Professional Documents
Culture Documents
Search PT scheme PT Calendar About EPTIS Further PT info Contact Disclaimer Sitemap
ASECAL S. L.
EIL / ASECAL / ENVIROMENTAL ASECAL S. L. NOISE EIL / ASECAL / GASES EIL / ASECAL / pH - Fosforo Condutividad in Soils / 01 (AIL / ASECAL / ph - Phosphorus Conductivity in Soils) EIL / ASECAL / pH IN FISH / 02 EIL / ASECAL / RUIDO (EIL / ASECAL / NOISE) EIL / ASECAL / SEED PURITY ASECAL S. L. ASECAL S. L.
Summary
Search PT scheme PT Calendar About EPTIS Further PT info Contact Disclaimer Sitemap
Frequency of performance
Year of first execution 2007 Performed regularly yes (each six months)
Costs
Participation fees Please, quote the fees and currency
Maria Mulki Pineiros Tel.: +09 463 8048 Fax: +593-2-226 1641 Email: mmp@asecal.com
Test items
Producer of test item(s) The test items are prepared by ...Scott Marrin Determination of the assigned value From the results of the participants to the proficiency testing scheme. Uncertainty of the assigned value The related uncertainty is known for each assigned value. The uncertainty is determined according to the procedure described in ... Test item management The test item ... Stability of test items Guaranteed on the basis of stability checks before delivery. Homogeneity of test items Homogeneity testing is carried out before the delivery of similar test items. Distribution of test items By dispatch. Specific requirements on packaging, dispatch and storage No special requirements. Spare test items during PT round Spare test items are available until PT round completion.
Availability of test items after PT round Additional test items are available after PT round completion for use as e.g.quality check samples.
Other information
AEIL/ASECAL/GASES/08 in process