eNB HW upgrade scenario

Samsung Electronics. All Rights Reserved. Confidential and Proprietary.

Deployment of Scenario & Scope of work


Current
Existing
2T2R
Antenna

2.3GHz
2T2R RU

Scenario 1

2.3G Interleaving

Scenario 2
2.6G Overlay

Disman
tle
2T2R
Antenn
a

Existing
2T2R
Antenna

2.6GHz
4T4R
RU

2.3GHz
2T2R
RU

2.3GHz
2T2R
RU

Add RRU

Replace RU

WiMAX

LTE
WiMAX Add CDU

New
6T6R
Antenn
a

WiMAX

LTE

Add CDU

Scenario 3

2.3G Interleaving
+ 2.6G Overlay
Disman
tle
2T2R
Antenn
a

New
6T6R
Antenn
a

Scenario 4

2.6G New Installation


New
4T4R
Antenn
a

2.6GHz
4T4R
RU

2.6GHz
4T4R
RU

2.3GHz
2T2R
RU

Add RRU
Replace RU

LTE
WiMAX Add CDU

New RRU

LTE

New CDU

Site rate will be modified


*(Existing/N
ew)

Site rate :
41%
*(1936/113)

Site rate : 4%
*(185/0)

Scope

Scope

Site rate :
43%
*(1896/278)

Scope

Site rate :
12%
*(554/38)

Scope

Antenna

Antenna

New(Replace)

Antenna

New(Replace)

Antenna

New

RRU

Replace

RRU

Add

RRU

New(Replace)

RRU

New

CDU

Add

CDU

Add

CDU

Add

CDU

New

Cables

Cables

Add

Cables

Add

Cables

New

Samsung Electronics. All Rights Reserved. Confidential and Proprietary.

Scenario-1 : 2.3G RRH interleaving for F-RAS


F-RAS Interleaving Cable Diagram
Line

Line Description
(Hidden : Re-Use)
Data Cable

GPS
Antenna
Existing
2T2R
Antenna

DC Power Cable
Hidden Line : Re-Use Cable
CPRI Cable
GPS / RF Cable

RF Jumper
Cable

Outdoor
Existing Cable
Cabinet
(Flexible DU)

RRH
Replac
e
OFD/DC Power
Cable
OFD/DC BOX

Existing OFD/DC Power


Cable

Reuse
New
Reuse
Rectifier
Reuse
Rack

Interleaving Procedure for


F-RAS
Classificatio

Installation Procedure

n
DU Installation

Insert LTE DU in existing Cabinet

GPS Installation

Install GPS Splitter(2way) in existing Cabinet


GPS Cabling

DU Cabling

Data Cabling from DU to Backhaul


DC Power Cabling from DU to Rectifier
Ground Cabling from DU to TGB

RRH
Replacement

Detach existing RRH using rope temporarily


Install New 2T2R RRH to existing location
(A Filter is changed)
Turn off existing RRH
Cut over 1/2" Jumper from existing RRH to New
RRH
Cut over CPRI from existing RRH to New RRH
Cut over Power cable from existing RRH to New
RRH
Turn on New RRH
Cut over Ground cable from existing RRH to
New RRH
Dismantle existing RRH

Wrap up

RRH Cables Waterproofing


Site Cleanliness

Reuse
Existing
Rectifier

Backhaul
Switch

FDU CDU

GPS
Splitt
er

Re-use of existing materials


- GPS cable extension through the Splitter.
- Reuse materials : CPRI / Power / Ground / Antenna / RF
Cable
New Installation materials for CDU
- Data Cable / New CDU Power / Ground Cable / GPS Splitter

Downtime: Rooftop 22min / Tower


27min
per sector

Samsung Electronics. All Rights Reserved. Confidential and Proprietary.

Scenario-1 : 2.3G RRH interleaving for S-RAS


S-RAS Interleaving Cable Diagram
Line

Line Description
(Hidden : Re-Use)
Data Cable

Reuse
New

GPS Antenna

DC Power Cable
Existing
2T2R
Antenna

Hidden Line : Re-Use Cable


CPRI Cable
GPS / RF Cable

RF Jumper
Cable

Existing Cable

Reuse
Rectifier
Reuse

Interleaving Procedure for


S-RAS
Classificatio

Installation Procedure

n
DU Installation

Insert LTE DU in existing rectifier rack

GPS Installation

Install GPS Splitter(2way) in existing rectifier


rack and GPS cabling to SDU

DU Cabling

Data Cabling from DU to Backhaul


DC Power Cabling from DU to Rectifier
Ground Cabling from DU to TGB

RRH
Replacement

Detach existing RRH using rope temporarily


Install New 2T2R RRH to existing location
(A Filter is changed)
Turn off existing RRH
Cut over 1/2" Jumper from existing RRH to New
RRH
Cut over CPRI from existing RRH to New RRH
Cut over Power cable from existing RRH to New
RRH
Turn on New RRH
Cut over Ground cable from existing RRH to
New RRH
Dismantle existing RRH

Wrap up

RRH Cables Waterproofing


Site Cleanliness

Reuse
CD
U
GPS
Splitter
B/H Switch

SDU
RRH
Repla
ce

Harting
Connector

Existing CPRI / Power Cable

Add GPS Cable

Re-use of existing materials


- GPS cable extension through the Splitter.
- CPRI Cable extension through the Harting Adaptor.
- Reuse materials : Power/Ground/Antenna/RF Cable
New Installation materials for CDU
- Data Cable / Ground / Power Cable, GPS Cable(SDU~GPS
Splitter)
- GPS Splitter / Harting Adaptor (Harting to Harting)

Downtime: Rooftop 22min / Tower


27min
per sector

Samsung Electronics. All Rights Reserved. Confidential and Proprietary.

Scenario-2 : 2.6G Overlay for F-RAS


F-RAS 2.6G Overlay Cable Diagram
Line

Line Description
(Hidden : Re-Use)
Data Cable

Reuse
New

New
6T6R
Antenna

RF Jumper
Cable(4Line)
RRH(4T4
R)
New
Install

Hidden Line : Re-Use Cable


CPRI Cable
Dismantle
2T2R
Antenna

Replace
RF Jumper
Cable

GPS / RF Cable
Outdoor
Existing Cable
Cabinet
(Flexible DU)

RRH
(WiMA
X)
Existing
OFD/DC Power
Cable

Insert LTE DU in existing Cabinet

Reuse

GPS Installation

Install GPS Splitter(2way) in existing Cabinet


GPS Cabling

Rectifier
Reuse
Rack

DU Cabling

Data Cabling from DU to Backhaul


DC Power Cabling from DU to Rectifier
Ground Cabling from DU to TGB

Reuse
Existing
Rectifier

RRH Installation
Backhaul
Switch

Antenna
Replacement

Wrap up

RRH Cables Waterproofing


Site Cleanliness

GPS
Splitter

Re-use of existing materials


- Reuse to all existing materials for WiMAX.
- Dismantle to existing 2T2R Antenna.
New Installation materials for CDU & 4T4R RRU
- Data Cable / Power / Ground / GPS Splitter / CPRI / Antenna
/ RF Cable

Install New 4T4R RRH including Bracket


Power Cabling from New 4T4R RRH to Rectifier
Ground Cabling from New 4T4R RRH to TGB
CPRI Cabling from New 4T4R RRH to LTE DU
Turn on New 4T4R RRH
Dismantle existing Antenna
Install 6T6R Antenna
1/2" Jumper Cabling from New 4T4R RRH to
6T6R Ant.
Cut over 1/2" Jumper from 2T2R Antenna to
6T6R Ant.
RET Cabling from New 4T4R RRH to 6T6R
Antenna
Install 6T6R Antenna

FDU CDU

OFD/DC BOX
Existing OFD/DC Power
Cable

Installation Procedure

n
DU Installation

GPS
Antenna

DC Power Cable

2.6G Overlay Procedure for


F-RAS
Classificatio

Downtime: Rooftop 45min / Tower


70min
per sector

Samsung Electronics. All Rights Reserved. Confidential and Proprietary.

Scenario-2 : 2.6G Overlay for S-RAS


F-RAS 2.6G Overlay Cable Diagram
Line

Line Description
(Hidden : Re-Use)
Data Cable

Reuse
New

2.6G Overlay Procedure for


S-RAS
Classificatio
Installation Procedure

n
DU Installation

Insert LTE DU in existing rectifier rack

GPS Installation

Install GPS Splitter(2way) in existing rectifier


rack and GPS cabling to SDU

DU Cabling

Data Cabling from DU to Backhaul


DC Power Cabling from DU to Rectifier
Ground Cabling from DU to TGB

GPS Antenna

DC Power Cable
New
6T6R
Antenn
a

Hidden Line : Re-Use Cable


CPRI Cable
Dismantle
2T2R
Antenna

GPS / RF Cable
Existing Cable

RF
Jumper
Cable
RRH(4T
4R)
New
Install

Replace
RF Jumper
Cable

Reuse
Rectifier
Reuse
Rack
Existing
Reuse
Rectifier
CD
U
GPS
Splitter

RRH Installation

B/H Switch

SDU

RRH
(WiMAX
)

Existing CPRI / Power Cable

GPS
Splitter

Add GPS
Cabling

Re-use of existing materials


- Reuse to all existing materials for WiMAX.
- Dismantle to existing 2T2R Antenna.
New Installation materials for CDU & 4T4R RRU
- Data Cable / Power / Ground / GPS Splitter / CPRI / Antenna
/ RF Cable

Install New 4T4R RRH including Bracket


Power Cabling from New 4T4R RRH to Rectifier
Ground Cabling from New 4T4R RRH to TGB
CPRI Cabling from New 4T4R RRH to LTE DU
Turn on New 4T4R RRH

Antenna
Replacement

Dismantle existing Antenna


Install 6T6R Antenna
1/2" Jumper Cabling from New 4T4R RRH to
6T6R Ant.
Cut over 1/2" Jumper from 2T2R Antenna to
6T6R Ant.
RET Cabling from New 4T4R RRH to 6T6R
Antenna
Install 6T6R Antenna

Wrap up

RRH Cables Waterproofing


Site Cleanliness

Downtime: Rooftop 45min / Tower


70min
per sector

Samsung Electronics. All Rights Reserved. Confidential and Proprietary.

Scenario-3 : 2.3G Interleaving + 2.6G Overlay for F-RAS

F-RAS Interleaving & Overlay Cable Diagram


Line

Line Description
(Hidden : Re-Use)
Data Cable

Reuse
New

GPS
Antenna

DC Power Cable
New
6T6R
Antenna

RF Jumper
Cable(4Line)
RRH(4T4
R)
New
Install

Hidden Line : Re-Use Cable


CPRI Cable
Dismantle
2T2R
Antenna

Replace
RF Jumper
Cable

GPS / RF Cable
Outdoor
Existing Cable
Cabinet
(Flexible DU)

RRH
Repla
ce
Existing
OFD/DC Power
Cable

n
DU Installation

Reuse

GPS Installation

Rectifier
Reuse
Rack

DU Cabling

Installation Procedure

Insert LTE DU in existing Cabinet


Install GPS Splitter(2way) in existing Cabinet
GPS Cabling
Data Cabling from DU to Backhaul
DC Power Cabling from DU to Rectifier
Install New 4T4R RRH including Bracket
Power Cabling from New 4T4R RRH to Rectifier
CPRI Cabling from New 4T4R RRH to LTE DU
Turn on New 4T4R RRH
Detach existing RRH using rope temporarily
Install New 2T2R RRH to existing location(A

Reuse
Existing
Rectifier

Backhaul
Switch

Filter is changed)
FDU CDU

OFD/DC BOX
Existing OFD/DC Power
Cable

Interleaving & Overlay


ClassificatioProcedure for F-RAS

GPS
Splitter

Re-use of existing materials


- CPRI / Power / Ground / GPS / RF Cable
New Installation materials for CDU & 4T4R RRU
- Data Cable / Power / Ground / GPS Splitter / CPRI / Antenna
/ RF Cable

RRH Installation
& Replacement

Turn off existing RRH


Cut over 1/2" Jumper from existing RRH to
New RRH
Cut over CPRI from existing RRH to New RRH
Cut over Power cable from existing RRH to
New RRH
Turn on New RRH
Cut over Ground cable from existing RRH to
New RRH
Dismantle existing RRH

Dismantle existing Antenna and Install 6T6R


Antenna
1/2" Jumper Rooftop
Cabling from67min
New 4T4R/ RRH
to
Downtime:
Tower
6T6R Ant.
Antenna
97min
Cut over 1/2" Jumper from 2T2R Antenna to
Replacement
per sector
6T6R Ant.
RET
Cabling
from
New
4T4R
RRH
to 6T6R
Samsung Electronics. All Rights Reserved. Confidential and Proprietary.

Scenario-3 : 2.3G Interleaving + 2.6G Overlay for S-RAS

S-RAS Interleaving & Overlay Cable Diagram


Line

Line Description
(Hidden : Re-Use)
Data Cable

Reuse
New

Interleaving & Overlay


ClassificatioProcedure for S-RAS
n
DU Installation

GPS Antenna

DC Power Cable
New
6T6R
Antenn
a

Hidden Line : Re-Use Cable


CPRI Cable
Dismantle
2T2R
Antenna

GPS / RF Cable
Existing Cable

RF
Jumper
Cable
RRH(4T
4R)
New
Install

Replace
RF Jumper
Cable

Reuse

GPS Installation

Rectifier
Reuse
Rack

DU Cabling

Existing CPRI / Power Cable

GPS
Splitter
B/H Switch

SDU

Re-use of existing materials


- CPRI / Power / Ground / GPS / RF Cable
New Installation materials for CDU & 4T4R RRU
- Data Cable / Power / Ground / GPS Splitter / CPRI / Antenna
/ RF Cable

Install GPS Splitter(2way) in existing rectifier


rack
Data Cabling from DU to Backhaul
DC Power Cabling from DU to Rectifier

Filter is changed)

RRH Installation
& Replacement
Add GPS
Cabling

Insert LTE DU in existing rectifier rack

Install New 4T4R RRH including Bracket


Power Cabling from New 4T4R RRH to Rectifier
CPRI Cabling from New 4T4R RRH to LTE DU
Turn on New 4T4R RRH
Detach existing RRH using rope temporarily
Install New 2T2R RRH to existing location(A

Existing
Reuse
Rectifier
CD
U

RRH
Repla
ce

Installation Procedure

Turn off existing RRH


Cut over 1/2" Jumper from existing RRH to
New RRH
Cut over CPRI from existing RRH to New RRH
Cut over Power cable from existing RRH to
New RRH
Turn on New RRH
Cut over Ground cable from existing RRH to
New RRH
Dismantle existing RRH

Dismantle existing Antenna and Install 6T6R


Antenna
1/2" Jumper Rooftop
Cabling from67min
New 4T4R/ RRH
to
Downtime:
Tower
6T6R Ant.
Antenna
97min
Cut over 1/2" Jumper from 2T2R Antenna to
Replacement
per sector
6T6R Ant.
RET
Cabling
from
New
4T4R
RRH
to 6T6R
Samsung Electronics. All Rights Reserved. Confidential and Proprietary.

Scenario-4 : 2.6G RRH New Installation


2.6G New Installation Cable Diagram
Line

GPS Antenna

New
4T4R
Antenna

Line Description
(Hidden : ReUse)

New

DC Power Cable

New

CPRI Cable

New

GPS / RF Cable

New

RF Jumper
Cable

Reuse

Data Cable

2.6G New Installation


Procedure
Classificatio

New
Rectifier

DU Installation

Insert LTE DU in New Rectifier rack

GPS Installation

Install GPS Antenna and GPS Cabling

DU Cabling

Data Cabling from DU to Backhaul


DC Power Cabling from DU to Rectifier
Ground Cabling from DU to TGB

CD
U
Backhaul
Switch

RRH Installation

RRH(4T4
R)
New
Install
New CPRI / Power Cable / GPS
Cable

Installation Procedure

Install New 4T4R RRH including Bracket


Power Cabling from New 4T4R RRH to Rectifier
Ground Cabling from New 4T4R RRH to TGB
CPRI Cabling from New 4T4R RRH to LTE DU
Turn on New 4T4R RRH

Antenna

Install 6T6R Antenna


1/2" Jumper Cabling from New 4T4R RRH to
Antenna
RET Cabling from New 4T4R RRH to Antenna

Wrap up

RRH Cables Waterproofing


Site Cleanliness

New Installation materials for CDU


- All materials for the 2.6G LTE System Installation
Check for TYLC Scope
- Site acquisition and Civil work : H-Beam or Concrete &
Tower
- Civil Work (Cable Tray, Outdoor Cabinet(Include Rectifier)
Samsung Electronics. All Rights Reserved. Confidential and Proprietary.

Downtime : None