Unit Sr. No. DESCRIPTION OF ITEMS Rate for 2010-2011 (in Rs.) Completed Labour 2,924.00

17

25

Providing and laying in situ, cement concrete M-15 /1:2:4 Cu.M. of trap/granite/quartzite/gneiss metal for foundation and bedding including bailing-out water manually, formwork, compacting, covering newly laid concrete by gunny bag, plastic or tarpaulin, curing etc. complete. (Wooden planks/ shuttering will not be allowed) Spec.No. : Bd.E.1 Page No. 287 /IS 456:2000 Providing and laying in situ cement concrete M-10 /1:3:6 of trap/granite/quartzite/gneiss metal for foundation and bedding including bailing-out water manually formwork, compacting, covering newly laid concrete by gunny bag, plastic or tarpaulin, curing etc. complete. (Wooden planks/ shuttering will not be allowed) Spec.No. : Bd.E.1 Page No. 287 /IS 456:2000 Providing and laying is situ, cement concrete in 1:4:8 of trap/granite/quartzite/gneiss metal for foundation and bedding including bailing-out water manually, formwork, compacting, covering newly laid concrete by gunny bag, plastic or tarpaulin, curing etc. complete. (Wooden planks/ shuttering will not be allowed) Spec.No. : Bd.E.1 Page No. 287 Providing and laying in situ cement concrete in 1:5:10 of trap/granite/quartzite/gneiss metal for foundation and bedding including bailing-out water manually, formwork, compacting, covering newly laid concrete by gunny bag, plastic or tarpaulin, curing etc. complete. (Wooden planks/ shuttering will not be allowed) Spec.No. : Bd.E.1 Page No. 287 Providing and casting in situ cement concrete M15 /1:2:4 of trap/ granite/ quartzite/ gneiss metal for steps including centering, form work, compacting, covering newly laid concrete by gunny bag, plastic or tarpaulin, roughening them if special finish is to be provided and curing and finishing if required etc. complete. (The cement mortar 1:3 plaster is considered for rendering uneven and honey- combed surface only. Wooden planks/shuttering will not be allowed) Spec.No. : Bd.E.2 Page No. 288 /IS 456:2000 Cu.M.

287.00

26

2,181.00

327.00

27

Cu.M.

1,920.00

334.00

28

Cu.M.

1,685.00

327.00

29

Cu.M.

2,976.00

341.00

18

Bd E : PLAIN CEMENT CONCRETE


Unit Rate for 2010-2011 (in Rs.) Completed Labour 3,643.00 341.00

Sr. No.

DESCRIPTION OF ITEMS

30

Providing and casting in situ cement concrete M-20 of trap/ granite/ quartzite/ gneiss metal for steps including centering, form work, compacting, covering newly laid concrete by gunny bag, plastic or tarpaulin, roughening them if special finish is to be provided and curing and finishing if required etc. complete. (The cement mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Wooden planks/shuttering will not be allowed) Spec.No. : Bd.E.2 Page No. 288 /IS 456:2000 Providing and casting in situ cement concrete M-15/1:2:4 of trap/ granite/ quartzite/ gneiss metal, moulded or chamfered as per drawing or as directed including centering, form work, compacting, covering newly laid concrete by gunny bag, plastic or tarpaulin, roughening them if special finish is to be provided and curing and finishing if required etc. complete. (The cement mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Wooden planks/shuttering will not be allowed) (i) for coping to plinth or parapet

Cu.M.

31

Cu.M. Cu.M. Cu.M.

3,290.00 3,133.00 3,400.00

327.00 334.00 375.00

32 33

(ii) for bed blocks (iii) for plain or moulded sills, cornice, jambs, architraves Spec.No. : Bd.E.3 Page No. 288 /IS 456:2000 Providing and casting in situ cement concrete M-20 of trap/ granite/ quartzite/ gneiss metal, moulded or chamfered as per drawing or as directed including centering, form work, compacting, covering newly laid concrete by gunny bag, plastic or tarpaulin, roughening them if special finish is to be provided and curing and finishing if required etc. complete. (The cement mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Wooden planks/ shuttering will not be allowed)

34

Bd E : PLAIN CEMENT CONCRETE


Unit Sr. No. DESCRIPTION OF ITEMS Rate for 2010-2011 (in Rs.) Completed Labour 3,629.00 4,021.00

19

i) for bed blocks, foundation blocks 35 ii) for plain or moulded sills, cornice, jambs, architraves Spec.No. : Bd.E.4 Page No. 289 /IS 456:2000

Cu.M. Cu.M.

314.00 355.00

36

Providing and laying in situ cement concrete M-15/1:2:4 Cu.M. grade by using cement 75% and fly Ash 25% of trap / granite / quartzite / gneiss metal for foundation and bedding including bailing out water manually, formwork, compacting, covering newly laid concrete by gunny bag, plastic or tarpulin, curing etc. complete. (Wooden planks/ shuttering will not be allowed) Providing and laying in situ cement concrete M-10/1:3:6 Cu.M. grade by using cement 75% and fly Ash 25% of trap / granite / quartzite / gneiss metal for foundation and bedding including bailing out water manually, formwork, compacting, covering newly laid concrete by gunny bag, plastic or tarpulin, curing etc. complete. (Wooden planks/ shuttering will not be allowed) Providing and laying in situ cement concrete 1:4:8 Cu.M. grade by using cement 75% and fly Ash 25% of trap / granite / quartzite / gneiss metal for foundation and bedding including bailing out water manually, formwork, compacting, covering newly laid concrete by gunny bag, plastic or tarpulin, curing etc. complete. (Wooden planks/ shuttering will not be allowed) Providing and laying in situ cement concrete 1:5:10 Cu.M. grade by using cement 75% and fly Ash 25% of trap / granite / quartzite / gneiss metal for foundation and bedding including bailing out water manually, formwork, compacting, covering newly laid concrete by gunny bag, plastic or tarpulin, curing etc. complete. (Wooden planks/ shuttering will not be allowed)

2,742.00

287.00

37

2,050.00

327.00

38

1,828.00

334.00

39

1,607.00

327.00