Energy Consumption Feedback System Project

Group 3 Trn Minh Diu 08ES L Nguyn Thng 08ES Nguyn Th Khnh Trinh 08ES Nguyn Ngc Hoi n 08ES

Energy Consumption Feedback System Project

Table of Contents
Executive Summary ................................................................................................................................ 3 Need .................................................................................................................................................... 3 Solution ............................................................................................................................................... 3 Requirements.......................................................................................................................................... 5 Performance........................................................................................................................................ 5 Functionality........................................................................................................................................ 5 Economic ............................................................................................................................................. 5 Energy ................................................................................................................................................. 5 Environmental ..................................................................................................................................... 5 Maintainability .................................................................................................................................... 5 Manufacturability ................................................................................................................................ 5 Operational ......................................................................................................................................... 5 Reliability and Availability .................................................................................................................... 5 Usability .............................................................................................................................................. 5 Technical Section (Statement of Work).................................................................................................... 6 External appearance ................................................................................................................................ 7 Project scheduling ................................................................................................................................... 8 Cost and Payment Section ..................................................................................................................... 10 Management Section ............................................................................................................................. 10

Group 3 Project Management

Page 2

Energy Consumption Feedback System Project


Executive Summary
Need
The population of Da Nang is approximately 800,000 with 300,000 houses. Therefore, collecting indicators of energy consumption every month, especially in many remote areas, is not such an easy task to do. They cannot collect the information of electrical indicators without mistake and this is a time consuming task that they face. In addition, the workers sometime make a mistake at reading electrical indicators. As a result, customers have to pay more money

whenever the indicators exceed certain level every month. This violates the customers
Figure 1 Collect electrical indicator in traditional way

right.

The most basic form of a general (energy consumption indicator) ECI which is the energy meter already installed in most homes exists several drawbacks. For example, users often complain that: We cant be using that muchIts just the two of us in this small house. I just dont know how the bills are so high I think there is something wrong with them.

Solution

Figure 2 current ECI

The idea to avoid those issues is use device to record data automatically. It is not necessary to visit each house to record data. Also, it is possible to make a device with record data very accuracy. Inspiration from above idea, the goal of this project is to design and implement a system to do those tasks and some extra features.

Group 3 Project Management

Page 3

Energy Consumption Feedback System Project


The system contains a main-device at electric company and many sub-devices at every apartment as shown in Figure 3. All the data will be transferred from sub-devices to maindevice whenever having requirement (e.g.: just pressing a collect button) from maindevice. After computing the main-device sends data back to sub-devices. Sub-devices display data on monitor for reviewing of customers.

Figure 2 overview of ECFS

Group 3 Project Management

Page 4

Energy Consumption Feedback System Project


Requirements
Performance

The main-device can communicate to sub-devices and vice-verse. The main-device can connect and send the data to computer. The sub-devices can display the information for viewing. The sub-devices can record the energy consumption.

Functionality

Energy consumption Feedback System (ECFS) will send necessary data from user to electric provider It can display how much the energy users are using, used in nearby month and the price they have to pay

Economic

The total parts and manufacturing costs should not exceed than 1 million VND per unit.

Energy

Average power consumption of the system must be less than 1 Walt

Environmental

ECFS should not be affected by temperature, electromagnetic field, moisture

Maintainability

The system should have a modular design such that failed components can be removed and replaced by a technician in under 30 minutes

Manufacturability

Size: 150mm*100mm*50mm Weight: 300 gram It operates in the temperature range of 0 to 65 Degree Celsius The design will have a reliability in 5 years and will be operational 99% of the time

Operational

Reliability and Availability

Usability

The system will have a reliability of 97% in 5 years

Group 3 Project Management

Page 5

Energy Consumption Feedback System Project


Technical Section (Statement of Work)
The current energy consumption indicator (ECI) just measures and displays an aggregated total of how much energy is being used. Often it is located outside, which makes it impractical for everyday viewing. It is also designed to be read by specialists, not everyday end-users, and hence can be diicult to understand. In order to improve the functionality of the traditional ECI, Energy Consumption Feedback System (ECFS) is designed not only for measuring and displaying the total energy consumption but also for performing 2 extra fancy tasks. The former is sending necessary data from user to electric provider using X-10 communication protocol. The latter is displaying how much the energy users were used in several last months and being used at the time being and the price they have to pay. In addition, all information is displayed on simple LCD display designed for endusers to read easily as shown in Figure 4.

Group 3 Project Management

Page 6

Energy Consumption Feedback System Project


External appearance

<Ngy> <thng> <nm> - <Gi>:<Pht> Ch h: <Nguyn Vn A> M s: <113114115> in tiu th: <999.999> Tin in thng trc: <999.999.999> VN Ln La chn Li Thot Xung
Figure 3 external appearance of ECFS

Ti

Turning to the benefits of this device in more details, not only electric workers, users, contractors, electric company but also the environment might get a lot of advantages. Firstly, for electronic workers, coming to each home to collect the electrical indexes is extremely labor extend. This device saves time and effort. As for users, they can observe how much energy they consume by watching directly the screen. By this way, they can control consuming electricity and then this resort makes a great contribution to save money and energy. Also, when this device is mass-produced, contractors can get great benefits economically at the time being and for a long term because after 5 years this devices will be produced again. Executing this plan saves manpower for the electric company because the owner can assign electric workers to do some other works more efficiently. At last, putting this item into practice promotes energy conscious of residents, saves nonrenewable resources such as coal, crude-oil this has positive impact on reducing green house effects, global warming. Obviously, saving energy makes count on the environment.

Group 3 Project Management

Page 7

Energy Consumption Feedback System Project

Project scheduling
ID Activity Description Deliverables/ Checkpoint Duration People (days) Resources Precessors

1 1.1

Power supply Design circuitry

Complete detailed design Circuit to convert AC220V into DC5V and verify it in simulation.

-Circuit schematic -Simulation verification -Identify parts -Place order -Receive parts Test output voltage

-Thang -Dieu

-Proteus -Altium Designer 1.1

1.2

Purchase component Construct and Test Meter Design circuitry Build and Test

An

1.3 2 2.1

-Trinh -Dieu -Trinh -Dieu -Proteus -Altium Designer

1.2

Complete detailed design Circuit to record electrical indicator and send information to Controller Verify it in simulation

-Circuit schematic -Simulation verification

10

2.2

Purchase components

-Identify parts -Place order -Receive parts -PCB -Solder components -Implement functions -Debug

An

2.1

2.3 Construct and Test 2.3.1 Hardware Build circuitry 2.3.2 Software -Write Code -Simulate it verification

7 8

PCB Manufactor -An

2.2 -HTPIC C -MP Lab 2.2

Group 3 Project Management

Page 8

Energy Consumption Feedback System Project

3 3.1

Controller Design circuitry

Complete detailed design Circuit to receive signal from Meter and Server, control LCD

-Circuit schematic -Simulation verification Identify parts Place order Receive parts

15

-Thang -Dieu -Trinh -An

-Proteus -Altium Designer 3.1

3.2

Purchase Component

3.3 Construct 3.3.1 Hardware 3.3.2 software

Build circuitry -Write Code -Simulate it verification -Communicate with Meter -Communicate with Server -Control LCD

-PCB -Solder components -Implement functions -Debug

7 10

3.4

Test

10

PCB manufactor -Dieu -An -Trinh -Thang

3.2 -HTPIC C -MP Lab 3.2

3.3

4 4.1

LCD Purchase components Test display System Intergration and Test

Identify parts Place order Receive parts -Intergrate components -Stress Test -Launch product into lab Test data verifying functionality and requirement

-An

4.2 5

2 60

-An -Thang -Dieu -An -Trinh

4.1 1 2 3 4

Group 3 Project Management

Page 9

Energy Consumption Feedback System Project


Cost and Payment Section
1. Equipment: - Localized irrigation equipment - Materials and supplies for tanks and installation. 2. General operating expenses: - Costs related to project operation - Reproduction of reports and terminal statement preparation - Direct operating costs related to the implementation of the project. 3. Cost of product: - The cost of product: 1.000.000 VN/item - The cost of installation: Free - The cost of warranty: Free

Management Section
1. Organization of manager 2. Project budget
Input Description Personal services Consultant Project Manger Consultant Technical Support National Project Coordinator Travel Project Manager Consultant Technical Assistance Equipment Expendable equipment Non Expendable Equipment Materials and Supplies General Operating Expenses Support Cost Grand Total
Table 1 Project Budget

Sub (VN) 1.500.000.000 1.000.000.000 500.000.000

Account Main (VN) 3.000.000.000

Account

300.000.000 12.000.000 18.000.000 5.500.000.000 4.000.000.000 1.500.000.000 200.000.000 600.000.000 400.000.000

200.000.000 600.000.000 400.000.000 10.000.000.000

Group 3 Project Management

Page 10