Assessment of Transversely loaded piles in Cohesionless Soil


d
gd
Hu
g
gHu
M yield

0.45 m
20 kN/m

1.5gd =
Kp =

0.675 kN/m
3.000

Hu = 1.5gddKpf
Hu = 1.5gdLdKp
Mmax =
F=
My =
Hu(e+f) =

97.28 kN
1.30
126.5 kN
105.2 KNm

(7.17)
(7.19)

HuL
1.5gdLdKp - Hu
0.5gddLKp - HuL
2My

Hu, kN

Short piles
Intermediate Piles
L <= 1.574
m
1.574 < L <= 3.037
Hu max
Mmax
L Hu max
f
F
M top
Mmax
L EQ.
(kN) (kNm)
(m)
(kN)
(m)
(kN)
(kNm)
(kNm)
(m)
7.19 P&D 7.20 P&D
7.22 P&D 7.17 P&D 7.21 P&D (Myield)
1.000
40.5
27.0
1.050
44.7
31.3
1.100
49.0
35.9
1.150
53.6
41.1
1.200
58.3
46.7
1.250
63.3
52.7
1.300
68.4
59.3
1.350
73.8
66.4
1.400
79.4
74.1
1.450
85.2
82.3
1.574
100.3
105.2
1.750
1.750 101.46
1.583
22.573
105.20
1.86
2.000
2.000 106.60
1.622
55.400
105.20
10.10
2.250
2.250 115.10
1.686
89.932
105.20
24.16
2.501
2.501 126.50
1.767 126.805
105.20
43.84
2.750
2.750 140.35
1.862 165.933
105.20
68.98
2.800
2.800 143.41
1.882 174.109
105.20
74.71
2.850
2.850 146.57
1.902 182.395
105.20
80.68
2.900
2.900 149.81
1.923 190.794
105.20
86.89
2.950
2.950 153.14
1.945 199.306
105.20
93.33
3.000
3.000 156.57
1.966 207.933
105.20
100.02
3.037
3.037 159.19
1.983 214.472
105.20
105.20
3.500
4.000
4.500
5.000
5.500
6.000
6.500
Because the Mult of each
Because the Mult of each pile is 105.2KNm, any length
pile is 105.2KNm, any length over 3.037m will be beyond the capability of intermediate
over 1.574m will be beyond piles.
the capability of short piles.

(7.20)
(7.21)
(7.22)
(7.23)

Long Piles
L > 3.037 m
L
f Hu max Mmax
(m)
(m)
(kN) (kNm)
7.23 P&D (Myield)

1.5gddLKp

3.500
4.000
4.500
5.000
5.500
6.000
6.500

1.983
1.983
1.983
1.983
1.983
1.983
1.983

159.2
159.2
159.2
159.2
159.2
159.2
159.2

180
160
140
120
100
80
60
40
20
0
0.0

1.0

2.0

3.0

4.0

Embedded Length, m

94971393.xls.ms_officeKp=3.0

5.0

6.0

7.0

105.2
105.2
105.2
105.2
105.2
105.2
105.2