FOR DESIGN
1.Topographic/Hydrographic Survey
2.Geological & Geotechnical Investigation
3.Right of Way Survey
a. Parcellary Survey
b. Right of Way Improvement Survey
c. Subdivision Survey
Contents
1. Field Book or Computer
Generated Survey Data
- Traverse Reading and
Computation
- Topo Points/Side Shots Reading
- Horizontal & Vertical Controls
Observation
Data/Computation
- Road Profile & Cross Section Data
- River Profile & Cross Section Data
Highway
Projects
Bridge
Projects
x
x
GPS, BM,
BM
IBM, Traverse
Traverse
Station
Station
x
Flood Control
Projects
x
x
GPS, BM, IBM,
Traverse
Station
x
x
Highway
Projects
Bridge
Projects
Flood Control
Projects
Topographic/Hydrographic Plan
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
3.
4.
5.
Highway
Projects
Bridge
Projects
Flood
Control
Projects
River Profile
- River profile with elevation (CL & both banks)
Cross-sections
- Road Cross Sections @ every 20m interval
- River Cross-Section survey interval @ 50m for
Straight reach and 20m for Meandering channel
- Location of Existing Structures within ROW
- Maximum Experienced Flood Level (MEFL)
- Ordinary Water Level (OWL)
- Inlet/Outlet Elev. of Exist. Drainage Structures
x
x
x
x
x
x
x
x
x
x
x
x
x
x
N = ___________
E = ___________
Elev. = _____ m
Elev. _____ m
GPS-1=BM-1
0.40X0.40X1.00m. Concrete Monument
@ 12.359m. From Beginning Of Project Sta.
22+920.00
BM-3
0.30X0.30X0.60m. Concrete Monument
@10.530m. From CL, RS Of Sta. 23+936.540
BM-2
0.30X0.30X0.60 m. Concrete Monument
@ 5.104m. From CL, RS Of Sta.
23+436.252
BM-4
0.30X.030X0.60m. Concrete Monument
@ 6.239m. From CL, RS Of Sta.
24+412.781
GEOLOGICAL/GEOTECHNICAL DATA
Road, Bridge, Flood Control and Building Projects
Contents
1.
Geologic Map
a.Soil/rock formations
b. Geologic structures (i.e. faults, beddings, folds, fractures)
2. Geo-hazard Map
a. Foundation hazards (settlement, subsidence)
b. Seismic hazards (ground shaking, ground rupture, Liquefaction)
3. Boring Logs and Laboratory Test Results
4.
Soil Profile
a. Test Pits
b. Auger Boreholes
c. Boreholes
5. Material Sources Map
6. Geological / Geotechnical Report
BORING REQUIREMENTS
Type of Project
Spacing
Depth
Highway Project
Auger boring and/or
Existing Earth Road test pits
- 250m interval along the
centerline if traffic is >300
vehicles per day
- 500m interval if traffic is <300
per day.
- 100m interval for swampy or
marshy grounds
Widening Existing
Pavement
Boring and test pitting shall be
located on the area of widening
usually below the shoulder
Bridge Project
1 deep drilling for each
Multi- Span Bridges abutment & pier and SPT at
every 1.5 m depth
Type of
Project
Dams
Spacing
Depth
- Boring shall be spaced 60m over - Boring shall be times the base
foundation area and 30m
width of earth dams or 1 to 1
intermediate along centerline.
times the height of small concrete
dams in homogenous foundations.
- Boring shall be made at location - It shall be terminated after 3m
of cutoff and critical spots in
hard or impervious strata
abutment.
encountered.
Spacing
Depth
Generally, it should be no
less than 9m below the
lowest part of foundation
unless rock is encountered
at shallow depth.
The depth of borings should
reach 3m into bedrock.
RIGHT-OF-WAY SURVEYS
Parcellary
ROW
Improvement
Contents
1. PLAN
a. Plotted in grid coordinate system
x
Affected
Lots
x
Affected
Structures
x
x
x