BIDDING DOCUMENTS Bidding Requirements Contract Forms

Contract Conditions
Specifications Drawings

OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401

CONTRACT DOCUMENTS Contract Forms Contract Conditions Specifications Drawings

OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401

PROJECT MANUAL

Bidding Requirements
Contract Forms Contract Conditions Specifications

OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401

Bidding Requirements

invitation instruction information bid form bid bond

OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401

Contract Forms

agreement performance bond

payment bond
certificates

OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401

Contract Conditions

general supplementary

OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401

Specifications general siteworks concrete masonry metals wood and plastics thermal&moisture protection doors&windows finishes specialties equipment furnishings special construction conveying systems mechanical DOCUMENTS electrical OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401

BIDDING DOCUMENTS

Bidding Requirements
Contract Forms Contract Conditions Specifications Drawings architectural structural sanitary mechanical DOCUMENTS electrical OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401

CONTRACT DOCUMENTS

Contract Forms
agreement performance bond payment bond certificates

Contract Conditions
general supplementary

Specifications Drawings

BASIC PROVISIONS

Contracting Parties Scope of Work Architects Services Architects Fee and Manner of Payment Owners Responsibilities Expenses Chargeable to both parties Project Supervision Estimates Ownership of Documents Successors and Assigns Arbitration Acknowledgement and Jurat

AGREEMENTS
OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401

architectural - Perspective
Location Plan Vicinity Map Floor Plans Elevations Sections Foundation Plan Footing Details Beam & Column Details Floor Slab Details Floor Framing & Details Roof Framing & Details

sanitary
- Water Distribution System - Drainage System - Liquid and Solid Waste

mechanical
- air-conditioning system - movement systems

structural

electrical
- lighting system - power distribution system

PLANS
OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401

The Parties Art.1. Scope of Work Art.2. Time of Completion and liquidated damages Art.3. The Contract Amount

Art.4. Payments
Art.5. The Contract Documents Art.6. Performance and Payment Bonds

Art.7. Taxes, Licenses, Permits and Fees


Art.8. Insurance and other Conditions

OWNER-GENERAL CONTRACTOR AGREEMENT UAP DOCUMENT NO.402

purpose&importance of specifications

a written document that provides information required for proper construction or material and equipment procurement, which cannot be placed in the drawings

architect as specification writer


qualifications of a specifications writer types of specs

16-division uniform construction index


3-part format elements of specs. composition

spec. language
step by step specification writing

SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307

purpose&importance of specifications architect as specification writer

scope of work materials to be used method of installation quality of workmanship

qualifications of a specifications writer types of specs 16-division uniform construction index 3-part format elements of specs. composition spec. language step by step specification writing

SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307

The 16-division uniform construction index:


1- General Requirements 2- Sitework 3- Concrete 4- Masonry 5- Metals 6- Wood and Plastics 7- Thermal and Moisture Protection 8- Doors and Windows 9- Finishes 10- Specialties 11- Equipment 12- Furnishings 13- Special Construction 14- Conveying Systems 15- Mechanical 16- Electrical

SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307

part 1: general
-scope -description of systems -reqts of regulatory agencies -qualifications -submittals -mock-up -product handling -environmental conditions -protection -operating instructions -extra stock -alternates -measurement and payment

the three-part section format:


part 3: execution part 2: product
-materials -mixes -equipment -fabrication -source quality control -condition of surfaces -preparation -installation -field quality control -adjusting -patching -cleaning -schedules

SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307

types of specifications:
performance specifications descriptive specifications brand name specifications - closed - open reference specifications combination

SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307

scheduling techniques
bar chart s-curve

linked bar chart


line balance critical path method

importance of time management contract stipulations labor paid by hour/day equipment rental by hour/day

liquidated damages

D 3 I .5 A 2 B 2 G 1 H I .5 J 1 C 3 E 4 F 6 2 K 3 J

pert-cpm
activity
network duration event

dummy activity
critical path float/slack early start

late start
late finish

PROJECT SCHEDULE

bar-chart
ITEMS COST OF TOTAL COST DESIGN & WITH LABOR MATERIALS & ADD-ONS 1,000,000 332,000 100,000 222,800 1,012,494 488,640 3,831,600 252,500 3,261,800 696,000 5,375,954 239,790 87,000 287,410 1,430,411 18,618,399 11,794,756 PROJECTED MONTHLY ACCOMPLISHMENT PROJECTED CUMULATIVE ACCOMPLISHMENT % ACCOMPLISHMENT 30,413,155 30,413,155 1,332,000 1,332,000 4.38% 2,466,312 3,798,312 12.49% 5,202,420 5,359,970 6,192,457 5,647,208 4,212,788 9,000,732 14,360,702 20,553,159 26,200,367 30,413,155 29.59% 47.22% 67.58% 86.15% 100.00% 1,000,000 332,000 168,231 374,820 1,703,333 822,046 6,445,955 424,784 5,487,373 1,170,891 9,044,044 403,402 146,361 483,514 2,406,401 601,600 1,203,200 601,600 390,297 212,392 374,820 1,277,500 425,833 822,046 2,148,652 212,392 1,829,124 780,594 2,214,681 3,414,681 403,402 146,361 483,514 3,414,681 1,829,124 1,829,124 2,148,652 2,148,652 MONTH 0 MONTH 1 MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6 DESIGN PREPARATION PRE-CONSTRUCTION SITEWORKS UTILITIES CONCRETE MASONRY METALS WOOD AND PLASTIC THERMAL AND MOISTURE PROTECTION DOORS AND WINDOWS FINISHES SPECIALTIES EQUIPMENT FURNISHINGS MECHANICAL AND ELECTRICAL 1,000,000 332,000 168,231

17,286,399

29,081,155

s-curve
S-CURVE
% ACCOMPLISHMENT
120 100 80 60 40 20 0 Series1 1 4.38 2 12.49 3 29.59 4 47.22 MONTH 5 67.58 6 86.15 7 100 Series1