You are on page 1of 6

Query results

Search PT scheme PT Calendar About EPTIS Further PT info Contact Disclaimer Sitemap

We found 7 PT schemes that match your query parameters.

Your query parameters:


Type Keyword(s) ecuador Table of parameters Value no ...keyw... matches

Your query results:


Table of results Name EIL / ASECAL / AZUFRE Y PARAQUAT / 02 (AIL / ASECAL / SULFUR AND PARAQUAT) Provider Updated 24-MAR10 14-APR-10 14-APR-10 24-MAR10 24-MAR10 14-APR-10 15-APR-10

ASECAL S. L.

EIL / ASECAL / ENVIROMENTAL ASECAL S. L. NOISE EIL / ASECAL / GASES EIL / ASECAL / pH - Fosforo Condutividad in Soils / 01 (AIL / ASECAL / ph - Phosphorus Conductivity in Soils) EIL / ASECAL / pH IN FISH / 02 EIL / ASECAL / RUIDO (EIL / ASECAL / NOISE) EIL / ASECAL / SEED PURITY ASECAL S. L. ASECAL S. L.

ASECAL S. L. ASECAL S. L. ASECAL S. L.

Summary

Search PT scheme PT Calendar About EPTIS Further PT info Contact Disclaimer Sitemap

PT scheme "EIL / ASECAL / GASES"

Product groups and testing fields


Product groups Gas Testing fields Emissions from gases and vapours

Test items, tested properties and testing methods


Table of test items, tested properties and testing methods Test item Gases Gases Gases Gases Gases Tested property Nitrogen dioxide Carbon monoxide Nitrogen oxides Sulfur dioxide Nitrous oxide Testing method Electrochemical cells Electrochemical cells Electrochemical cells Electrochemical cells Electrochemical cells

Status and aims of the PT scheme


Applicable standards or documents Subsidiary aims validation of testing methods Independent review Commissioned by

Frequency of performance
Year of first execution 2007 Performed regularly yes (each six months)

Costs
Participation fees Please, quote the fees and currency

This EPTIS database entry


was entered/updated on 14 April 2010

Contact details of the PT provider


Table of contact details Provider Keyword found in: ASECAL S. L. Av. Eloy Alfaro 256 y Seis de Diciembre, Edificio Catamayo PB Local 7 Quito Ecuador, Republic of Tel.: +593-2-226 1641 Fax: +593-2-226 1641 Web: http://www.asecal.com Contact person

Maria Mulki Pineiros Tel.: +09 463 8048 Fax: +593-2-226 1641 Email: mmp@asecal.com

PT scheme "EIL / ASECAL / GASES"


Conditions for participation
Participants are International. Number of participants 15 Open for participation Open participation for any laboratory. Mandatory participation Participation is voluntary for all laboratories.

PT scheme documentation and quality management


Quality management system (QMS) The QMS for the operation of the proficiency testing scheme is based on ISO/IEC 17025 / ...iso 17043 and completely fulfills the requirements of ISO/IEC Guide 43. Standard operating procedures (SOP) / working instructions (WI) A complete description of the operation of the PTS is available. Information material Information material describing the profiency testing scheme, its aim and operation is available for interested parties. Advisory / steering group An advisory / steering group is involved in matters concerning the supervision and operation of the profiency testing scheme. Complaints A documented procedure for the handling of complaints is available. Confidentiality of results Is guaranteed.The results of particular laboratories are communicated to a third party (e.g. recognition authority or accreditation body).This is done with prior agreement of the laboratories.

Test items
Producer of test item(s) The test items are prepared by ...Scott Marrin Determination of the assigned value From the results of the participants to the proficiency testing scheme. Uncertainty of the assigned value The related uncertainty is known for each assigned value. The uncertainty is determined according to the procedure described in ... Test item management The test item ... Stability of test items Guaranteed on the basis of stability checks before delivery. Homogeneity of test items Homogeneity testing is carried out before the delivery of similar test items. Distribution of test items By dispatch. Specific requirements on packaging, dispatch and storage No special requirements. Spare test items during PT round Spare test items are available until PT round completion.

Availability of test items after PT round Additional test items are available after PT round completion for use as e.g.quality check samples.

Analysis of the testing results and assessment of the laboratories


Statistical analysis of the results Performed according to a statistical procedure elaborated by the provider. Handling of outliers The influence of outliers is minimised by: test of cochram and groups Performance assessment Participants are assessed on the basis of their results in each round of the PTS separately. The rating is based on deviation from the assigned values (trueness). Criteria for successful participation are based on limits laid down by law. Numerical rankings Z-scores are used as statistical criteria in the assessment of the laboratories. The performance is questionable if 2<|z|<=3 and satisfactory, if |z|<=2

Information exchange between PT provider and participants


Provider's instructions The provider will give instructions for handling the test items and, where necessary, for performing the test(s). The provider will give instructions on reporting the results. Time frame for participants to report measurement The participants must return their results ...five days of the excercise ( results of o% O2) Time frame for PT provider to report proficiency test The provider publishes a report or information about the outcome of the proficiency testing scheme ... week(s) after receipt of results. Type of information that is provided The information or / and report contains: ..list of participants, descriptions of items, instruccions of the excercise, results of report for the participants, evaluation stadistic, comments general, . Discussion forum No. Technical assistance The provider can assist participants with technical instructions to help improve their performance.

Other information
AEIL/ASECAL/GASES/08 in process

You might also like