Professional Documents
Culture Documents
3D - OVERVIEWS
BHIWADI PROJECT
SPECIFICATIONS
Earthquake resistant RCC structure with long lasting external textured paint.
FlooringVitrified tiles in rooms and balcony. Ceramic tiles in kitchen and bathroom.
Internal wall
Ceramic tiles bathroom and kitchen up to 5ft level and painted with pleasing shades of OBD paint. Plaster and painted with pleasing shades of OBD in bedrooms(s)/drawing/dining area.
Electrical
ISI Switch Points in each bedroom/ drawing/ dining & lounge/ bathrooms. Copper concealed wiring.
Doors/ Windows
Seasoned hardwood flushed frame doors with premium handles. Hardwood frame windows.
Plumbing
High quality UPVC piping. CP fittings.
FEATURES
Tastefully Designing 1- BHK Homes. STILT + 12 Landscaped Greens, Ample Green Area & Lift. Gated Community with 24 * 7 Security & Water Supply. State of the Art Clubhouse with Gymnasium. Meditation Lawns, Jogging Park & Play Area. ECO Friendly Design with Designated Parking Areas. Excellent Location Strategically Situated Near the Highway with Excellent Connectivity. 24 * 7 Power Back. 10 Minutes Drive from NH-8. Proposed Airport within 15 K.M.
Bhiwadi Homes Ek Ghar Mera Bhi
BHIWADI HOMES
Location Map - BHIWADI SITE
CLUSTER PLAN
PRICE LIST
PAYMENT PLAN
NOTES
:
* *
EDC/IDC extra as applicable. Registration Charges/ Property Tax/ Service Tax or any other taxes as levied by centre / state Government or competent authority will be Payable extra. PLC (Preferential Location Charges) @ 5% of BSP The Payment should be made in favor of Shobh Infrastructure Private Limited a/c Bhiwadi Homes. * Prices are subject to revision at the sole discretion of the company. * Price, terms and conditions mentioned herein are merely indicative with a view to acquaint applicant & not exhaustive. * In case you fail to pay installment by the given due date, the Company will charge interest @ 24% per annum, compounded quarterly for the period of delay in payment. * In case the outstanding dues are not cleared the Company reserves the right to cancel the Registration/booking without any intimation. * PFC (Parking Facility Charges). * PBC (Power Back-Up Charges). * SIPL Reserve the right to Add/Delete any Details /Specifications /Elevation/Location mentioned, if so warranted by the circumstances. Presently, the same are tentative & informative only. * After the possession CAM charges will have to be paid extra. * IFMS (Interest Free Maintenance Security) @ 30/- per sq. ft.