PRENSENTED
BY
SWAI SINGH
ON
RGTPP
INTRODUCTION OF
RAMGAR GAS
H
THERMAL
POWE PLANT
35.5 MW]
SECOND STAGE
IN THIS STAGE ONE GAS TURBINE [GT-2 37.5 MW] STARTING
ON 07.08.2002 AND ONE STEAM TURBINE [STG-1 37.5 MW]
STARTING ON 25.04.2003
THIRD STAGE
IN THIS STAGE ONE GAS TURBINE [GT-3 110 MW] STARTING
ON 20.03.2013 AND ONE STEAM TURBINE [STG-2 50 MW]
STARTING ON 05.04.2014
POWER PLANT
CYCLE
ROTATED
ON
Brayton cycle
Rankine cycle
GAS
TURBINE
1. COMPRESSOR
The atmosphere air is compressed to the 17 stage
compressor and before it passes through the filter .
The compressor ratio is 10 and this is routed to the
combustors .
2. COMBUSTORS
3. TRANSITION PIECES
The hot gases from the combustion chambers expand
into the ten separate transition pieces and from
there to the three stage turbine section of the
machine.
4. TURBINE
5. EXHAUST
EXHAUST
After passing through the third stage
buckets , the gases are directed into the
exhaust hood diffuser which contains a series
of turning vanes to turn the gases from an
axial direction , thereby minimizing exhaust
hood losses. The gases then pass into the
exhaust plenum and are introduced to
atmosphere through the exhaust stack or to
the HRSG .
STEAM
TURBINE
STEAM TURBINE
Super heater ,
CPH ,
Stack (height) .
CONCLUSION
After analyzing the RGTPP 270.50 MW combined
cycle power plant, we can describe that this power
plant is a very efficient one as compared to other
power plants in its series.
Also, we would like to add up that it is very
compact in size, less pollutive to nature, easily
controlled & decent power plant that we had ever
seen.
We really had nice time here & got a treasure of
practical knowledge from the RGTPP employees. In
future we are sure that this vocational training in
RGTPP is going to help us in our rest of the studies.