You are on page 1of 44

Security Level:

Check Hardware Installation Quality

www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

CONTENT
Check Antenna Installation Check ODU Installation Check IF Cable Installation Check IDU Installation

Antenna Installation Check List


Check Item 1 The matter that is paint break off and distorted can not appear on antenna. The antenna must be installed in the right height and position and polarization according to the design document or customer's instruction. The fixation of antenna and pole are reliable, all screws should be tightness. For the more than 1.2m antenna, the side strut must be installed and fixed position is correct. Antenna identifier: The identifier of each antenna should be labeled with opposite site name or ID. Result

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 3

Check Antenna Installation


The matter that is paint break off and

distorted can not appear on antenna.

The antenna must be installed in the

right height and position and polarization according to the design document or customer's instruction.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 4

Check Antenna Installation


The fixation of antenna and pole are

reliable, all screws should be tightness.

Each screw should be fastened well.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 5

Check Antenna Installation


For the more than 1.2m antenna, the

side strut must be installed and fixed position is correct.

1.Usually strengthening rod and hanging

bracket cannot locate at one side of antenna; 2.The height difference of two fixing points for strengthening rod should be as small as possible and the angle between strengthening rod and horizon could not over 25.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 6

Check Antenna Installation


Antenna identifier: The identifier of each

antenna should be labeled with opposite site name or ID.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 7

ODU Installation Check List


Check Item
1 ODU's and hybrid coupler's appearances are properly. The latches of the ODU and hybrid coupler should tightly engage on the antenna. The screws should be fastened tight. The IF connector of ODU should be waterproofed and face downward. IF redundant: Leave enough slack when connecting cables to the ODU to facilitate future maintenance. ODU grounding: The ODU grounding cable should be shortest length as possible and attached to the tower body by the cable clamp. Before attached grounding cable, must scrape-off the paint.

Result

2 3

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 8

Check ODU Installation


The latches of the ODU and hybrid

coupler should tightly engage on the antenna. The screws should be fastened tight. The IF connector of ODU should be waterproofed and face downward.

4 screws should be fastened.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 9

Check ODU Installation


Whether ODU is assembled with

Antenna directly or with Hybrid Coupler, the IF connector of ODU must be downtoward.

IF connector cant be up-toward.

IF connector must be down-toward.

For 1+1, main and standby ODUs IF

connectors must be down-toward.


HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Page 10

Check ODU Installation


For 1+1 HSB/FD application, hybrid

coupler top side which is attached label, must be up-toward.

The hybrid coupler top side which is attached label,

must be up-toward.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 11

Check IF Cable Installation


The ODU grounding cable should be

shortest length as possible and attached to the tower body by the cable clamp. Before attached grounding cable, must scrape-off the paint.

The grounding cable of outdoor unit

should be soundly fastened to grounding bar nearby.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 12

CONTENT
Check Antenna Installation Check ODU Installation Check IF Cable Installation Check IDU Installation

IF Cable Installation Check List


Check Item
1 In general, the IF cable should be grounded to a minimum of three points. When the IF cable is longer than 60 meters, add a grounding point for every extra 50 meters. The place about 1 m away from the ODU and 1 m away from the cable entry are propositional grounding point. All of outdoor connector should be waterproofed. Porthole: IF cable must be up-tilted or have Waterproof curve in the entrance of porthole.

Result

The IF cable route and position for the cabling should be designed beforehand and arranged neatly. IF cable turns should be smooth, and the bending radius should be larger than 30 cm.
The connection between the jumper and the IF cable should be connected in a correct and reliable way. If the connection is at outdoor, waterproof the connection.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 14

Check IF Cable Installation


In general, the IF cable should be

grounded to a minimum of three points. When the IF cable is longer than 60 meters, add a grounding point for every extra 50 meters. The place about 1 m away from the ODU and 1 m away from the cable entry are propositional grounding point. All of outdoor connector should be waterproofed.

The 3 grounding kits must be mounted.

1,2,3,4:IF Cable Grounding Point.


HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Page 15

Check IF Cable Installation


The angle between IF cable and

grounding cable is the smaller the better.

The angle should <15.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 16

Check IF Cable Installation


You should scrape the paint on the iron

before mounting the grounding kits.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 17

Check IF Cable Installation


The grounding kit screw must be

fastened tightly.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 18

Check IF Cable Installation


Porthole: IF cable must be up-tilted or

have Waterproof curve in the entrance of porthole. The IF cable route and position for the cabling should be designed beforehand and arranged neatly. IF cable turns should be smooth, and the bending radius should be larger than 30 cm.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 19

Check IF Cable Installation


All of outdoor connector should be

waterproofed.

The ODU IF interface should be

waterproofed.

The area for grounding kit

should be waterproof.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Page 20

Check IF Cable Installation


The operation of waterproof must be

regular.

Wrapping a layer of PVC

Wrapping three layers of

tape.

waterproof insulation tape.

Wrapping three layers of

PVC tape over the Using the outdoor bundling waterproof insulation tape. strap to bind the PVC tape tight Huawei Confidential HUAWEI TECHNOLOGIES CO.,ends. LTD. at both

Page 21

Check IF Cable Installation


The 2 ends of waterproof area should be

tied with cable tire.

The 2 ends arent

The 2 ends arent

tired with cable tire.

tired with cable tire.

The 2 ends are tired

with cable tire.


HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Page 22

Check IF Cable Installation


The cable tire should keep a spare

length after cutting.

No spare long.

Reserve spare long.


HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Page 23

Check IF Cable Installation


The IF cable and GND cable should be

tired with iron tower by cable tire.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 24

Check IF Cable Installation


The reserved IF cables length outside or

indoor should be appropriate (5m), otherwise, it will affect signal quality and grounding. The reserved IF cable should be arranged tidily.

The IF cables should be lined up tidily

and neatly, and should be no obvious breakage or distortion, and any exposed copper is not allowed. The bending radius of the IF cable should be equal to or greater than 55mm.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 25

Check IF Cable Installation


The IF cable/Feeder should be

tied/clamped on the vertical cable ladder rung with 1m to 1.5m interval

<1.5m.
After the IF cable are installed, the

fixing ties with proper tightness and be directed in the same way. All the root of the ties should be totally cut off without leaving any sharp ends.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 26

Check IF Cable Installation


The holes for IF cable should be sealed.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 27

Check IF Cable Installation


The main ODU of hybrid coupler must

connect with the main IF board.

For the assembled Antenna:

Right ODU: main; Left ODU: Standby.

Standby 1

Main 1

Standby 1

Main 1

IF cable temporal Label

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 28

CONTENT
Check Antenna Installation Check ODU Installation Check IF Cable Installation Check IDU Installation

IDU Installation Check List


Check Item 1 The installation position of IDU accords to the engineering design document. The matter that is paint break off and scratch and smear can not appear on IDU. Otherwise the equipment must be repaint and cleaned. There must be a space of 1 unit at the top and bottom of the IDU chassis for heat dissipation. If there are multiple IDU, label opposite site name or ID for each one. Result

Check Power Supply protection circuit breakers values accords to the engineering design chart.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 30

Check IDU Installation


The installation position of IDU accords

to the engineering design document. The matter that is paint break off and scratch and smear can not appear on IDU. Otherwise the equipment must be repaint and cleaned.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 31

Check IDU Installation


There must be a space of 1 unit at the

top and bottom of the IDU chassis for heat dissipation. Height > 1U

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 32

Check IDU Installation


The matter that is paint break off and

scratch and smear can not appear on Rack. Otherwise the equipment must be repaint and cleaned.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 33

Check IDU Installation


The cable running should clean and

tidily.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 34

Check IDU Installation


The GND cable is the shorter the better.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 35

Check IDU Installation


The cable running should clean and

tidily.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 36

Check IDU Installation


The equipment room should be cleaned

every day.

1.The packages and boards of equipment

should not be left disorderly in the equipment room. 2.No residue of the cut-off cable ties or any other unnecessary articles should be left on the floor. 3.Nothing unnecessary such as the residue of the cutoff cable ties or bolts should not be left in the cabinet.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 37

Check IDU Installation


IF Jumper Label The screws of board should be fastened

well. Label for each cable should be clear and tidily.

Trunk Cable Label IDU Label

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 38

Check IDU Installation


Label for each cable should be clear Power Cable Label

and tidily.

DDF Label

DCDB Label

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 39

E1 cable color code identification.


Transmit Pair No 1 2 3 4 5 6 7 8 Color code Major White White White White White Red Red Red Minor Blue Orange Green Brown Grey Blue Orange Green 1 2 3 4 5 6 7 8 1 2 3 E1 # Receive Pair

No

Color code
Major White White White Minor Blue Orange Green 1 2 3

E1 #

4
5 6 7 8

White
White Red Red Red

Brown
Grey Blue Orange Green

4
5 6 7 8

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

DDF Krone block layout.


Front view
a b s a b s a b s a b s a b s a b s a b s a b s

(anticlockwise) Side view


3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0

(Clockwise)

a b s a b s a b s a b s
a b s a b s a b s a b s a b s a b s a b s a b s a b s a b s a b s a b s a b s a b s a b s a b s a b s a B a a a s a b s

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

DDF labeling example

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

An example of terminated DDF


An IDC(punch down) tool is used to properly secure the cable in place.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Thank you
www.huawei.com