Professional Documents
Culture Documents
inspections
Introduction
• Long experience in underwater systems
• Underwater systems research and development
– Underwater Acoustic systems
– Submarine equipment
– Mine hunting ROV
• Durning the 90s BI expanded on the Hydroelectric industry
• Videoray Pro 2 acquired in early 2000s first underwater inspections
• Benthos StingRay MKII acquired along with additional systems
– Scanning sonar
– Acoustic positioning system
– Acoustic thickness gauge
– CTD probe
• BI Underwater inspections are done in tight cooperation with FER, LabUST
• Content:
– HE Trebinje 1 (2009)
– Crashed airplane slvage operation (2008)
– RHE Velebit (2007)
Underwater
inspections
HE Trebinje 1
• Location: Bosnia and Herzegovina, Trebinje
• Basic specs:
– Year built: 1968.
– River: Trebišnjica
– Dam height: 123 m
– Water level difference:
• Normal: 86,5 m
• Max: 103,5 m
– Installed power:
• 2 x 54 MW
• 1 x 63 MW
– Installed water flow: 3 x 70 m3/s
Underwater
inspections
HE Trebinje 1
• Mission 1: fundamental outlets pressure equalization shafts
– Cause: water loss on fundamental outlet 1: 24 m3/day with shutter closed
Underwater
inspections
HE Trebinje 1
• Mission 1: fundamental outlets pressure equalization shafts
m
m
0
80
Underwater
inspections
HE Trebinje 1
• Mission 1: fundamental outlets pressure equalization shafts
Underwater
inspections
HE Trebinje 1
• Mission 1: fundamental outlets pressure equalization shafts
– Found: dilatation junction + ‘strange’ holes
Underwater
inspections
HE Trebinje 1
• Mission 1: fundamental outlets pressure equalization shafts
– Found: dilatation junction + ‘strange’ holes
Underwater
inspections
HE Trebinje 1
• Mission 2: Detailed inspection of significant parts of underwater dam wall
– Cause: Dam leakage to the dry side
Underwater
inspections
HE Trebinje 1
• Mission 2: Detailed inspection of significant parts of underwater dam wall
– Cause: Dam leakage to the dry side
Underwater
inspections
HE Trebinje 1
• Mission 2: Detailed inspection of significant parts of underwater dam wall
– Cause: Dam leakage to the dry side
Underwater
inspections
HE Trebinje 1
• Mission 2: Detailed inspection of significant parts of underwater dam wall
– Cause: Dam leakage to the dry side
Underwater
inspections
RHE Velebit
• Location: Croatia, near Obrovac
• Basic specs:
– Year built: 1984.
– Connecting Gračan field water
flows (upper accumulation) with the
river Zrmanja (lower acuumulation)
– Installed power, water flow,
water level difference:
• Production mode:
– 2 x 138 MW
– 2 x 30 m3/s
– 517 m
• Pump mode:
– 2 x 120 MW
– 2 x 20 m3/s
– 559 m
– Turbines at 47,5 m ground depth
(36,5 m below sea level)
Underwater
inspections
RHE Velebit
• Mission: Lower accumulaton (Zrmanja) concrete damage
volume estimation
• Cause: swirling currents
• Location: Zrmanja river outtake basin
Underwater
inspections
RHE Velebit
• Mission: Lover accumulaton (Zrmanja) concrete damage volume
estimation
Underwater
inspections
RHE Velebit
• Mission: Lover accumulaton (Zrmanja) concrete damage volume
estimation
• Mission concept:
– Vertically installed scanning sonar for damage depth measurement
– Accounstic tracking system for damage horiozntal size measurement
• Known facts:
– Basin blueprint
– Armature spacing (20 cm)
– Armature position in relation to the concrete original sursafce (10 cm)
– Armature rod diameter (10 – 15 mm)
Underwater
inspections
RHE Velebit
• Mission: Lover accumulaton (Zrmanja) concrete damage
volume estimation
Underwater
inspections
RHE Velebit
• Mission: Lover accumulaton (Zrmanja) concrete damage volume estimation
• Accoustic tracking system angle correction: 4,5°
Underwater
inspections
RHE Velebit
• Mission: Lover accumulaton (Zrmanja) concrete
damage volume estimation
• Calculated/estimated missing concrete volume:
– Damage 1: 0,11 m3
– Damage 2: 0,20 m3
– Damage 3: 0,61 m3
– Damage 4: 0,15 m3
– All together: 1,08 m3
Underwater
inspections
CONTACT INFORMATION
BRODARSKI INSTITUTE
Control Engineering Department
www.hrbi.hr