OVERVIEW OF NTPC
National Thermal Power Corporation Limited (NTPC) is the largest thermal power generating company of India. A public sector company owned by Government of India, it was incorporated in year 1975 to accelerate power development in the country. Within a span of 30 years, NTPC has emerged as truly national generating facilities in all the major regions of the country.
: Faridabad Gas Power Project : Village Mujedi, P. O. Neemka, Faridabad, State Haryana : 432 MW = (138+138+156)MW : Gas Turbine 1 138 MW Gas Turbine 2 138 MW Steam Turbine 156 MW : Base Load : Natural Gas : Naphtha
Average Gas requirement Fuel Source Cooling water source Naphtha Storage 12. Power Evacuation
: : :
2 million cubic meters per day HBJ pipe line ( through GAIL ) Rampur Distributory
: 2 tanks of 8000 Kl. Capacity each. : 1. 2X220 KV Double circuit line to 220 kV sub-station at Samaypur(Ballabgarh) 2. 2X220 KV Double circuit line to 220 kV sub-station at Palla(faridabad).
MAIN PLANT:
NTPC-Faridabad is a Gas based Combined Cycle Power Plant. It has two gas turbines of 138 MW each. Natural Gas, when fired in combustion chamber, runs gas turbine. Exhaust gases from gas turbines go to two Heat Recovery Steam Generators. Superheated steam generated in these generators is used to run steam turbine coupled with Power Generator to get 156 MW.
CONTROL ROOM
HV- BREAKER
CONTROL SYSTEMS
STATIC STARTER
TURBINE
SYNCHRONOUS GENERATOR
EXCITATION TRANSFORMER
VARIOUS DEPARTMENTS
Water treatment plant Control and Instrumentation [C&I] Electrical maintenance Mechanical maintenance Information technology Safety and security Human resource
DM PLANT: DM Plant has been installed to provide demineralized water for steam generation & equipment cooling. It has two streams of 100 m3/hr each. Effluents generated are neutralized in the neutralization pit before discharging to Central Monitoring Basin.
C.W. SOFTENING PLANT: Raw Water Softening Plant has been provided. The raw water received is treated in clarifier, then passed through sand filter and stilling chamber. The water from cooling water-softening system is fed into basin of cooling tower.
C.W. CHLORINATION PLANT: NTPC-Faridabad has a Chlorination Plant for Chlorination of circulating water. It protects the water of cooling tower against bacteriological contamination. It has also in-built chlorine leak detection system. To control leakage of chlorine, a Chlorine absorption tower has been provided.
Mechanical Department
It basically deals with these components -: GAS TURBINE [GT] There are 2 GT in FPGS. STEAM TURBINE [STG] There is one STG.
Conditions at which GT works in INDIA 1 bar atm. Pressure 65% Humidity 27 degree C Ambient Temperature GT Output 106 MW
Gas turbine Cycle are of two types Open cycle Close cycle
Cycles of generator
Open Cycle -: In this type of cycle exhaust gases are directly sent to the atmosphere.
Close Cycle -: In this cycle all the gases are continuously circulated through the system. It is neither taken from the atmosphere nor returned to it.
COMBINED CYCLE POWER GENERATION USING GAS TURBINE AND STEAM TURBINE
ELECTRICAL DEPARTMENT
GT Generator
Apparent power Active Power Current Voltage Speed Frequency Power Factor Stator Winding Rated Field current Rated Field Voltage
STG Generator
Apparent power Active Power Current Voltage Speed Frequency Power Factor Stator Winding Rated Field current Rated Field Voltage
TRANSFORMER
Type of cooling Rated kVA Rated kV[HV] [LV] Rated line [HV] (amp) [LV] No. of phases % impedance
Frequency : 50 Hz Core and coil(kg): 1050 Tank and fittings(kg): 900 Mass of oil (kg): 350 Total mass (kg): 2300 Transport mass (kg): 2150 Vol. of oil (l) : 400
ISOLATORS: Isolators (disconnecting switches) are switches, which operate under no load conditions. They are used in addition to circuit breakers and are provided on each side of circuit breaker to provide isolation and enable maintenance.
While opening a circuit, circuit breaker is opened first and then the isolator. While closing a circuit, the isolator is closed first and then the circuit breaker.
EARTHING SWITCH: Earthing switch is connected between line conductor and earth. Normally, it is open. When the line is disconnected, the earthing switch is closed so as to discharge voltage trapped on the line. Generally, earthing switches are mounted on the frame of the isolators.
INSULATORS: Provision of adequate insulation in a substation layout is of primary importance from the point of view of reliability of supply and safety of personnel.
The operation of the power plant is controlled from the central control room in which the control panels are located. Provision is made for local starting and testing of the important equipments, pumps and motors.
For Instrumentation purposes -: Temperature sensors Pressure transducers For control purposes -: DDC-MIS
TEMPERATURE SENSORS
They are of three types as follows -: Bimetallic Field system Electrical RTD Thermocouple
PRESSURE TRANSDUCER
Different types of bourdan tubes for different types of pressure for low, medium and high pressure. For Low pressure (upto 1kg/cm2) Bellows are used. For Medium pressure (150 to 250kg/cm2) with c type bourdan tube. For High pressure above (300kg/cm2) spiral type is used.