HVAC

Water Cooled Screw Chiller


Approx-300Tr AC-2 Nox150Tr

Advantages and suitability.


Electrical Consumption : 0.85 KW /
TR / (1.2)

Can run upto minimum 10% Capacity

Life 25-30 years / 10-15yrs

Balancing Valve thermostat in rooms

No derating

Cost higher

Plant Room 1000Sqft

CAPABILITIES
AIRCONDITIONING
VENTILATION
CONTROL

CCTV
SURVELILLANCE

PUBLIC
ADDRESS
SYSTEM

ACCESS CONTROL

IBMS

ENERGY
MANAGEMENT
S/STN
DG SETS

WATER RESOURCE
MANAGEMENT
BOARD ROOM
CONFERENCE
HALL
MANAGEMENT

FIRE AND
LIFE SAFETY

LIFTS
MONITORING

LIGHTING
CONTROL

BENEFITS

MANAGE BUILDING PROCESSES


EFFICIENTLY
REDUCE ENERGY AND OPERATING COSTS
PROTECT ASSETS FROM THEFT AND
VANDALISM
PROVIDE LIFE SAFETY MEASURES
IMPROVE PRODUCTIVITY

Power Distribution System


11KV/.433 HT Substation shall be mandatory for this
project as total connected load shall exceed 100KW in
Torrent Powers Jurisdiction.
Four Room Substation may be required by Torrent
Power as per its current practice.
Substation should be accessible for Torrent Power for O
& M point of view.

Power Distribution System


On each floor, Electrical Rooms for floor wise power
distribution shall be required.
Main LT Panel shall be provided at Ground Floor and
other Floor Panels shall be housed near Load Centre.
Capacitor Panel near Main LT Panel or on each Floor
near Load Centre.
Service Ducts at suitable locations for Power, Voice,
Data and Signal Cables shall be provided.
Lightening Protection System.
Earthing Pits as required for Medium Voltage and Low
Voltage Systems.

Emergency / Backup Power


Distribution System
It is proposed to provide silent DG Set for the selected
load.
Control Panels shall be provided accordingly for floor
wise power distribution.
Separate power for Comfort AC Load shall also be
planned accordingly.
Lighting and Power Distribution Boards can be localized.

Emergency / Backup Power


Distribution System
It is proposed to provide UPS backed up by DG
set for the supercritical and critical load.
UPS Power Distribution Boards shall be
provided accordingly for floor wise power
distribution.
Emergency Lighting, Computer Network, Server
Room, Security Systems, Telecommunication
System, Building Management System ( BMS )
etc. shall be backed up by UPS and shall be
configured accordingly.

Electronic Security and


Telecommunication Systems

Integrated Building Management System ( IBMS ).


Analog Addressable Fire Detection and Alarm System.
Access Control System.
CCTV System.
Biometric Access Control System for some specific areas such as
Server Room, Record Room , High Security Zone etc.
Gas Suppression System for Server Room as required.
Digital EPABX System

Audio-Video Systems
Conference Room Audio-Conferencing System
High Resolution Video Projectors in Conference and Meeting
Rooms
Multipoint Video Conferencing System in Conference Room
Public Address and Background Music System
Separate Music System for Cafeteria.
LCD Screens and Touch Screens as required in Reception Area and
Foyer Area.
High Resolution DLP Video Projectors for Court Room / Auditorium
and Seminar Room for presentation etc.

Lighting

Harnessing daylight as far as possible.


Lighting Levels as per the Green Building Norms / Requirements.
Use of Occupancy Detectors.
Sensor based Interior and Exterior Lighting.
Area Lighting and Pathway Lighting.
Building Flood Lighting and Landscape Lighting.
Use of LEDs in circulation and movement areas to the extent
possible.
Special Digital Lighting Systems for Conference Rooms / Seminar
Room / Court Room.
Special Dimmable Stage Lighting System for Auditorium.

Computer Networking and


IT Installations
Provision of a Server Room.
Provision for N+1 Nodes for Desktops and Laptops.
Provision for Computer Nodes in the Conference Room / Seminar
Room and Court Room.
Voice and Data Connectivity using CAT-6 Cables if agreed by GERC
IT Managers.
Provision for Printers, Copier Machines, Plotters, Scanners etc.
individually as in a common Business Room as desired by GERC
Authority.