History
1st & 2nd Catastrophic Failures
Date in Operation
Material of Const. Design Code
: April 2000
: CS-HICN 516-60 N : ASME VIII
Shell Thickness
Inner Diameter Tang./Tang.
: 114 mm
: 2000 mm : 6500 mm
Fluid
Chloride
CO2
: 4.5 mole %
3
HISTORY
Factory Applied Internal Lining by Ceramic Filled epoxy in Nov. 1998. Test Separators Commissioning in Nov. 2000. Catastrophic Failure in April 2001
Field Re-lining Using the Same Lining Same Pattern Catastrophic Failure After 45 Days
ii. iii.
iv.
Aggressive environment
Documented compliance with the requested material performance technical data sheet.
Unconditional full recovery of the contract value if the applied system exhibits any of the following defects after 12 months of services.
i. ii. iii.
Lining De-lamination. Blister free for single layer system. 10% surface blisters for multi-layer system.
10
iv.
>5% coating cracks on top layer of multi layer lining system and cracks free single layer lining system.
iv.
iv.
20% reduction in the adhesion forces between any two adjacent layers or to the substrate, compared to that measured prior to boxing up.
11
12
INTERIM INSPECTION:
i.
ii.
iii.
iv.
13
INTERIM INSPECTION:
v.
Decision made to continue the service on the GRS-1 & 2 Test in services for additional period of six months and re-inspect. Postpone the decision on GRS-3&4 Test Separators to get more concert data from GRS-1 & 2 within 6 months. The two Separators were out of services.
vi.
14
Final Inspection:
i.
GRS-1 Test Separator lining system was found in sound conditions and fully meet the acceptance criteria. Propagation of the surface cracks within the acceptance criteria were found on the GRS-2 Test Separator.
ii.
15
17
ii. iii.
iv.
Aggressive environment
19
Both Epoxy Novolac resin and Glass Vinyl Ester lining systems are acceptable for high pressure & temperature wet sour gas services. Carry out the minor repairs on GRS-2 Test Separator and return to services. Box up GRS-1 Test separator and return to services. Apply Epoxy Novolac resin lining system on GRS-3 & 4 test separators. Conduct Off-stream inspection every two years.