Professional Documents
Culture Documents
Scheduling
SHEDULING IN
INTERMEDIATE-VOLUME
SYSTEMS
outputs
The
RUN
SIZE OF JOBS
THE TIMING OF JOBS
THE SEQUENCE
GANTT CHART
Chart used as visual aid for
loading and scheduling purposes.
TYPES OF GANTT CHART THAT
COMMONLY USED.
LOAD CHART
SCHEDULE CHART
LOAD CHART
A Gantt chart that shows the
loading and idle times for a group
of machines or list of departments.
TWO DIFFERENT APPROACHES
USED TO LOAD WORK CENTERS
INFINITE LOADING
FINITE LOADING
MODEL A linear
programming model for optimal
assignment of tasks and resources.
HUNGARIAN METHOD Method
of assigning jobs by a one for one
matching to identify the lowest- cost
solution.
Hungarian method
1.)Row reduction - Subtract the
smallest number in each row from
every number in the row.
SEQUENCING-
WORKSTATION
PRIORITY
CLASSIFIED AS EITHER
services
systems
Reservation
systems
scheduling flexibility
including legal behavioral
technical
budget
and union constraints.
Scheduling Multiple
Resources
In some situations, it is
necessary to coordinate the
use of more than one resource