MIS

R&A

Help

67 77
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Drawings Coordination and Control


Responsibility & Authority:

Home

Masters

Process Overview

Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

RR &A & A

Help

78 68
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Periodic inspections
Key Inputs: Previous weeks Minutes of Meeting
Masters

Home

Process Overview

Key Inputs Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

R&A

Help

69 79
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Periodic inspections
Key Activities: 7.1 Key Process Description Periodic inspections - Conduct periodic site inspections

Home

Masters

1.

Periodic inspection visits are made to the sites by the Drawings Control and Coordinator . The inspection is conducted twice or thrice a week. The number of trips per week increase as the project reaches its finishing stages.

Process Overview

Key Inputs

2.
Key Objectives

Observations are made and documented in a Site Visit Report A coordination meeting is held once a week at site with the Consultants, Site Engineers and the V.P. Projects to discuss the observations. The plan of action is to be discussed in the meeting.
Key Key Activities Activities

3.

Process Owners

4. 5.

Suitable plan of action is developed for any rectifications and it is then checked during the next visit. If the rectifications are appropriate, Site visit report is updated If the rectifications are not appropriate, V.P. Projects is informed for immediate action
Key Flowcharts

Key Formats

6.

Key Outputs KPM

MIS

R&A

Help

70 80
Preliminary and tentative for discussion purposes only

Process: Periodic Inspections - Conduct periodic site inspections


INPUTS
Previous weeks minutes of meeting

PROCESS
Drawings Control and Coordinator

OUTPUT

1
Drawing control and coordinator makes periodic visit at site A check is made by him to see if the Drawings Register at site is updated and in synchronisation with the Master Drawings Database A report of observations made is noted by the personnel Observations made are discussed with the site engineers, project manager Suitable plan of action is developed for any rectifications Rectifications are checked during the next site visit Site Visit Report

Notes

Periodic inspection visits are made to the sites. The inspection is conducted twice or thrice a week by the in house architect. The number of trips per week increase as the project reaches its finishing stages.

CT

Are the rectifications appropriate? No

Yes

Updated Site Visit Report

Inform V.P. Projects for immediate action

81 71

PROJECT DESIGN LIFECYCLE

Periodic inspections
Key Outputs: Site Visit report observations
Masters

Home

Process Overview

Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Key Outputs Outputs


KPM

MIS

R&A

Help

72 82
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Periodic inspections
Responsibility & Authority:

Home

Masters

Process Overview

Key Inputs

Key Objectives Key Activities

Process Owners Key Flowcharts Key Formats

Key Outputs KPM

MIS

RR &A & A

Help

73 83
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Key Formats

Home

Budget
Checklist for the Design Inputs to be provided to Architect / Consultants
S r.no . Item s D etails R em ar ks 01 Plot lay out. Boundary of plot, existing struc tures in the plot, u/g s erv ice lines, loc ation of trees, N -S direction, lo cation of ov erhead H T line, Acc essibility to the main road, contour lay out w ith levels , open spac e, s ide m arg ins on all sides. 02. 03. 04. 05. 06. 07. To tal FS Av I ailable. H ight restrictions e . F loor to floor height Stilt floor height. M inim um w idth o m f ain staircase M inim um w idth o fire f escape staircase 08. R fuge floor area and e location 10. 11. Allowable floor plate. C m o m on am enities Allowable F SI 12 13 Distanc e betw een tw o buildings Distanc e from internal road to building face. 14. M inim um green area required. D rgs attached

Checklist for the Design Inputs to be provided to Architect / Consultants


ORIGINAL BUDGET
Sr No Cost Head

Masters

ACTUALSTILL DATE

BALANCETO COMPLETION

REVISED BUDGETS

VARIANCES

Measuremen Measureme Quantit Measureme Measureme Measureme DETAILED REASONS Quantity Rate/unit Amt Rs Rate/unit Amt Rs Quantity Rate/unit Amt Rs Quantity Rate/unit Amt Rs Quantity Rate/unit Amt Rs t Unit nt Unit y nt Unit nt Unit nt Unit FOR VARIANCE

Process Overview

Key Objectives

1 Peliminaries Land Development Soil investigati on Excavati on Anti Termite treatment Others 2 Civil works . Mate ria ls Cement Ste el RMC Other Materi als Labour Only Mate ria ls and labour Wate r proofing

Key Inputs

Key Activities

Process Owners Key Flowcharts Key Formats Key Formats

Drawing Control Register


Drawing Control Register
Site: Building No: Drawing Title: Drawing Details Date of receipt Status of drawing No of copies sent to contractor Signature/ thumb impression of the contractor No. of copies received Notes: 1. Date of receipt to be mentioned in dd/mm/yy format 2. Status of drawing to abbreviated as: a. ADV. for an advance copy. b. GFC for a good for construction drawing c. SUP for a superseded drawing by a revised drawing. 3. Number of copies in figures. 4. R1, R2 etc. are denoting number of revisions for the same drawing. Project Name: Wing No: Drawing No: R4 R5
Project Name: Date of evalua tion: Parame te r W eight s ed s core
( N o te )

Evaluation of Architects
Evaluation of Architects
Score allott ed Arc hite ct1 Arc hite ct2 Archite ct3 Archite ct4 Archite ct5 Archite ct6 Archite c t7

Key Outputs

KPM

R1

R2

R3

R6

R7

R8

R9

R10

Supe riorit y of concept dra wings sales are a maximiz a tion Fees quote d Out of poc ket expenses quote d Rele va nt experie nc e Clientele (attac h note separately ) Financial backgrou nd (Last 3 ye ars turnover) Ade quac y of office infrastruct ure (De ta ils of equipmen t)

MIS

R&A

Help

74 84
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Key Formats

Home

Selection Criteria of Architects and Consultants


Selection Criteria of Architects and Consultants
1. Name of Architect / Consultant Contact Person: Address: Tel no(s): E-mail ID

PROPOSAL cum GO-NO-GO Template


PROPOSAL cum GO-NO-GO TEMPLATE
City: ________________ Prop erty Ownersh ip: 1) 2) 3) Property Name Owners (Basic back ground) Owner Contact Details Broker Broker contact Title (Freehold/Leasehold) & Conditions Sr. No: ______________ Date: ______________

Masters

Process Overview

2.

Fax N o: Projects completed for our company previously. {A ttach separate sheets if required}

Yes / No ___________ If yes, Name of Proje ct_______________ Re sidential / comme rc ial__________ No. Of floors___________ Built up a re a in sq.ft____________ Cost of Project Rs in lacs ____________

4) 5) 6)

Key Inputs

Prop erty Details: 1) 2) 3) 4) 5) 6) 7) 8) 9) Location Area of Plot FSI Zoning Category ULC Town Planning / Reservations / CRZ Neighbour Basic infrastructure (wat er, electricity, approach road) Restrictions, if any

3.

Projects done for other clients [Attach separate sheet if require]

Name of c lient___________ Name of Proje ct_______________

Key Objectives
4. 5. Qualification & Experience Member of Institute of Indian Architects Others if, any Does have in house team of other professional Consultants [R CC / Elect/ Plumb / HV AC/ Landscape]

Re sidential / comme rc ial__________ No. Of floors___________ Built up a re a in sq.ft____________ Cost of Project Rs in lacs ____________

Commercial: 1) Indicative prevailing selling pri ce a. b. 2) l and & fini shed product (Vetted by Sal es & Marketing department)

Key Activities

Yes / No

Indicative prevailing construction cost (Vetted by t he proj ects department ) Expected Considerat ion Terms of payment

6.

Yes / No

3) 4)

Process Owners Key Flowcharts Key Formats Key Formats

LAND/ PLOT Ownership details


LAND/PLOT OWNERSHIP DETAILS
a) N a m e o f the L a nd O w ne r : __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ _ __ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _
P HY ICA S L FA CT O S R C lim at e Prevailing winds Direction

Site Evaluation Checklist


Site Ev alua tion C he cklist

Key Outputs

KPM

b)

A dd r e s s

_ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __

__ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ _ __ __ _ c) d) C o n ta c t te le p h on e n u m b e r s : _ __ __ _ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ F re e ho ld / L e a s e h ol d : _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ _ __ __ _ e) L e a s e C on d ition s : _ __ __ _ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ _ __ __

To pog raphy Legal property description, including limits of property, easement, rights of way, and north indication Topographic maps and aerial photos Potential problem areas during construction Existing access and circulation Vehicular Pedestrian Drainage canals: rivers, streams, marshes, lakes, ponds, etc. Natural and built Alignments and gradients Pattern and direction Surface drainage Maximum flood levels Frequently flooded areas Unique site features

__ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ _ __ __ _ f) T itle D o c u m e n ts : __ _ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _

G EO EC T H N IC L/S A OIL S Basic surface soil type: sand, clay, silt, rock, shale, gravel, loam, limestone, etc. Rock and soil type: character/formation and origin Geologic formation process and parent material Inclination Bearing capacity Bedrock Depth to bedrock Bedrock classification Seismic conditions Environmental hazards U IL T IT IES Potable water Electricity

__ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ _ __ __ _ g) P os s e s s io n de t a ils : __ _ __ __ _ __ _ __ _ __ _ __ _ __ __ _ __ __ _ __ _ __ _ __ _ __ _ __ _ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ _ __ __ _ h) E x ist in g u s e rs : _ _ __ __ _ __ _ __ _ __ _ __ _ __ _ __ __ _ __ __ _ __ _ __ _ __ _ __ _ __ _

MIS

R&A

__ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ _ __ __ _ i) T e na n ts / O c c u pie r s : _ __ __ _ __ _ __ _ __ _ __ _ __ __ _ _ ___ _ __ _ __ _ __ _ __ _ __

__ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ _ __ __ _ j) E n c u m b ra n c e s / P r op o se d A c q uis itio ns : __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __

Gas Telephone Cable television Sanitary sewer service Storm drainage (surface, subsurface) Fire protection

__ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ _ __ __ _ k) B r o ke r : N am e : __ _ __ _ __ __ _ __ _ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _ __ _ _ __ __ _ __ _ __ __ _ _ __ __ _ __ _ __ __ _ __ _ __ __ _ __ _ __ _ __ _

T e l. N o . 1.

R e m a rk s : __ _ __ _ __ _ __ _ __ __ _ __ _ _ __ __ _ __ __ _ _ __ __ __ _ __ _ _ __ __ _ __ __

Help

IM M E DIA E SU T R RO N U DIN G S

75 85
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Key Formats

Home

PLOT DETAILS
PLOT DETAILS
Area of the Plot: i. ii. As per Ownership Documents As per Property Cards Actual at Site : : :

PROJECT VIABILITY
PROJECT VIABILITY
Input from Sales & marketing department 1. 2. 3. 4. Sales Phasing schedule, Sales price being over & above the peak market price (being a fixed percentage on peak market price based on companys premium cap), Recovery/receivables schedule cash inflow

Masters

Process Overview
a. b. c. d. e. f.

iii

Survey Nos. : _________________________________________________ C. S. Nos. : ___________________________________________________ Location plan : ________________________________________________ Zone : _______________________________________________________ Reservations (with area) : _______________________________________ Surroundings : ________________________________________________ Access : ______________________________________________________ CRZ Applicability : ____________________________________________ Restrictions : _________________________________________________ (Defense / Religious Place / School / Heritage/ MMRDA / Wireless/ Nalla, Power Lines, Wells etc) TDR Receiving Zone ? _________________________________________ Height Restrictions : ___________________________________________ Other Remarks : ______________________________________________

Key Inputs

Inputs from In-house architectural department 1. Mark-up on FSI to arrive at saleable area, Inputs from the Project department 1. 2. 3. Phases of construction Cost of construction Cash outflow

Key Objectives

g. h. i.

j. k. l.

Inputs from the Finance & Accounts department 1. Funding options upfront, bank loans 2. Finance cost 3. Overheads

Key Activities

Process Owners Key Flowcharts Key Formats Key Formats

APPROVAL TEMPLATE
APP RO VAL TE M P L ATE
City: ________________ 1. Price Highest pri ce: Lowest price: Terms of the deal 2.1) 2.2) 2.3) 2.4) Sr. No: ______________ Date: ______________

Key Outputs

KPM

1.

2.

Assump tions 3.1) 3.2) 3.3) 3.4) 3.5)

MIS

R&A

Help

76 86
Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Key Performance Measures

Sno.

De partment

Home
1

Business Dev elopment

Statutory

Process Overview
3

Design Mgmt. Architecture


Architecture

Design Mgmt.

Key Objectives

Design Mgmt./ Business Dev. Contracts Design Mgmt./ Contracts/ Business Dev. Architecture

Process Owners

Key Formats

Architecture

Design Mgmt.

Measure Conv ersion factors of the number of proposals receiv ed to those which are ev aluated to be feasible Collection of required documents by the Statutory Team Time taken to prepare design brief Number of rev isions made to the Design Brief before approv al by the Team Time taken for Architect/ Consultant selection as compare to standard timeliness defined Variance in Architect/ Consultant fees (Budgeted Vs. Actual) Number of rev isions made to the Project Drawings before approv al by the MD/ CEO Value addition to project by the external Consultants Number of rev isions made to the Gov ernment drawings before securing Gov ernment Approv al Variance in issue of drawings to site from scheduled date Av erage time taken from receipt of drawing from consultant to issue of drawings to site Reduction in number of critical observ ations made as compared to that of prev ious site v isit

Unit

Freque ncy

Masters
Proposals Quarterly

No. of Days Days

Proposal Proposal

Key Inputs

No. of v ersions

Proposal

Key Activities
No. of Days Proposal

Amount

Proposal

Key Flowcharts
No. of rev isions Proposal

Architecture

Design Mgmt.

Proposal

Key Outputs

KPM KPM
9 Statutory Drawings Execution Control and Team Coordination Drawings Execution Control and Team Coordination Drawings Execution Control and Team Coordination

No. of Versions

Proposal

MIS

10

Days

Monthly

RR &A & A

11

Days

Monthly

Help
12

No. of critical observ ations

Monthly

77 87

Preliminary and tentative for discussion purposes only

PROJECT DESIGN LIFECYCLE

Management Information System

Home

Statement of critical observations made during site visits


Statement of critical observations made during site visits Date of inspection: Report Date: Project: Site: Building:
Personnel responsible Timelines for completion

Statement of receipt of drawings as against the milestone mentioned in the LOA


Report D ate: Project: Site: Building: Wing No:
Scheduled date of receipt

Masters

Statem ent of receipt of draw ings as against the m ilestone m entioned in the Letter of Appointm ent (LOA)

Process Overview

Key Inputs
Status of drawing Actual date of receipt

Sr. No

Drawing title

Key Objectives

Sr. No

Observation

Impact on the activity/project

Recommended 'Plan of Action'

Key Activities
Note : Status could either be (ADV) or (GFC ) ADV - Advance drawings meant for study purposes GFC - Meant for good for construction purpose.

Process Owners Key Flowcharts Key Formats

Report on compliance with timelines


Report on compliance with timelines Report Date: Project: Site: Building: Wing No:
Es tim ate d du ration (pro pos ed ) 5 1 21 3

Key Outputs

KPM

Sc he duled Ac tivity Preparation of design brief Circulation of design breif by inhouse architect dept. Presentation of concept designs by external architect Selection of architect by management and issue of LOI Appointment and issue of LOI to consultants (structural/municipal/electrical/plumbi ng/landscaping) Finalizing the concept plans/schematic designs Preparation of preliminary project budget Approval of liaison officer of municipal drawings after receipt from municipal architect but before municipal approval Date of issue of working drawings to site

Estima ted da te

Ac tua l d ate

Rea son for de lays (whe re eve r a pplica ble)

MIS MIS

R&A

7 7 7

5 1

Help

78 88
Preliminary and tentative for discussion purposes only