7 TYPES OF WASTES
1.Motion 2.Transportation 3.Waiting time 4.Overproduction 5.Processing time 6.Defects 7.Inventory
www.a2zmba.com
TRANSPORT WASTE
Characteristics: Extra carts, fork lifts, dollies Multiple Storage Locations Extra Material Racks Complex Inventory Management Extra Facility Space Incorrect Inventory Counts Damaged Material
Causes: Large Lot Processing Unleveled Schedules Lack of 5 Ss Lack of Visual Controls Improper Facility Layout Large Buffers and In Process Kanbans
www.a2zmba.com
MOTION WASTE
Characteristics: Looking for Tools Excessive Reaching or Bending Material Too Far Apart (Walk Time) Equipment for Moving Parts Extra Busy Movements While Waiting
Causes: Equipment, Office & Plant Layout Lack of 5 Ss Lack of Visual Controls Inconsistent Work Methods (Standardized Work) Large Batch Sizes
Waiting time
Waste that results from customer orders, inventory, or
completed products waiting in queue for a process to begin. High inventory encourages higher product waiting time Operator waiting time implies under-utilization and poor control of workflow Reduces value for customers Increases delay to obtain financial return on the product
www.a2zmba.com
www.a2zmba.com
OVERPRODUCTION
Characteristics:
The production of goods in excess of absolute consumer requirements Manufacturing too much or too early or just in case Discourages a smooth flow of goods and services Leads to excess inventory Producing more than needed, producing faster than needed Inventory Stockpiles Extra equipment/oversized equipment Unbalanced Material Flow Extra Part Storage racks Extra Manpower Batch Processing Complex Inventory Management Excessive Capacity/Investment Excessive Obsolescence Incapable processes Just in case reward system Lack of communication Automation in the wrong places Low uptimes
www.a2zmba.com
Causes:
Processing time
Effort Which Adds No Value To a Product or Service. Results from steps in production processes that do not contribute value or create too much cost
Characteristics: Process Bottlenecks Lack of Clear Customer Specifications Endless Refinement Redundant Approvals Extra Copies/Excessive Information Causes: Engineering Changes Without Processing Changes Decision Making at Inappropriate Levels Inefficient Policies and Procedures Lack of Customer Input Concerning Requirements
www.a2zmba.com
Defects
Reduce or discourage customer
satisfaction Defects have to be rectified Rectification costs money with regard to time, effort and materials Loss of customers
www.a2zmba.com
Inventory waste
Waste that consists of excess inventory over and above that which is necessary. It increases costs and lead times Reduces quality and flexibility Characteristics: Extra Space on Receiving Docks Material Between Processes Stagnated Material Flow LIFO instead of FIFO Extensive Rework When Problems Surface Long Lead Time for Engineering Changes Additional Material Handling Resources (Men, Equipment, Racks, Storage Space) Causes: Incapable Processes Uncontrolled Bottleneck Processes Incapable Suppliers Long Change Over Times Management Decisions Local Optimization
www.a2zmba.com
The Toyota Production System was adopted by many Japanese companies in the aftermath of the 1973 oil shock Waste Elimination Philosophy: .. Above all, one of our most important purposes was increased productivity and reduced cost. To achieve this purpose, we put our emphasis on the notion of eliminating all kinds of unnecessary functions in the factories. Our approach has been to investigate one by one the causes of various "unnecessaries" in manufacturing operations and to devise methods for their solution, often by trial and error ... Taiicho Ohno, Former Vice President, Toyota Motor Corp., Former President, Japan Industrial Management Association; Former Chairman, Toyoda Spinning and Weaving Co., Ltd.
www.a2zmba.com
TYPES OF WASTE
Excessive production resources (primary waste): excessive workforce excessive facilities excessive inventories unnecessary capital investment
Overproduction (secondary waste - the WORST waste): leads to Excessive inventories (tertiary waste): extra jobs make overproduction invisible. adds losses in opportunity cost leads to Unnecessary capital investment (fourth waste): adds facility depreciations and overhead cost
www.a2zmba.com
www.a2zmba.com
Systematic Systematic OrganizationIdentifying what items are required and which are not.
Standardizing ControlMaintain and continually improve the previous improvements. Scrubbing Clean-Keep the area free from debris, dirt, oil, items not needed.
www.a2zmba.com
Sorting Visual PlacementItems should be easily retrievable, easy to get, and visual-easy to see.
5 S Element
Deliverable
Systematic Organization
Elimination of finding. Reduction of part selection errors. Elimination of finding. Elimination of nonconformances. Elimination of motion. Reduction of part selection errors. Increased safety. Preventive maintenance. Increased equipment knowledge. Increased equipment life. Higher morale. Clean environment. Increased visibility of nonconformances. www.a2zmba.com
Sorting-Visual Placement
Reduced Costs Improved Quality Increased Product Options Reduced Costs Increased Safety Improved Quality Increased Product Options.
Scrubbing Clean
Increased Safety Improved Quality Improved Quality Consistent Delivery Improved Safety
Standardization Control
When To Use
Expected Benefits