Management Project
Group No. ( 1 )
1- Project Scope
2- Mobilization
3- Earth Works
4- Foundation
5- Skeleton
6- Finishing
7- MEP
8- Envelope
square
The Main contractor of the project is El-Ro`ya with Budget 48 million LE
The Hospital contains 6 Floors consisting of basement , ground floor ,
I.
Caravans.
II. Cafeteria.
III. Stacking places to store
materials safely.
22.3 km
I.
I. Installation of formwork for plain concrete for Raft and Retaining wall
II. Pouring with ready mix concrete from unimix by 2 pumps
III. Dismantling
IV. Formwork for raft and retaining wall
V. Steel fixing for raft and retaining wall
VI. Pouring for raft and retaining wall and columns heads
VII. Dismantling
VIII.Backfilling with clean sand by Trucks with capacity 18 m3 from industry
area , 6 zone , 6 October city
SKELETON
Formworks for Columns , slabs and stairs for each floor
Steel fixing for Columns , slabs and stairs for each floor
Pouring for Columns , slabs and stairs for each floor by ready mix concrete from
Brick works in basement after dismantling for slab and so on in all floors using 2
MEP
Putting water and sewage pipes in walls and floors
Motor to pump sewage from basement to ground surface level
Accessories for wet areas
Pipes for Fire Fighting system in ceiling
Fire fighting accessories after installing False Ceiling
Ducts and Chilled water pipes for HVAC system
Fan Coil Unit for each floor
Chiller installation on roof
Putting Conduits on formworks before pouring slabs
Fix Conduits & Boxes in walls
MEP(CONT.)
Cables trucking before installing false ceiling
Installation of Distribution Boards after Brick works
Wiring
Fire alarm , switches , sockets and light accessories after false ceiling
Finishing Envelope
Connecting Electrical system of the Hospital with the main Electrical system
Green areas irrigation system
Lighting features for external area
Planting
Roads will be Interlock and Asphalt