Module Circuit Design
Different strings Iso fault measurements
Powador Inverters modules STP 210 18 Ud It is highly important to measure one module only against frame , either isolated with wood or similar isolator
28,5 V 2,55 A 199 Mohm during dry conditions 820W/m 29,8 V 6,61 A > 199 MOhm @ 500V 29,7 V 6,55 A >199MOhm @ 1000V Module temperature is 51 degrees @ 10:00 am After pouring the water over surface 1000V 500V measured + and combined/ against complete roof/ grounding structure ( not recommended) 26,9 MOhm 37,2 MOhm 30 MOhm 42 MOhm 36,3 MOhm (all values measured are fine ) Powador Inverters modules STP 210 18 Ud It is highly important to measure one module only against frame , either isolated with wood or similar isolator
Measuring + Pole and Pole seperate against frame or/ and structure
01
Earthing structure several times earthed towards the roof structure , therefore If the wiring to bond with the earth near inverter is not big enough ,after Kirchhoff s law, current will flow according the lowest resistance.
Measured 25,9 MOhm with normal Isolationtester Megger ~ok If still mounted on the structure
10
Impedance
UL = 25V 230V +50A*0,71Ohm~ 0.71 Ohm (RS) 265,5V AC 338 Ik UL = 25V 230V + 50A*1,04Ohm~ 1.04 Ohm (RS) 282 V AC 230 Ik UL = 25V 0.18 Ohm (RS) 1315 Ik -with a existing value of 1,02 OhmRn~ max 10,791 kW 3 phase can be realised 230V + 50A*0,18Ohm~ 239 V AC
Overcoming earthing (Ri)and Impedance (Rn)problemsThe current will flow in any direction, if earth wire (back) is to small
01
01
01
Lightning rods can be used to bond , without corrosion- like sample here
14
Value to high 13, 79 Ohm measured, flow will divert into the Pillars
15
Value to high 4,8 Ohm measured, flow will divert into the Pillars
16
Value here 0,08 Ohm measured, flow will divert into the Pillars -The other earthing point not good
17
1.
Row 2,4A ~ 7A
Bypass Diodes
18
Conclusion
-During dry period all measurements done showed > 199 Ohm -When we poured water over the surface and tested with PV Benning values stayed longer on safe side because of it s triggering capacity and adjustment regards PV Megger testing device not purely for PV only Earth loop and Neutral Impedance has to be checked on site - Earth Rod has to be done via Tri Pod or 45 degrees angled ( wrong/false readings from Inverter ) During operation the module somehow accumulated static loads. With a massive grounding ( way below 1 Ohm) we can discharge quickly any static or impedance driven faulty readingsand faulty Phantom Iso fault will disappear. The inverter if configured upfront Suisse Mode by that a emf friendly version
19
Conclusion I
Equal to the new israely local requirements ( since 2012 ) Earth wiring should be done via a aluminium wire only, - The earthing structure won t corrode over time otherwise we will face the same problem every year once the earth will loose it s conductivity over time. - 10sqmm or 16sqmm are sometimes not enough it should be strong enough to bring any problems ( leakage currents) back to source without stray currents involved direct or indirect. - The surface of the installed m should not exceed 60. Afterwards the structure should be broken to let not to many modules ran parallel over the same area