Software Testing Process

Presented By CTS

Software Testing Process


Contents
Software Testing Process
Performing Risk Analysis
Perrys Approach
Risk Dimensions
Risk assessment methodology
Establish, Identify, Prioritize, operationalize test objectives
Construct Test Plan
Construct Test cases
Execute Unit/Integration, system Tests
Analyze and Report test results

Software Testing Process


Defining testing process
Making testing process repeatable
High risk components of the system are tested
avoiding problems of omission (inadequate testing)
avoiding problems of commission(testing part of the

systems that are not important)


Effects of skilled and unskilled testers
Adding intelligence to testing
Providing metrics for managing and controlling testing
Providing basis for test automation
Producing specific test deliverables

Software Testing Process


Basics of Testing Process
Test team should be organized concurrently with

the development team


Purpose of test team is to perform verification and

validation as it relates to implementation


For a specific project the purpose of test team is to

perform
verification and validation for the deliverables from
the development and solution delivery
to act as consultants to the development team during
unit testing

Software Testing Process


Tasks
Identifying key application areas
Identification of key application areas
Identify testing groups responsibilities

Identifying key individuals


Individual involved in testing directly and indirectly
Testing team members will act directly
QA Managers, QA Analysts, Test Manager, Test
Analyst, PM, PL, Analyst, database service personnel,
network service personnel, customers

Software Testing Process

Tasks cont.

Assign individual responsibilities


Developing the test plan
Defining the required test resources
Designing test cases
Constructing test cases
Executing test cases in accordance with the test plan
Managing Test resources
Analyzing test results
Issuing test reports
Recommending application improvements
Maintaining test statistics

Software Testing Process


Outputs
Application areas involved in testing per team

member
Team member responsibilities
Team work plan
The work plan defines milestones and tentative

completion dates for all assigned tasks.


A project management tools such as Microsoft

Project can make this task very easy and the


resulting document is a Gantt Chart that illustrates
who is responsible for what and when.

Software Testing Process


Performing Risk Analysis
The purpose of business risk analysis during

software testing is to identify high-risk application


components that must be tested more thoroughly,
and to identify error-prone components within
specific applications which must be tested more
rigorously.
The key to performing a successful risk analysis

is to formalize the process. An informal approach


to risk analysis methods leads an ineffective
analysis process.

Software Testing Process


Perrys Approach
The first is Judgment and Instinct.
This is the most common approach to

performing risk assessment during testing.


It is an informal approach using the testers

Knowledge, and experience with past projects, to


estimate the amount of testing required for the
current project.
Perry says this can be an effective method, but

he sees the fact that the testers experience is not


readily transferable to other testers as its primary
fault.

Software Testing Process


Perrys Approach
In terms of the SEI Maturity model, this risk

assessment process would be somewhere between


levels 1 and 2. It is a repeatable approach, but is
not formally written down for others to use.
The second method is Dollar Estimation.
This approach quantifies business risk using

dollars as its unit of measure.


It requires a great deal of precision and is

difficult to use because results are based on


estimates of frequency of occurrence and the loss
per occurrence.

Software Testing Process

The third approach is Identifying and Weighting Risk


Attributes.
This approach identifies the attributes that that

cause a risk to occur.


The relationship of the attributes to the risk is

determined by weighting.
The tester uses weighted numerical scores to

determine what the high risk areas are.


The scores can be used to decide what application

components should be tested more thoroughly than


others, and total weighted scores can be used to
compare one application to another.

Software Testing Process


The fourth approach is The Software Risk Assessment
Package.
This is an automated approach that involves

purchasing an assessment package from a vendor.


The advantage is the ease of use and the ability to

do What-If-Analysis with risk characteristics.


Automated risk assessment software packages

exist which use the second and third approaches


above, however, testers can create their own risk
assessment questionnaires with MS Word and do
the what-if-analysis with MS Excel.

Software Testing Process

Risk Dimensions

The risk dimensions Perry identified are Project

Structure, Project Size, and Experience with Technology.


With respect to project structure, the more structured a

project the less the risks. Thus, software development


projects that employ some type of project
management/development life cycle approach should be at
less risk.
Project size is directly proportional to risk. The larger

the project in terms of cost, staff, time, number of


functional areas involved, etc., the greater the risk.

Software Testing Process


Risk Dimensionscont.
Technology experience is inversely proportional to

project risk. The more experience the development team


has with the hardware, the operation system, the database,
the Network, and the development language the less the
risk

Software Testing Process


Tasks
Perry advocates a five-part risk assessment methodology.
The tasks are:

Ascertaining the risk score


This involves conducting a risk assessment review with

the development team.


During the session a risk assessment questionnaire is

used to structure the process.


Each question is asked of the development team

members in group session and a consensus is reached as to


the perceived level of risk (an alternative approach would
be to have individual developers each fill out the
questionnaire and consolidate the responses).

Software Testing Process


The questions are closed-end questions with the possible

responses of Low, Medium, High, and Not Applicable.


A numeric rating is assigned to the response.
A final score is calculated using weighting by which the

numeric rating is multiplied.


The weighted scores are used to identify error-prone

areas of the application and to compare the application


with other applications.

Software Testing Process


creating the risk profile
A weighting system is used to compute a score that

reflects the importance of each area.


Areas which are twice as important can be weighted with

a value of two
(e.g. an area with medium risk (2 points) could be

considered two times as important as the other areas and


have a final weighted score of 2 * 2 = 4 points (the weight
times the risk points)).
A total score is computed for the project, but the

individual scores are used to develop the risk profile. Use


the following approach (Perrys approach with some
extensions) to construct the profile.

Software Testing Process


Once the risk data have been collected, create an MS

Excel spreadsheet that computes the weighted scores.


Sort the tabulated scores from the highest to the lowest (a

pseudo-frequency distribution of sorts) and perform a


Pareto Analysis (the 80/20 rule) [6] to determine what
project areas fall into the upper 20% of the distribution.
These are the areas that are at risk the most and they are

the areas that will need to be tested the most.


The results are rather obvious when charted using Kiviat

Charts (radar charts). The high risk areas standout visually.


(The charting should be done based on data sorted in
ascending order by question number not on data sorted in
descending order by highest to lowest for the Pareto
Analysis.)

Software Testing Process


Modify the risk characteristics (optional for testing)
Perry argues that once the areas at risk have been

identified a proactive approach can reduce risk.


He suggests that steps be taken to change the

development approach or the project structure in order to


reduce risk.
When these alternatives are not feasible, the process of

using the risk information to decide what areas to test


becomes even more critical.

Software Testing Process


allocate the resources
Perry suggests allocating the most test resources to the

high-risk areas, allocating less testing resources to medium


risk areas and minimal testing resource to low-risk testing
areas.
A sound strategy is to assure that all of, or as many of as is

possible, of the medium to high-risk areas are tested with the


scope of the allotted testing resources.
A possible split could be to commit 80% of the testing

resources to medium and high-risk areas, and commit the


remaining 20% to low risk areas. This is again applying the
80/20 rule

Software Testing Process


compile a risk assessment database
A risk assessment database has two important functions.
First, it can be used to improve the risk assessment

process itself.
Second, the data can be used to help management plan

and structure development projects.

Software Testing Process


The Risk Assessment Review Session
The entire test team along with end user representatives

should be included in the session.


He recommends conducting the session early in the test

process.
It should last no more than two hours.
It should be run formally by the test team manager who

facilitates the session.


The session should have two objectives.
The first objective is to answer each question on the risk

assessment questionnaire.
The second is to brainstorm and let the participants voice

their concerns about the system under development.

Software Testing Process


Outputs
Completed Assessment Questionnaire
As the risk assessment review is completed, preliminary

score for each question should be recorded on the


questionnaires.
After the review session, the scores should be converted

to weighted scores and entered into a spreadsheet for


subsequent analysis.
The original questionnaires should be filed away and

kept for future reference.

Software Testing Process


Outputs
Risk Score Analysis Results
The results in the sample Kiviat Chart below were taken
from the General Risk Assessment Questionnaire data.
They are easy to interpret.
The further out along the axis a risk factor is placed the

greater the risk.


In the sample data it is obvious that the information of

software development and the lack of documentation are


major risk areas.

Software Testing Process


Risk-based test resource allocation plan
A risk-based test resource allocation plan is a document

containing recommendations for allocating test resources as


based on the risk analysis results.
It should list the risk areas from highest to lowest risk and

should assign a percentage of the available testing resources


to each risk sector.

Software Testing Process


risk database
A risk database should be maintained that contains the

project name under test, the risk assessment results from


the project on a question by question basis, the analysis of
the results on a question by question basis, graphs/charts
of the results, and the test resource allocation
recommendations.

Software Testing Process


Establish Test Objectives
Establishing Software testing Objectives is a critical part

of planning the Software testing process.


Defining testing objectives is also one of the most difficult

test planning activities.


It is difficult because humans frequently do not have a

clear idea of what they want to do until they begin to do it.


This means the best laid test plans change during test

process execution.
This is a problem without a solution, but there are some

actions testers can take which will improve test planning.


The establishment of clear testing objectives goes a long

way toward offsetting future execution problems.

Software Testing Process

Establishing Test objectives cont.


An objective is a testing "goal."

It is a statement of what the tester wants to accomplish

when implementing a specific testing activity.


Each testing activity may have several objectives and

there are two levels of objective specification.


A test plan should contain both high-level general

objectives in the overview section, and specific low-level


"provable" objectives for each particular type of testing
being implemented.
The latter kind being operational goals for specific testing
A good set of operational objectives can intuitively explain

why we are executing a particular step in the testing


process.

Software Testing Process


Establishing Test objectives cont.
Inputs
Risk Analysis Results
System Requirement Document
The system requirements document should have been

created as part of the overall project documentation.


If it has not be created, or is not complete, then the

project, as well as, your testing effort, is already in trouble.


Test objectives are really test requirements and they are a

direct reflection of the system requirements as described in


the Software Requirements Specification document.

Software Testing Process


The requirements specification can take many forms

from homegrown to a deliverable from a commercial


development methodology.
Regardless of their source, they must be as complete as

possible to assure the completeness of the testing effort.


An important task is to review the requirements prior to

using to establishing test objectives.


The software design document also known as the

functional specification document should be made


available as part of the on-going project documentation.
It is a functional decomposition of the system's functions

and sub-functions that will be translated in to software


programs and program modules.

Software Testing Process


At a minimum it should describe all of the system

functions, the interdependencies among those functions,


the system interface, and a detailed description of the
internal design details of each function.
The descriptions can take the form of Narratives,

Structure Charts, Structured English, Tight English, Flow


Charts, Pseudocode, etc. Regardless, these levels of design
information are required to formulate White Box testing
objectives.

Software Testing Process


Tasks - Identify Test Objectives
Three methods can be used to specify test objectives. The
first is brainstorming. The test team uses "creative"
interaction to construct a list of test objectives. This is not a
free-for-all process. It should be based on analysis products
such as the diagrams/text of the requirements specification.
It should be performed as a walkthrough the specifications
section by section.
The second approach is to identify "key" System

functions. Next, specify test objectives for each function.


This procedure can also be performed as a walkthrough of
the functional requirements section by section.
The third method is to identify business transactions and

base objectives on them. This can be thought of as Scenariobased as business cycles could be used to drive the process.

Software Testing Process


Define completion criteria
A completion criterion is the standard by which a test

objective is measured. Completion criteria can be either


quantitative or qualitative.
The important point is that the test team must some how

be able to determine when a test objective has been


satisfied.
One or more completion criteria must be specified for

each test objective.


Prioritize test objectives
The test objectives should be prioritized based on the risk
analysis findings. Priority should be assigned using this
scale.

Software Testing Process


Prioritize test objectivescont.
High - Most important tests: must be executed
Medium - Second-level objectives: should be executed

only after high-priority tests


Low - Least important: should be tested last and only if

there is enough time


High and Medium test objectives should be assigned more

resources that Low priority objectives.

Software Testing Process


operationalise test objectives

Manual
Test objectives should be implemented manually in the

form of quality checklists, with one or more checklist items


satisfying a specific objective. (Single checklist items can
also satisfy more than one objective, as is the case for the
date field objectives).
Objectives are internally linked to testing activities

because they drive the activities. The objectives can be


worded in either positive or negative fashion.

Software Testing Process


operationalise test objectivescont.

Automated
Test objectives should be translated into an appropriate

form for the automated test tool being used.


For example, when using SQA TeamTest Test Manager a

test requirements hierarchy would be created. Automated


test requirements would be stored in the tool's test
repository and would be used as the basis for constructing
automated test scripts.

Software Testing Process


Outputs
Test Objectives
The statement of the test objectives is really a statement of
the test requirements.
It can be created using any word processing package or

spread sheet. It can also be implemented with automated


testing tools such as SQA TeamTest.
In SQA's Manager product the test objects/requirements

are in put as a test requirements hierarchy and are stored in


the test repository. Each branch with in the requirements
tree can have sub-branches, and sub-branches can also have
sub-branches. SQA is only one example. Other automated
testing tools will have their own type of test
objectives/requirements documentation.

Software Testing Process


Objectives completion
The important consideration is that each requirement

and how it is validated is documented.


Test requirements are completely useless unless they can

be satisfied.
Important test metrics that should be calculated and

reported are the percentage of test requirements that have


be covered by test cases, and the percentage of test
requirements that have been successfully validated.
The statement of objective completion criteria does not

have to be a separate document.


Prioritize test objectives

Software Testing Process


Construct Test Plans
The purpose of the test plans is to specify WHO does

WHAT, and WHEN and WHY of the test design, test


construction, test execution, and test analysis process steps.
The test plan also describes the test environment and

required test resources.


It also provides measurable goals by which management

can gauge testing.


Furthermore, it facilitates communications within the

test team, between the test team and the development team,
and between the test team and management.

Software Testing Process


Construct Test Plans
The test plan is an operational document that is the basis

for testing. It describes test strategies and test cases.


Although it is operational in nature, it has administrative
aspects.
Thus, it can be used for both new development and

maintenance. It should also be considered an evolving


document.

Software Testing Process


Test plan development requires about a third of the entire

testing effort.
Test plans should be constructed from a standardized

template.
The template should follow an accepted test plan

standard.
It is also acceptable to combine pieces from any or the

entire outline to construct a hybrid test plan standard.


In addition, test plans should be designed with test

automation in mind.

Software Testing Process


Inputs
Requirements Document
Software Design Document
Risk Analysis Results
Prioritized test objectives

Tasks
Construction of Test Plans

Unit Test Plan


System Test Plan
Integration Test Plan
User Acceptance Test Plan

Software Testing Process


System Test Plan
Construct System Test
Identify the business scenarios to be tested.
The user will employ the application system to conduct

business day in and day out and according to daily, weekly,


monthly and/or yearly business cycles.
The task identifies the business processes that can be

translated into scripted test scenarios.


A system test scenario is a set of test scripts which reflect

users behaviors in a typical business situation.


For example, the user logs on to the system, views some

retail profile accounts, updates other retailer profiles, and


deletes still other retailer profiles

Software Testing Process


System Test Plancont.
Installation and checkout Test Plan
Release Test Plan

Integration Test Plan


Specifies the build process

Software Testing Process


Unit Test Plan

Unit Testing Phases


Test Planning
General Approach
Resources
Schedule
Features to Test
Develop the Test Set
Design the Tests
Implement the Test Plan
Execute the Tests
Run Test Procedures
Evaluate the Test Results

Software Testing Process


Unit Testing Activities
Plan the approach
determine the features to be tested
Define the tests
Design, Construct, execute the test
Evaluate the unit test effort

Software Testing Process


Design and construct Test cases
The purpose of this step is to apply test case design

techniques to design and build a set of "intelligent" test


data.
The data must address the system as completely as

possible, but it must also focus in on high-risk areas, and


system/data components where weaknesses are
traditionally found (system boundaries, input value
boundaries, output value boundaries, etc.).
The test data set will be a compromise of economics and
need. It is not economically feasible to test every possible
situation, so representative sampling of test conditions, etc.
will be present in the test data.

Software Testing Process


Inputs:
System Test Plan
Integration Test Plan
Unit Test Plan

Tasks
Specify the test case design strategies
black box, white box and other testing techniques

Software Testing Process


Design test cases
This task involves applying the test case design
techniques to identify test data values that will be
constructed.
The developers will be responsible for designing unit

testing test cases.


The test team will aid developers in use of the

techniques.
For integration, System and Regression testing the test

team will apply the techniques themselves.


The test case Description can be documented either

manually or stored in the test repository of an automated


testing tool suite.

Software Testing Process


Design test casescont.
If the test cases are documented automatically, the
format and content will be limited to what the input forms
and test repository can accept.
Each tool vendor will probably store a different set of

descriptive elements.
Whether manual or automated, the test case description

should minimally contain the elements illustrated in the


sample output document listed here.
The test data MUST include a description of the

expected behavior for each test case.

Software Testing Process


construct test data
construction of actual physical data.

construct test logs


separate test logs for unit testing, integration testing,
system testing and user acceptance testing

Quality review of test data


This task assures that the test data are complete,
correct, and consistent. It is a simple review process
that follows the Walkthrough format. The output
should be a list of corrections, modifications, and
additions that are necessary to strengthen the test data.

Software Testing Process

Execute Unit and Integration Testing


The purpose of unit testing is to prove that the software
functions as individual units to the level that each unit
does what it is intended to do.
The software developer who built the software unit

under test should conduct the unit test.


The testers should act as consultants to the developer

during unit testing.


The purpose of integration testing is to prove that the

software units work together properly.


It should prove that the integrated units do what they

are intended to do, and that the integrated units do not do


things they are not intended to do. The test team should
conduct the integration test.

Software
Testing
Process
Tasks - Approve test environment
The purpose of this task is to verify that the required test

environment (e.g. test lab, networked clients machines, etc.) is


in place before testing starts.
There are many type of test environments ranging from

very informal ones where testing is completed at


developer/tester workstations to very formal test laboratories
where software is tested under conditions approximating the
production milieu.
The formality of the test climate is a function of available

resources. Most test environments lie some in between formal


and informal.
What this means to the test team is that some resources will

be scarce and some will not be available.

Software Testing Process


Tasks
Approve test environmentcont.
Some classes of tests may have to be omitted.
It is important that the testing manager along with the

test team members inform the development team and their


management of any shortcomings that will affect testing.
A formal statement of test environment/resource

deficiencies should be written and all responsible parties


must signoff on the list.

Software Testing Process


Approve test resources
The purpose of this task is to review and verify that All the

required resources have been allocated and are available


before testing begins. The resources can include people,
funding, time, software tools, and the test environment.
The required test resources should be identified and put in

a written statement that will be distributed to development


management.
Both the development manager and the testing manager

should review the resources.


The test team must further review any changes that are

requested.

Software Testing Process


Approve test resourcescont.
When consensus has been achieved, all involved parties

should signoff on the list of required resources.


It is important to identify all of the required testing

resources before testing begins however, that is not always


possible.
At any time when identified test resources will be scarce or

some will not be available, it is the test teams responsibility


to make the testing manager aware of the consequences. The
testing manager must either find the resources or make
development managers aware of the problem and it possible
consequences.

Software Testing Process


Approve test resourcescont.
Deficiencies in the test resources may ultimately affect

the implementation of the test plans.


Some classes of tests may have to be omitted.
It is important that the testing manager along with the

test team members inform the development team and


their management of any missing resources that will
affect testing.
A formal statement of test resource deficiencies should

be written and all responsible parties must signoff on the


list.

Software Testing Process


Execute unit tests
This task is the responsibility of each developer. The tests

should be conducted so that the developer is able to certify


that his/her software does what it is supposed to do. Test
team members will act as consultants to developers during
unit test execution.

Software Testing Process


Retest problem areas
This task is usually done informally by the software

developer without a lot of supervision.


It can be improved considerable if the developers can be

influenced to use an automated defect-tracking tool. Using


a tool such as SQA TeamTest Test Manager product helps
management track and control unit testing, as well as,
track the types of problems that occur.
Getting developers to agree to use an automated defect-

tracking tool is not an easy task. It can be done.

Software Testing Process


Retest problem areascont.
It requires support from the project team lead and from

the project manager. It also requires re-assurance that the


defects entered will not be used against the programmers
for adverse purposes. When buy-in has been accomplished,
the results are excellent. Developers ultimately see the
value of the product and how it can help them organize
their own work.
This task is cyclic in nature. Re-testing will continue until

a pre-specified stopping criterion (criteria) is (are) met. For


example, re-testing could continue until all severity 1,2, & 3
errors have been corrected. It could also be a function of
the time allocated to re-testing

Software Testing Process


Retest problem areascont.
Re-testing problems found during unit testing is the
responsibility of the developer. The test team will aid
developers during unit testing to retest executable files
when necessary.

Software Testing Process


Analyze and approve unit test results
The purpose of this task is to determine which test cases

failed and which passed, to identify which failures should


be entered into the defect database, and to provide weekly
reports for defect tracking purposes.
A defect and a failure are two different things. There are

many definitions of the term "defect." Normally, it is


thought of as a discrepancy of the observed from the
expected. In software a defect is when the observed output
is different than the expected output. This is an
oversimplification of the word but, it is enough for our
purposes.

Software Testing Process


Analyze and approve unit test resultscont.
A failure results when the software does not perform. A

defect may or may not cause a software failure. It may


cause some output to be incorrect while producing other
correct output.
It is the responsibility of the Project-Level Configuration

Control Board to determine which problems are defects


and which problems are failures. It is also the CCB's
responsibility to assign a severity level to each defect and
to set repair priorities.

Software Testing Process


Execute integration tests
This task is the responsibility of the test team.
Its focus is to prove that the integrated software units do

what they should do, and do not do what they should not
do.
This test is conducted in a formal manner.
The testers use integration test cases that have predicted

outputs.
The test results are recorded in structured test logs.
The structured test logs and test scripts drive the

integration testing process.

Software Testing Process


Retest problem areas
This task is cyclic in nature. Retesting will continue until

a pre-specified stopping criterion (criteria) is (are) met.


For example, retesting could continue until all severity
1,2, & 3 errors have been corrected. It could also be a
function of the time allocated to retesting.
Problem reports drive the retesting task. The test team

will retest only CCB approved and corrected problems


that are received in the form of legitimate software builds.

Software Testing Process


Analyze and approve integration test results
The purpose of this task is to determine which test cases

failed and which passed, to identify which failures should


be entered into the defect database, and to provide weekly
reports for defect tracking purposes.
Outputs:
Unit Test log
Integration Test log

Software Testing Process


Execute System Test
The purpose of the system test is to use the system in a
"controlled" test environment, but to do so as the user
would use the system in the production environment.
The system test should prove that the complete system

will do what it is supposed to do, and that it will not do


anything that it is not supposed to do.

Software Testing Process


Tasks
Approve System Test Environment
Approve Test resources
System Tests
Retest problem areas
Analyze system test results

Software Testing Process


Tasks
Approve System Test Environment
The purpose of this task is to verify that the required test

environment (e.g. test lab, networked clients machines,


etc.) is in place before testing starts.
There are many type of test environments ranging from

very informal ones where testing is completed at


developer/tester workstations to very formal test
laboratories where software is tested under conditions
approximating the production milieu. The formality of the
test climate is a function of available resources. Most test
environments lie some in between formal and informal.

Software Testing Process


Approve System Test Environmentcont.
What this means to the test team is that some resources

will be scarce and some will not be available.


Deficiencies in the test environment will ultimately affect

the implementation of the test plans.


Some classes of tests may have to be omitted.
It is important that the testing manager along with the

test team members inform the development team and their


management of any shortcomings that will affect testing.
A formal statement of test environment/resource

deficiencies should be written and all responsible parties


must signoff on the list.

Software Testing Process


Approve Test resources
The purpose of this task is to review and verify that All

the required resources have been allocated and are


available before testing begins.
The resources can include people, funding, time, software

tools, and the test environment.


The required test resources should be identified and put

in a written statement that will be distributed to


development management.

Software Testing Process


Approve Test resourcescont.
Both the development manager and the testing manager

should review the resources.


The test team must further review any changes that are

requested. When consensus has been achieved, all involved


parties should signoff on the list of required resources.
It is important to identify all of the required testing

resources before testing begins however, that is not always


possible.
At any time when identified test resources will be scarce

or some will not be available, it is the test teams


responsibility to make the testing manager aware of the
consequences.

Software Testing Process


Approval of test resourcescont.
The testing manager must either find the resources or

make development managers aware of the problem and it


possible consequences.
Deficiencies in the test resources may ultimately affect

the implementation of the test plans.


Some classes of tests may have to be omitted.
It is important that the testing manager along with the

test team members inform the development team and their


management of any missing resources that will affect
testing.
A formal statement of test resource deficiencies should be

written and all responsible parties must signoff on the list.

Software Testing Process


System Tests
This task is the responsibility of the test team.
It focus is to prove that the completed system does what it

should do, and does not do what it should not do.


This test is conducted in a formal manner. The testers use

scenario-based system test scripts that have predicted


outputs.
The test results are recorded in structured test logs.
The structured test logs and test scripts drive the system

testing process.

Software Testing Process


For mainframe projects, System Testing is carried out

during the formal Testing phase of the SDLC. As far as


testing is concerned, this stage consumes the largest chunk
of testing resources.
System Testing Activities are controlled by the System

Test Plan that was developed much earlier during the


SDLC in the System Design phase, but is now implemented.
Purpose of system testing
System testing activities are intended to prove that the

system meets it objectives.

Software Testing Process


Some experts argue that the purpose of System Testing is

to prove that the system meets its requirements.


This is not entirely true unless you consider Acceptance

Testing as a type of System Testing because the purpose of


Acceptance Testing is to demonstrate that the system meets
the user's requirements.
Acceptance Testing is a validation process. System

Testing, in the strictest sense, is a verification process.


Regardless of whether it represents verification or
validation, System Testing represents an "external" view of
the system.

Software Testing Process


Types of System Test
For clarity in our discourse on System Testing, we will

define and discuss THREE types of System Testing one of


which will incorporate what is known as Acceptance
Testing. They are System Verification Testing, Customer
Verification Testing, and Customer Validation Testing.
The first TWO kinds of System Tests are designed to

verify that the system does meet its design objectives.


They are destructive in nature and intended to find areas

where the system does not accomplish its objectives so that


corrections can be made.
The third type is designed to validate the system and is

intended to be a positive (confidence building) experience


demonstrating how the system fulfills its requirements.

Software Testing Process


The key words here are "verify" and "validate." Testing

is a verification process when it occurs in a non-live test


environment using non-live test data. This is exactly what
happens when we do what we commonly call System
Testing.
A test team consisting of member of the development

group, system operations staff, quality analysts, auditors,


and end-user representatives is at the helm during the test.
The project team leader directs this test.
The test is actually conducted by the IS staff with input

from the quality analysts, users, etc. who are present. This
is more properly termed System Verification Testing.

Software Testing Process


Another instance of testing as a verification procedure

involves repeating the previous test with the users


conducting it.
The test, as was the one before, is executed in a simulated

non-production environment, hence, the name Customer


Verification Testing.
In fact, this test is conducted in the same environment as

the previous system test, detail for detail.


The same typical processing day is used together with

the previously used scripts. In this case, the IS staff acts in


an advisory capacity.

Software Testing Process


Validation means that something actually works as it was

intended to work. If this is so, then the product being tested


meets its requirements. The purpose of Customer
Validation Testing is to demonstrate that the system works.
The only way to prove that a product functions

correctly is to use it in the real world on real data.


The common thread among the three kinds of System

Tests is that they are formally implemented. "Formal"


means according to a written plan. A major criticism of
System Testing in general is that it is frequently done in an
informal manner.

Software Testing Process


A System Test must be comprised of scripts intended to

thoroughly exercise each one. Furthermore, the scripts


must be "destructive." They must include attempts to
make the system do things it is not supposed to do.
Establishing and Documenting the Expected Results
System test scripts are not complete unless each includes

the expected result(s). In many situations, however, the


results may vary from day to day, week to week, month to
month, etc. When this is the circumstance, the result
associated with a particular script will vary depending on
the values stored in the data base from one update cycle to
another.

Software Testing Process


Hard coding the expected result would mean that the test

script must be changed each time the database changes.


This causes a test script maintenance nightmare.
The best way to handle this problem is to have the system

testers do dynamic database queries while conducting the


system test. The database query returns the database
record that is the basis of the result on the screen. Thus,
what is displayed becomes what is expected based on the
record in the database.
The limitation on validating a test script this way is that

the tester can only say that the displayed results are correct
given the current state of the database. This sheds no light
on whether or not the data itself is correct.

Software Testing Process


The validation of the database will have to be completed

by seeding the data base loads/updates with known values


that should appear in the database.
System testing and automation tools
The ultimate use of automated testing tools would be a

completely automated and unattended system test.


This, however, is not yet feasible.
In fact, system testing requires a tremendous amount of

manual labor, even if you use an automated testing tool.


Automated test scripts cannot emulate the spontaneity

of users.

Software Testing Process


System testing and automation toolscont.
The paradoxical nature automated test scripts is that

they cannot be used for verification unless the system is


working correctly when you record the scripts.
The tester firsts executes different system features while

recording and inserting test cases.


The completed scripts are played back to very the system

functions.
It after verification that the scripts can be replayed to

test regression test the system. So, System test cases must
be manually written and executed the first time around.

Software Testing Process


Retest problem areas
This task is cyclic in nature. Re-testing will continue

until a pre-specified stopping criterion (criteria) is (are)


met. For example, re-testing could continue until all
severity 1,2, & 3 errors have been corrected. It could also
be a function of the time allocated to re-testing.
Problem reports drive the re-testing task. The test team

should retest only CCB approved and corrected problems


that are received in the form of legitimate software
builds.

Software Testing Process


Analyze system test results
The purpose of this task is to determine which test cases

failed and which passed, to identify which failures should


be entered into the defect database, and to provide
weekly reports for defect tracking purposes.

Software Testing Process


Design and automate regression test suites
This task identifies how much, and what areas, of the test

data should be saved for regression testing. The decision


should be based on the system requirements, the risk
analysis results, and the problems encountered during the
unit, integration, and system tests.

Output
System test log

Software Testing Process


Analyze and Report Test results
The purpose of the test report is to indicate which system

functions work and which do not. This report should


describe the level to which the system meets the test
objectives. The report should include recommendations
based on the success or failure of the system to meet the
objectives.
This report is a major report that covers all of the testing

activities that have been completed. The audience for this


report is management (Project Sponsor, Project Manager,
Development Manager, and User Representative).

Software Testing Process


Tasks
Test data analysis
Formulate test findings report
Construct test findings report
Review test findings report

Software Testing Process

Thank You