Professional Documents
Culture Documents
mm
DIAMETER
12.00 14.00 15.00 16.00 18.00 20.00 22.00 25.40 26.00 28.57 30.00 31.75 34.93 38.10 41.27 44.45 47.62 50.80 53.97 57.15 60.32 63.50 69.85 73.02 76.20 82.55 88.90 95.25 101.60 107.95 114.30 120.65 127.00 133.35 139.70 146.05 152.40 158.75 161.92 165.10 168.27 171.45 177.80 184.15 190.50 193.67 196.85 203.20 209.55 215.90 219.08 222.25 228.60 234.95 236.85 241.30 244.47 247.65 250.83 254.00 260.35 263.53 266.70 273.05 279.40 285.75 292.10 298.45 301.63 304.80 311.15 317.50 323.85 330.20 339.73 342.90 346.07 349.25 355.60 406.40 431.80 457.20 473.07 498.47 508.00 533.40
1.00 1.20
1.50
1.80
2.00
2.20
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.35
7.00
7.50
8.00
9.52 10.00 11.50 12.00 12.70 14.00 15.87 19.05 22.22 25.40 28.25 31.75 34.92 38.10 41.27 45.00 0.472 0.551 0.591 0.630 0.709 0.787 0.866 1.000 1.024 1 1/8 1.181 1 1/4 1 3/8 1 1/2 1 5/8 1 3/4 1 7/8 2.000 2 1/8 2 1/4 2 3/8 2 1/2 2 3/4 2 7/8 3.000 3 1/4 3 1/2 3 3/4 4.000 4 1/4 4 1/2 4 3/4 5.000 5 1/4 5 1/2 5 3/4 6.000 6 1/4 6 3/8 6 1/2 6 5/8 6 3/4 7.000 7 1/4 7 1/2 7 5/8 7 3/4 8.000 8 1/4 8 1/2 8 5/8 8 3/4 9.000 9 1/4 9 3/8 9 1/2 9 5/8 9 3/4 9 7/8 10.000 10 1/4 10 3/8 10 1/2 10 3/4 11.000 11 1/4 11 1/2 11 3/4 11 7/8 12.000 12 1/4 12 1/2 12 3/4 13.000 13 3/8 13 1/2 13 5/8 13 3/4 14.000 16.000 17.000 18.000 18 5/8 19 5/8 20.000 21.000
CASING
Not treated
L1 MPM SS PM L2 L3 PIL
TUBING
Not treated
SS MPM SRM TUBL
Treated
MPM SS PM HT1 HT2 L1 L2 L3 PIL UT
Treated
SS MPM SRM HTT TUBL
Upsetting Treatment
SS MPM COU HT1 L3
Upsetting Treatment
HT1 SS MPM SRM COU HTT L3 TUBL
Oil & Gas Industry Luis Miguel Heredia lmheredia@tamsa.com.mx (52) 229 989 1968 tel (52) 229 989 1119 fax Engineering and Construction Projects Herbert Atrian hatrian@tenaris.com (52) 55 5282 9996 tel (52) 55 5282 9966 fax Distributors Victor Palencia vpalencia@tamsa.com.mx (52) 55 5282 9943 tel (52) 55 5282 9966 fax
Automotive Industry Ricardo Baez rbaez@tenaris.com (52) 229 989 1911 tel (52) 229 989 1600 ext. 2404 fax Industrial Applications Pablo Pea ppena@tenaris.com (52) 229 989 1956 tel (52) 229 989 1600 ext. 1956 fax Quality Assurance Victor Cabrera vmcabrera@tamsa.com.mx (52) 229 9891188 tel (52) 229 989 1600 ext 1188 fax
LINE PIPE
Not treated
MPM L1 L2 PIL
MECHANICAL PIPE
Not treated
SRM SS MPM PIL PIL
SS
PM
Treated
MPM HT2 L1 L2 PM HT1 PIL UT
Treated
HT1 SS MPM SRM HT1 PIL UT PIL UT
SS
DRILL PIPE
Upsetting Treatment
SS
MPM SRM COU HT1
COUPLINGS
Couplings
MPM SS PM PM HT1 UT UPS
The TenarisTamsa manufacturing center has an integrated cycle. Scrap and sponge iron are used to produce high-quality steel for subsequent processing, resulting in pipes of internationally competitive quality that comply with the most demanding standards. The use of state-of-the-art steel technology, such as vacuum degassing (VD), vibro-molding and electromagnetic steering
in the bar continuous-casting process, guarantees the production of ultra-clean steel. Complete automation of all processes, including heat treatment, and non-destructive inspection guarantee outstanding process control, quality and dimensional precision of all TenarisTamsa products.
Tubos de Acero de Mxico, S.A. has produced this catalogue only and exclusively for general informational purposes, and assumes no responsibility whatsoever for any error or omission in the information contained herein, nor is responsible for any losses or damages, according to articles 2108, 2109, and 2110 of the Federal Civil Code of the United Mexican States or corresponding codes of the states of Mexico, including, but not limited to, any damages or loss of income of any kind that they may caused. Accordingly, the content of this catalogue is presented on an as-is basis, and should not be presumed to constitute a guarantee of any kind.
0.039 0.047 0.059 0.071 0.079 0.087 0.098 0.118 0.138 0.157 1.177 0.197 0.217 0.250 0.276 0.295 0.315 0.375 0.394 0.453 0.472 0.500 0.551 0.625 0.750 0.875 1.000 1.112 1.250 1.375 1.500 1.625 1.772
in
WALL THICKNESS
COLD-DRAWN PIPE COLD-DRAWN PIPE OR HOT-ROLLED HOT-ROLLED PIPE
Note: For other measurements produced in other Tenaris manufacturing centers, please ask for information from the commercial contacts.
DIAMETER
1. STEEL SHOP
STEEL SHOP
Electric Arc Furnace >> Pouring >> Ladle Furnace >> Vacuum Degassing >> Continuous Casting / Pouring Bar Cutting >>
Bars / Ingots
Cooling Bed
2. ROLLING MILLS
CONTINUOUS MULTI-STAND PIPE ROLLING MILL
Bar Cropping into Billets >> Rotary Furnace >> De-Scaling >> Piercing Mill >> Multi-stand Mandrel Pipe Mill >> Extractor >> Sizing Mill >> Isotope Measuring System >> Hot Cutting >> Cooling Bed
PILGER MILL
Rotary Furnace >> Press >> Shell >> Rotary Furnace >> Piercing Mill >> Pilger Mill >> Hot Cutting >> Normalizing Furnace >> Sizing Mill >> Cooling Bed >> Non Destructive Testing >> End Cropping
4. COUPLING PRODUCTION
STRETCH REDUCING MILL
Reheating Furnace >> Stretch Reducing Mill >> Hot Cutting >> Cooling Bed >> Non Destructive Testing >> End Cropping
COUPLINGS
Cutting To Small Pieces >> Small Pieces >> Threading >>
6. FINISHING LINES
LINE 1
Straightening Machine >> Non Destructive Testing >> End Cropping >> Full Length Drift Test >> Threading >> Dimensional Control >> Wet Magnetic Particle Inspection >> Coupling Make-up >> Full Length Drift Test >> Hydrostatic Testing >> Threading >> Dimensional Control >> Wet Magnetic Particle Inspection >>
Weighing, Measuring and Marking Machine >>
Varnishing >>
*Ultrasonic Testing
LINE 2
Straightening Machine >> Non Destructive Testing >> End Cropping >> Hydrostatic Testing >> Full Length Drift Test >> End Cropping >> Threading >> Dimensional Control >> Wet Magnetic Particle Inspection >> Coupling Make-Up >> Full Length Drift Test >> Weighing, Measuring and Marking Machine >> Varnishing >> *Ultrasonic Testing
LINE 3
Threading >> Dimensional Control >> Wet Magnetic Particle Inspection >> Couple Make-Up >> Full Length Drift Test >> Phosphating
TUBING LINE
Hydrostatic Test >> Beveling >> Threading >> Dimensional Control >> Coupling Make-Up >> Full Length Drift Test >> Weighing, Measuring and Marking Machine >> Varnishing
PILGER LINE
Full Length Drift Test >> Threading/ end cropping >> Wet Magnetic Particle Inspection >> Coupling Make-Up >> Full length Drift Test >> Hydrostatic Test >> Weighing, Measuring and Marking Machine >> Varnishing
* Ultrasonic Testing (UT) is an optional inspection process that can be performed depending on the dimensions of the pipe and the customers specifications.