Accessibility Algorithm
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
CS RRC Setup FL: MP Load, Block TNCs, Adm Control, License issues, Block Node CS RRC Access FL: Radio Reasons, Ue Failures and RNC Failures Since the above charts shows domination on CS RRC Access FL, then the issues of Radio Reasons are most possible the main reasons for CS Access
Page 9
PS RRC Setup FL: MP Load, Block TNCs, Adm Control, License issues, Block Node PS RRC Access FL: Radio Reasons, Ue Failures and RNC Failures Since the above charts shows domination on PS RRC Access FL, then the issues of Radio Reasons are most possible the main reasons for PS Access, but the last few weeks have shown different trend
Page 10
Page 11
CS RRC Setup FL: MP Load, Block TNCs, Adm Control, License issues, Block Node Reasons of Admission Control has dominated since the beginning of the project Admission Controls might come from DL Power, DL Chnl Code, DL HW or UL HW For the last few weeks, lack of RBS License capacity has started apearing indicating the Capacity expansion required
Admission Controls might come from DL Power, DL Chnl Code, DL HW or UL HW For the last few weeks, lack of RBS License capacity has started apearing indicating the Capacity expansion required
Page 12
Page 13
PS RRC Setup FL: MP Load, Block TNCs, Adm Control, License issues, Block Node Reasons of Admission Control has dominated since the beginning of the project Admission Controls might come from DL Power, DL Chnl Code, DL HW or UL HW For the last few weeks, lack of RBS License capacity has started apearing indicating the Capacity expansion required
Same trend as CS RRC Setup FL Admission Control is the focus of RRC Setup FL distribution
Page 14
The charts above shows the DL Power has contributing at most for Adm Control followed by UL HW The review of pwrAdm + Pwroffset should be reviewed before judging the need of upgrading the DL Power Capacity; Verify maximumtransmissionpower againts maxDlpowerCapability at first The review of ulHwAdm should also be reviewed before judging to the need of CE UL
Page 15
DL Power and UL HW have been getting more dominant for the past few months
Page 16
RAB Part
Page 17
Page 18
Page 19
Page 20
Page 21
Admission Control aspects have been more dominating for the past 2 months
Page 22
Page 23
Page 24
Page 25
Page 26
The charts above shows the DL Power has contributing at most for Adm Control followed by DL CHNL Code
Page 27
Page 28
Summary
As the analysis shows us, in terms of RRC we have main reason of degradation is admission control when we break down the reasons we see the main degradation comes from DL Power. In terms of RAB we have main reason of degradation is again admission control and when we break down the reasons we again see the main degradation comes from DL Power.
Page 29