WATER SYSTEM & EQUIPMENT 1.00.00 1.01.00 CIRCULATING WATER SYSTEM Five (5) numbers of Vertical, wet pit, turbine type (VT), Circulating water pumps (Capacity 36000M3/hr, Head 29MWC (min)), associated motor drives complete with all accessories such as base plate of each pump set, sole plate, foundation bolts and nuts, anchor, sleeves, stuffing boxes (if applicable), thrust pads etc as required OR Five (5) numbers of Vertical, dry pit configuration, Concrete Volute (CV) type Circulating water pumps(Capacity 36000M3/hr, Head 29MWC (min)), associated motor drives complete with all accessories such as base plates, sole plate, foundation bolts and nuts, anchor, sleeves, stuffing boxes (if applicable), thrust pads etc as required. OR Five (5) numbers of Vertical, dry pit configuration, Metallic Volute (MV) type Circulating water pumps(Capacity 36000M3/hr, Head 29MWC (min)), associated motor drives complete with all accessories such as base plates, sole plate, foundation bolts and nuts, anchor, sleeves, stuffing boxes (if applicable), thrust pads etc as required. Five (5) sets of complete form work along with all inserts, embedment as required for volute casting. Detail engineering, stage design and preparation, submission of CV pump substructure drawings upto & including operating floor as well as formwork drawings, etc. for Employer review and approvals are also included in the scope of the contractor. 1.02.00 Complete lubrication for line shaft bearing and thrust bearings and cooling system pumps(if applicable), piping, specialties and accessories, fittings, valves etc for the Circulating Water pumps. Sealing system (applicable for CV & MV type pumps configuration only) consisting of 2x100% capacity for each CV type CW pump with its drives, associated piping, valves, fittings, filters, specialties, accessories & instrumentation and control. Four (4) numbers of drainage (applicable for CV & MV type pumps configuration only) pumps (two numbers for each pit)(discharge min 50 Cu.M/hr& head as required) with its drives, associated piping, valves, fittings, filters, specialties, accessories & instrumentation and control. The discharge from the drainage pumps (if applicable) of the CW pump house shall be terminated by the Bidder up to the nearest storm water drain

1.03.00

1.04.00

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 1 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES 1.05.00 One (1) number of rubber expansion joint to suit CW pump discharge pipe/divergent cone with counter flanges, accessories including control rod assemblies, bolts, nuts, washers, gaskets for each CW pump. One (1) number of 2600mm NB size, Pump discharge Butterfly valve with all accessories and Electro-hydraulically operated actuators for each CW pump. Two (2) numbers of 2600mm NB electric motor actuated Butterfly valves with all accessories for interconnection of ducts. Required distance pieces (if required) between the pump discharge & expansion joints. Required Butterfly Valves with all accessories in the re-circulation pipe line with actuators as indicated in the tender drawing titled Scheme of Circulating Water System and in Technical Specification. One (1) number 60 Tons (minimum) capacity electrically operated overhead travelling type crane including rails & rail fixing arrangement , stoppers and buffers etc. for CW pump house for handling of pumps, drives, Discharge Valves, rubber expansion joint etc during erection, operation and maintenance. Three (3) numbers of Vertical, wet pit type (VT), Station Auxiliary cooling water pumps, associated motor drives complete with all accessories such as base plate of each pump set, sole plate, foundation bolts and nuts, anchor, sleeves, stuffing boxes (if applicable), thrust pads etc as required along with complete lubrication for line shaft bearing and thrust bearings and cooling system including pumps (if applicable), piping, specialties and accessories, fittings, valves etc for the station auxiliary cooling Water pumps. One (1) number of rubber expansion joint, one (1) number non-return valve, and one (1) number of electric motor actuated Butterfly valve at the discharge of each Station Auxiliary Cooling Water Pump. Provision of Butterfly valve with all accessories and actuators in the re-circulation pipe of station auxiliary cooling water pump. One (1) number 5 Tons (minimum) capacity electrically operated (pendent controlled) monorail hoist for Station auxiliary cooling water pump house for handling of pumps & drives etc during erection, operation and maintenance. Required numbers of (Minimum twenty (20) nos) of Automatic air release valves (ARVs) of 200 mm NB (minimum) size along with its isolation valves for CW system. However, the actual number shall governed by the transient study to be carried out under the scope of this package. However , in no case shall the ARVs be less than twenty (20) No. as stated above.

1.06.00

1.07.00

1.08.00

1.09.00

1.10.00

1.11.00

1.12.00

1.13.00

1.14.00

1.15.00

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 2 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES 2.00.00 MAKE UP WATER SYSTEM a) Three (3) numbers of Vertical, wet pit, turbine type(VT) make up water pumps (PT) & Two (2) numbers of Vertical, wet pit, turbine type(VT) make up water pumps(Ash) , discharge butterfly valve, rubber expansion joint of required size with all accessories and Electrical Actuators for each pump, associated with motor drives complete with all accessories such as base plate of each pump set, sole plate, foundation bolts and nuts, anchors, sleeves, stuffing box(if applicable), thrust pads etc as required. Complete make up water pipelines, Valves & fittings from makeup water pumps (PT), Make up water pump (Ash), re circulation pipe line, up to respective areas (i.e. PT plant and Ash handling plant area).(as shown in relevant tender drawing). One number electric motor actuated Butterfly valve in each of the recirculation line for Make water system pumps for PT Plant& ash plant One (1) number 10 Tons (minimum) capacity electrically operated overhead travelling type crane including rails & rail fixing arrangement , stoppers and buffers etc. for Make up water pump house for handling of pumps, drives, Discharge Valves, rubber expansion joint etc during erection, operation and maintenance. Complete lubrication water system consisting of two numbers of horizontal centrifugal type lubricating water pumps & its drives, its accessories, piping from Make water headers up to the overhead tank, from tank upto the lubricating water pumps, from lubricating water pumps to each of the Make water pumps, associated valves, strainer in the discharge of lub water pumps, and additional equipment to make the system complete.

b)

c) d)

e)

3.00.00 3.01.00

GENERAL/ OTHERS REQUIREMENTS Carrying out detailed hydraulic transient analysis for complete CW system water pipes under various operating conditions by reputed consultants/ institutes and providing required air release valves and other devices specified elsewhere. Hydraulic model studies for CW pump sumps and forebay, and part of cold water (approach) channel from recognised / reputed institutes like IITs, IISc, Bangalore and CWPRS, Pune in India or from any reputed foreign institutes. Any additional equipment required to make the system complete and all miscellaneous items that are necessary to ensure safe and reliable operation of the plant during start-up, continuous running, shut-down, and emergency conditions, even if these are not explicitly mentioned in this specification.

3.02.00

3.03.00

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 3 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES


4.00.00 INDUCED DRAFT COOLING TOWER

4.00.01

Four (4) nos. Induced draft Main CW cooling towers and one (1) number of Induced draft Station Auxiliary Cooling Tower comprising of: i) ii) Complete packing / fill material and drift eliminators for all cooling towers. Complete Hot water Distribution System consisting of:a) Two (2) numbers manually operated butterfly valves of size 1800 NB mm for each of the Main CW Cooling towers for isolating the hot water riser/header to the cooling tower along-with valve supports. Mild Steel pipes to carry hot water to cooling tower including its supporting arrangement. Manually operated butterfly valve at inlet to each cell of cooling tower Hot water distribution systems along with water spray nozzles for each cooling tower.

b)

c) d)

iii) iv)

Design and fabrication of anchors, hangers and supports wherever required. Drain sump and sludge disposal system for cooling towers, including sludge sump, associated pipe work, sludge pumps 01 nos. of 150 cum/hr capacity for each sludge sump, valves, accessories and piping up to nearest plant drain. Inlet air louvers (if applicable) for each cooling tower. Complete air moving equipment consisting of fans, reduction gear unit, transmission equipment, lubricating system and electrical motors etc. Mechanical and electrical equipment Handling system and maintenance facilities for drive system gear reducers, fans, motor, stop logs (at the Cold Water Channel) for each cooling tower. Cross over facility, as required, over hot water pipes as per layout requirement. Provision of six numbers of Isolation (Gate valve) Valves (in the stub connections) for each unit at the locations where flow measurement is to be carried out by means of pitot tubes. Any additional system/ equipment required to make the system complete.

v) vi)

vii)

viii)

ix)

x)

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 4 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES xi) Carrying out performance test of one of the Cooling Towers through CTI (Cooling Technology Institute-USA) approved/listed testing agency. Carrying out performance test of balance cooling towers by the contractor.

5.00.00 5.01.00 5.01.01

WATER PRE-TREATMENT PLANT GENERAL Broad scope of work described below( For WTP & LET system) shall be read in conjunction with the subsections of Part-B & Data Sheets enclosed in relevant chapter of Part-B of this Technical Specification and Tender drawings. The analysis of raw water to be adopted for design of PT plant is enclosed in Project information. PT- CW System Raw water pipe upto the aerator through a set of Control Valve & Isolation Valves for Control Valves. One (1) number Aerator and one (1) number stilling chamber of RCC Construction of capacity as mentioned in the data sheets along with isolation gates at the inlet to the inlet channels for PT-CW system clarifier. Three (3) numbers of inlet channels with flow measuring element in each channel (parshall flume) of RCC Construction. One (1) number bypass channel of RCC Construction to by-pass clarifier(s) with required isolation gate(s). Three (3) numbers of reactor type clarifiers of RCC Construction each of capacity as mentioned in the data sheets including associated equipment and drives for PT-CW system. One (1) number Clarified Water Distribution Chamber of RCC Construction of capacity /sizes as mentioned in the data sheets with required isolation Valves. Outlet channels of RCC Construction from Clarifiers upto the Clarified Water Distribution Chamber. HVAC system makeup water pumps and pipeline & Isolation valve(s), suitable pump house (shed with side open) of minimum 5 M height from the operating floor along with maintenance bay and one number electrically operated monorail hoist of required capacity for handling pumps & drives near to clarified water distribution chamber etc. to make system complete. CW makeup water pumps and pipeline & Isolation valve(s) etc. up to CW channel (shown in tender drawing)

5.02.00

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 5 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES Interconnecting pipe & Valve between the clarified water outlet channel and outlet channel of PT-DM or RODM (Reverse Osmosis Demineralization) System.

5.02.01

PT-Potable Water System Outlet channel of RCC Construction from Clarifier upto the Gravity filters of Potable Water System. Two(2) numbers of Gravity Filters (Potable Water System) of RCC Construction each of capacity as mentioned in the data sheets with all accessories as described elsewhere, interconnecting piping, valves etc. One(1) number filtered water reservoir (in twin sections located below the filters) of RCC Construction of each of capacity as mentioned in the data sheets, filtered water sump and common filtered water pump house for PT Potable water & PT-DM or RODM (Reverse Osmosis Demineralization) systems. Two(2) numbers of Potable water pumps , its drives, associated suction pipes from filtered water sump, isolation valves, pump(s) discharge pipes, non-return valves & isolation valves at the discharge, discharge header etc. Two(2) numbers each for PT-DM or RODM and PT-Potable system air blowers of oil free type of capacity as mentioned in the data sheets, its drives and associated accessories, air piping from blowers to each section of the filter for air scouring of filters during backwash operation. One (1) number electrically operated monorail hoist(s) (common for both PTDM or RODM & PT-Potable System) of required capacity for handling all the pumps, blowers, drives etc. Required interconnecting air piping, valves etc from the blowers to each Gravity filters for air scouring of filters during backwash operation. Pipe & Valves as shown in relevant tender drawings to facilitate future expansion.

5.02.02

PT- DM or RODM (Reverse Osmosis Demineralization) System Raw water pipe upto the aerator through a set of Control Valve & Isolation Valves for Control Valves. One (1) number Aerator and one (1) number stilling chamber of RCC Construction of capacity as mentioned in the data sheets along with isolating gates at the inlet to the inlet channels for PT- DM or RODM system clarifier. One (1) number inlet channel of RCC Construction with flow measuring element in each channel (parshall flume).

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 6 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES One number bypass channel of RCC Construction to by-pass clarifier(s) with required isolation gate(s). One (1) number reactor type clarifier of RCC Construction of capacity as mentioned in the data sheets including associated equipment and drives for PT-DM or RODM system. Outlet channel of RCC Construction from Clarifier upto the Gravity filters of DM or RODM System. Two numbers of Gravity Filters (DM or RODM System) of RCC Construction each of capacity as mentioned in the data sheets with all accessories as described elsewhere, interconnecting piping, valves etc One number filtered water reservoir (in twin sections located below the filters) of RCC Construction of each of capacity as mentioned in the data sheets, filtered water sump and filtered water pump house. Required interconnecting air piping, valves etc from the blowers to each Gravity filters for air scouring of filters during backwash operation. Pipe & Valves as shown in relevant tender drawings to facilitate future expansion. CHEMICAL HOUSE EQUIPMENTS a) Electrically operated monorail hoists for transporting the chemicals from the ground floor to the respective preparation tanks and required weighing scales. Lime preparation & dosing system consisting of required number of RCC lime slaking tanks, RCC lime solution preparation tanks, agitators, lime slurry transfer pumps, lime solution dosing pumps complete with all necessary piping, fittings, feed piping, water supply piping, overflow and drain piping, sampling connections etc as mentioned in data sheets enclosed in relevant sub section of Part-B. Alum Solution preparation & dosing system consisting of required number of RCC Alum solution preparation tanks, agitators, alum solution dosing pumps complete with all necessary piping, fittings, feed piping, water supply piping, overflow and drain piping, sampling connections etc as mentioned data sheets enclosed in relevant sub section of Part-B. One number RCC overhead filtered water storage tank of required capacity as specified in data sheet, on top of chemical house with water supply line from the discharge of filtered water pumps, associated valves, piping, fittings etc.

5.02.03

b)

c)

d)

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 7 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES 5.02.04 CHLORINATION PLANT CW Chlorination a) Required numbers of Chlorine tonners, Evaporators, Chlorinators, Ejectors, Chlorine water booster pumps & its drives, required piping, valves etc from pumps upto fore bay and pump sumps of CW pump house, diffusers for dosing chlorine, associated valves etc. The capacity of each of the equipment/items shall be as mentioned in the data sheets. Required Safety and supervisory Equipments such as Gas masks, Chlorine leak detectors and emergency kits. Required numbers of electrically operated monorail hoists for handling Chlorine ton-containers in the chlorination plant building. Chlorine Leak absorption system(for CW & PT Systems) consisting of required number of hoods over the tonne containers, ducting arrangement, absorption tank, alkali recirculation pumps, blowers, piping, valves, chlorine leak detectors, etc as detailed out in Data sheets and Part-B of Technical Specification.

b)

c)

d)

5.02.05

PT Chlorination Required numbers of Chlorine tonners, chlorinators, ejectors, Chlorine water booster pumps & its drives, required piping, valves etc from pumps upto the aerators of each clarifier, diffusers for dosing chlorine, associated valves, Safety and supervisory Equipments such as Gas masks, Chlorine leak detectors and emergency kits etc. Capacity of each of the equipment/items shall be as mentioned in the data sheets.

5.03.00 5.03.01

LIQUID EFFLUENT TREATMENT SYSTEM PT- Plant Clarifier Sludge Disposal System a) One number RCC sludge pit (in 2 sections) to collect sludge from all the clarifiers of PT-CW system, PT-DM system & Tube settlers/Lamella clarifiers of required capacity as specified in data sheet, sludge piping from clarifier upto the pit, associated valves etc. Three (3) numbers sludge disposal pumps of required capacity as specified in data sheet, its drives, associated valves, piping etc from the discharge header of above pumps to make system complete.. Two numbers of air blowers of oil free type of capacity as mentioned in the data sheets, its drives and associated accessories, air piping from blowers to each section of the sludge pit for air scouring of sludge.

b)

c)

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 8 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES d) One number electrically operated monorail hoists of required capacity for handling pumps & Drives.

5.03.02

Filter Back Wash Waste Disposal System a) One number RCC Filter backwash waste collection pit of required capacity as specified in data sheet to collect the backwash water from both PT-DM & PT-Potable gravity filters, back wash waste water piping from filters upto the pit, associated valves etc. Three (3) numbers backwash water pumps, its drives, associated piping and valves from the above pumps to stilling chamber of PT-DM and PT-CW system. One number electrically operated monorail hoists of required capacity for handling pumps & Drives.

b)

c)

5.03.03

Waste Service Water Treatment System a) One (1) number RCC waste service water (in 2 sections) sump for collection of waste service water at the location shown in the Tender drawing to tap waste water from employers main plant drains and required connection from the plant drain upto the sump. Facility to collect free oil from these sumps to a MS oil drum of 200 litre capacity with the help of Drum type (2 Nos.) oil skimmers. Three (3) numbers Waste service water transfer pumps of capacity as mentioned in Data sheets as required to transfer the waste service water from the sump to the tube settler / lamella clarifiers, its drives associated piping & valves to make system complete.. Two (2) numbers tube settlers/ lamella clarifiers of RCC Construction each of capacity as mentioned in Data sheets alongwith RCC flash mixers of 1 one minute retention time and RCC flocculation chambers of 10 minutes capacity. Both the flash mixers and flocculation chambers shall be provided with agitators (SS-316 construction). Sludge Pipeline with associated Valves from the tube settlers/ lamella clarifiers upto the sludge pit of Clarifiers by gravity flow. Required electrically operated monorail hoist(s) of required capacity for handling pumps & Drives. Inlet connection channel from the drain in Coal Stockyard area upto the Coal Slurry Settling (CSSP) Pond to transfer waste water laden with coal dust to the CSSP.
SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT PAGE 9 OF 14

b)

c)

d)

e)

f) 5.03.04

Coal Handling Plant Run-Off Water Treatment System a)

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES b) c) d) Three (3) numbers of Coal Slurry Settling (CSSP) Ponds of RCC Construction each of size /capacity as mentioned in Data sheets/ tender drawings. Two (2) numbers Coagulant-aid tanks of Mild steel rubber lined construction of capacity as mentioned in Data Sheet. One (1) number decanted water sump of RCC Construction (2 sections) to receive decanted water from above settling ponds of size /capacity as mentioned in Data sheets and discharge channel from the CSSP to decanted water sump as well as to the plant drain as per tender drawings. Two (2) numbers Coal Decanted Water Pumps of capacity as mentioned in data sheets, its drives, associated piping, Valves etc as indicated in the tender drawing. Decanted water channel of RCC Construction from CSSP to the drain with gates etc as indicated in relevant drawings. Two (2) numbers portable submersible type pumps for draining the water from the CSSP, with hose pipes etc. Electrically operated monorail hoist(s) of required capacity for handling pumps & Drives.

e)

f) g) h) 5.03.05

Central Monitoring Basin One number (twin section) Central Monitoring (CMB) Basin of RCC Construction of capacity as mentioned in Data sheets to receive treated water from tube settlers/ lamella clarifiers and excess CW system blow down water. Three (3) numbers of Treated Effluent Disposal pumps of capacity as mentioned in Data Sheets, its drives, associated Valves and piping to dispose the treated water to required location. Electrically operated monorail hoist(s) of required capacity for handling pumps & Drives.

5.04.00

Service Water Storage and Pumping System a) Two (2) numbers of Service water pumps of capacity as mentioned in the data sheets, (The pumps shall be located in the service water pump house near the Service Water tank to be built by the bidder) its drives, associated Valves and Piping upto different area of plant as required or mentioned elsewhere in this specification Two (2) numbers of Air pre heater (APH) wash water pumps (to be located in the service water pump house) of capacity as mentioned in the data sheets, its drives, associated Valves and Piping upto the required location..

b)

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 10 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES c) 5.05.00 6.00.00 One number electrically operated monorail hoist of 2 Ton capacity (minimum) for handling these pumps.

Required number of Drainage pumps of capacity as mentioned in data sheets along with all accessories. DEMINERALISATION (DM) / RODM (REVERSE OSMOSI DEMINERALISATION) PLANT GENERAL Broad scope of work described below ( for DM Plant & Chemical treatment System) shall be read in conjunction with the subsections of Part-B & Data Sheets enclosed in relevant chapter of Part-B of this Technical Specification and Tender drawings. The analysis of Clarified water to be adopted for design of Demineralisation Plant is enclosed in Project information. Four (3) numbers Filtered Water transfer/supply Pumps, its drives & associated piping from clarified water pumps to DM Plant. a) b) Three (3) numbers of Activated carbon filters with all accessories. Three (3) numbers of Weak Acid Cation exchanger units with all accessories. Three (3) numbers of accessories Strong Acid Cation exchanger units with all

6.01.00 6.01.01

6.02.01

c)

d)

Three (3) numbers of Degasser system comprising of Degasser Tower, storage tank, Air Blowers [two (2) numbers per degasser tower] & its drives and Four (4) numbers of Degassed water transfer pumps & its drives with all accessories. Three (3) numbers of Weak base Anion exchanger units with all accessories. Three (3) numbers of Strong base Anion exchanger units with all accessories. Three (3) numbers of Mixed bed unit along with Two (2) blowers with its drives and all accessories. numbers air

e)

f)

g)

h)

Complete Hydrochloric acid storage handling, measuring tanks and dosage system and complete Alkali storage handling, measuring tanks and dosage system.

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 11 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES i) Two (2) numbers of safety shower units and adequate number of. Eyefountains to protect against any chemical hazard. Two (2) numbers of DM water storage tanks with all accessories. Two (2) numbers DM water pumps for regeneration system and its drives. Neutralizing waste disposal system - All DM plant Effluent drains (except backwash water from AC filters, rinse waste water and fast/final rinse waste water of Ion-Exchangers units) shall be connected to the Neutralization Pits. Neutralized waste shall be pumped upto the Ash water Sump and CMB as indicated in the tender drawing. Backwash water from AC filters, rinse waste water and fast/final rinse waste water of Ion-Exchangers units shall be connected to the backwash sump and same shall be terminated by Contractor into the stilling chamber of (PT-CW) clarifier of Water Pretreatment Plant. First fill of filter media for AC filters First fill of resins for all Ion Exchange units. 25 NB DM water line from Mixed Bed headers to all the laboratory (exact location shall be identified later) rooms in the Chemical laboratory located near D.M. Plant building System which shall be terminated with an isolation valve. Interconnecting piping, valves, fittings and accessories including Pre Cast RCC pipes at road crossing as required. Supply and application of final painting to all the equipments, piping & accessories. All approach ladders and operation/maintenance platforms, handrails as required for various equipments, valves and instruments. Construction of support trestles, bridges, brackets, bolts, nuts, clamps etc. for the associated piping are under bidders scope. Two (2) numbers platforms (1.5M x 1.5M) with adjustable height (maximum 2.0M) with suitable epoxy painted to be provided for internal inspection of all the, AC Filters and Ion Exchanger vessels. Brine Solution Preparation Tank and Brine transfer pumps, piping and valves. Provision of hot water supply to the ACF units from the hot water tank shall be made for rejuvenation of activated carbon and the DM regeneration
SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT PAGE 12 OF 14

j) k) l)

m) n) o)

p)

q)

r)

s)

t)

u)

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES pumps to be sized considering above requirement in addition to required for regeneration. (OR) 6.02.02 Complete Reverse Osmosis with Mixed bed combination Plant (skid mounted) including complete Ultrafiltration system/skid, UF permeate-cum-back wash water storage tank & UF recirculation fast flush tank, RO feed pumps, micron cartridge filters, RO High pressure pumps, completely skid mounted RO block, RO chemical dosing system, RO Chemical cleaning skid, Mixed bed exchangers along with regeneration system including acid/alkali unloading, storage & dosing system, waste neutralising and disposal system, all approach ladders and operation/ maintenance platforms, handrails as required for various equipments, valves and instruments and in all the areas as required in DM Plant building and complete civil, electrical and control & instrumentation works for the complete plant as per system requirements and as specified in data sheets.

Bidder shall choose either cation, anion, mixed bed type resin system or reverse osmosis with mixed bed resin type system for

Demineralistion plant. The chemical dosing system, Neutralizing waste disposal system etc shall be provided by bidder mentioned above or equivalent to above for RODM system to make the system complete.
6.02.03 a) Three (3) numbers DM water makeup pumps and drives & associated Valves and piping up to the required location etc. b) Two (2) numbers Boiler Fill pumps and drives & associated Valves and piping upto the required point/ location. 6.03.01 CW TREATMENT SYSTEM 1. 2. 3. 4. Complete sulphuric acid handling, storage and dosage system. Scale/corrosion inhibitor measuring tanks & dosing System. Dispersant chemical measuring tanks & dosing system. Two (2) numbers of safety shower units and adequate number of eye fountains to protect against any chemical hazard.

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 13 OF 14

CLAUSE NO.

SCOPE OF SUPPLY & SERVICES 5. All interconnecting piping, valves, fittings including dosing piping, drain piping from acid storage dyke to nearby drain through neutralization pit provided in the dyke area, piping for monitoring equipments such as pH monitor/deposit monitor/corrosion rack etc., flushing lines from nearest available water source, valves, fittings and accessories .

7.00.00 7.01.00

SIDE STREAM FILTRATION SYSTEM Broad scope of work include all equipments and accessories. Electrical,, C&I, Civil, construction works for the side stream filtration system (with 2% recirculation of CW flow) is detailed out in Part B of this specification. CHEMICAL LAB EQUIPMENT The laboratory equipments to be supplied & installed by the bidder are listed elsewhere in this Tender Document .

8.00.00 8.01.00

SINGARENI THERMAL POWER PROJECT (2X600 MW) BALANCE OF PLANT(BOP) PACKAGE

BID DOC. NO.: CWCM-9596-COM-001

TECHNICAL SPECIFICATION SECTION - VI PART-A

SUB-SECTION-IIA-03 WATER SYSTEM & EQUIPMENT

PAGE 14 OF 14

You might also like