You are on page 1of 15

TOP TERMINAL BATTERY CABINET

4/07/15

Typical Battery Cabinet Design Issues by Design

This height mismatch can cost


$1000s in
Electricians cost for conduit
installation.
UPS

Battery
Cabinet

Battery
Cabinet

Battery
Cabinet

2M

Hidden costs of installation can be avoided with the proper height equipment.

Typical Battery Cabinet Design Issues by Design

Full UPS Systems


Monitoring

UPS

Typically, No individual battery preemptive failure


monitoring

Battery
Cabinet

Battery
Cabinet

Battery
Cabinet

2M

Extending battery life by 20% - 35% saves big in recurring battery costs

Typical Battery Cabinet Design Issues by Design

Full UPS Cooling


Systems

UPS

Typical cool down 10 - 12 hours after deep


discharge event.

Battery
Cabinet

Battery
Cabinet

Battery
Cabinet

2M

sulfating can be greatly reduced & longevity increased by increasing cool down

Typical Battery Cabinet Design Issues by Design

Full UPS Cooling


Systems

UPS

Intelligent monitoring of Individual


batteries with integrated controller
which reports to UPS System

Battery
Cabinet

Battery
Cabinet

Battery
Cabinet

2M

Fully integrated systems ensure UPTIME and reduce system power failures.

Evaluating Total Systems Approach

UPS Systems are not Complete


Systems as many do not include the
battery monitoring.
The Following pages Address an
Alternate Systems Design Approach
Other Battery Cabinet Enhancements
are also addressed

Cabinet Target Objectives

INDUSTRY FIRSTS
1. First Top Terminal Battery cabinet to meet the 2 Meter
requirement to match UPS Heights. NOTE: Many UPS
systems are 2 Meters Tall.
2. First tube frame welded battery cabinet with no sharp
edges or
corners.
3. First battery cabinet to be lifted from top. (Using Load
spreaders).
4. CFD engineered cool down of 1.5 hours after major
discharge event
of 30 minutes or more.
5. First cabinet to use laminated bus bars to simplify tier
to tier cabling.
6. First cabinet to use best in class 4/0 ~6,000 strand
cables with fusion
lugs. Best Flexure, Lowest IR Drop in the industry.
7. Highest repeatable tolerance cabinet in the industry
using
engineered weldment fixtures.
8. Achieved $2,200 per Cabinet Price Objective in
Quantity.
9. Preemptive battery failure monitoring.

4/07/15

Cabinet at a Glance
45

32.7

TT Battery Range
40 Battery String

VRLA 350 A - 540 A


High Line - 550 Vdc
192.5 KVA 297 KVA
Low Line - 420 Vdc
147 KVA 226.8 KVA

78.7

TT Cabinet
1,100 lbs - Cabinet
4,500 lbs - Batteries
5,600 lbs - Max Weight

4/07/15

Cable Pass Through

Cable Pass through.

4/07/15

Breaker Mfgr

To meet the 2 Meter


height
Objective this cabinet is
a
Siemens Breaker only
cabinet. (600A or less).
No breaker handle is
required.

4/07/15

Optional Fan Assembly

Optional Bolt on Fan Bracket.

4/07/15

Top Lift Using Load Spreader Bars

15,000 lb Eyebolts for top lift


using load spreader bars.

4/07/15

Bus Bar

Double Insulated
Tier to Tier Bus Bar.
Removes
approximately
15 ft. of 4/0 cable.

4/07/15

Spacers & Shims for Unique Battery Size

4/07/15

End Page

Thank you !

You might also like