INDUSTRIAL TRAINING PRESENTATION

PRESENT BY:

NURMAIZURA BINTI ARIS


AE09010

JABATAN KERJA RAYA, KOTA TINGGI, JOHOR.


FUNCTIONS Jabatan Kerja Raya (JKR) is responsible for the planning, designing and construction of infrastructure projects in Malaysia and is the implementing agency and technical consultant to the government. As the implementing agency and technical consultant for the majority of the government projects, JKR provides project management, asset management and technical consulting service as the departments core business.

INDUSTRIAL TRAINING SCHEDULE


BUILDING DEPARTME NT
18.06.2012 25.07.2012

ROAD DEPARTMEN T
26.07.2012 31.08.2012

QUANTITY SURVEYOR DEPARTMEN T

01.09.2012 07.09.2012

BUILDING DEPARTMENT

Pre-handing over school (SJKC GOGOK, Kota Tinggi,


Johor )

Construction of 1 storey building of workshop at SMV Construction of 1 storey building of arc and gas at SMV Construction of Mosque Quarters 4 storey at Tg.Sedili Construction of Mosque at Pasir Gogok

PRE-HANDLING OVER A SCHOOL

This pre- handing over is be held in order o avoid incoming problem after full handing over. During this visit, the school need to prepared a representative in order to check up the school that are ready to hand over.

Problems: a. The switch is unable to function well b. The toilet is having leakage( piping system) c. Furniture that is not in accordance with drawings (unsuitable) etc. Solution: a. The sub contractor is needed to repairing the damage which have been trace by the school representative and JKR Technician.

The piping system that did not follow as in plan.

The electricity that did not function well.

The grille assembly messy.

SMV : 1-Storey Workshop


Site progress: a. Setting-out b. Site investigation

Setting-out
Site Investigation

The materials that need to be removed from the site(clearance).

The rod is marked every 1feet.The rod is treaded together with barrel connectors. Light hand- operated driving hammer 5kg. During this step, they must count the number of blow and recorded for each 1feet. Tree location is disturbing the project.

Pasir Gogok: Mosque Construction


Site Progress: a. Pile Foundation (Drop hammer)

SMV : 1-Storey Building Of Arc and Gas


Site Progress: a. Excavation b. Pad Footing

Deep Foundation System

Figure 5: Pile marking each 1 feet is done before lifting.

Piles lifting .

Drop Hammer is used for the installation.

Shallow Foundation System

Works of dig land before reinforcement is installed for pad footing. After reinforcement installation (lean concrete is needed)

The vibrator is used to compact the concrete.

Tg. Sedili: 4-Storey Building Of Mosque Quaters


Site Progress: a. Pile cap b. Concrete of beam and slab(ground floor) c. Concrete of column

Tg. Sedili: 4-Storey Building Of Mosque Quaters

Ensure position column at line that is straight

While concrete being poured, raked and vibrated (beam and slab concrete)

Figure 26: The concrete is poured to the formwork of column.

Problem: the beam is filled with mud Solution: Spray of the clean water

S O L U T I O N

P R O B L E M

Problem: the concrete is dry up Solution: continuously wet by ponding with water.

ROAD DEPARTMENT
Routine Road Forensic Field Density Test (Sand Replacement Method)

RO1 Pavemen (pothole Repaired)

RO2 Road Shoulder Maintenance

R03 Grass Cutting

RO6 Drain Maintenance

RO5 Bridge And Culvert

R04 Road Furniture

RO1-Pavement

RO3- Grass Cutting


RO7- Drain Maintenance

ROAD FORENSIC
Determination of pavement surface texture depth. Sand Patch Method

Portable skidresistance

Determination of the friction between a skidding tyre and wet road surface.

The surface to be measured is dry and is sweep clean with a soft brush.

The cylinder is filled with sand, the base is tapping three (3) times on the surface to ensure compaction, and the sand level with the top of the cylinder is strike off.

The sand is carefully pour into a conical heap on the surface to be tested

The handle of the wooden is holding between the thumb and fore finger, and without applying vertical pressure on the disc, the sand is spread in a spiral motion from the centre of the heap so that the sand is spread into a circular patch all times.

Portable skid-resistance tester is setting out. Ensure it bubble is in the middle.

The below surface of the road is wet with the water to check lubricating the road when rainy day.

Rubber slider is let go (ensure it touch the road surface). The reading is recorded.

The thermometer is used to gained road temperature at that point.

Field Density Test (Sand Replacement Method)

Lay metal tray with hole over the portion of material to be tested.

A round hole was excavated (6 inch diameter and 6 inch depth).

The pouring cylinders was placing over excavate hole.

The sand that run out after the shutter is opening.

CONCLUSION

Able have many experiences and knowledge that could not achieve during in lecture is available while undergoing industrial training. Among premier was difference between theory and practical. Able to increase self confidence to face real work nature but also also help improve way in communicating and social intercourse with public Able to see how to communicate with workers subordinates or superior which involved with this department whether from

THANK YOU