Energy Efficient IT

Ed Weber
IBM Systems Sales Manager
erweber@us.ibm.com

2010 IBM Corporation

IT Optimization

May 27, 2016

Its not speculation any more


Atmospheric warming is a now a broadly
accepted trend
41% of the Earths population (2.3 billion) live
in water-stressed areas; 3.5 billion will do so
by 2025
Increasingly includes developed areas such
as Western USA, Australia, SE England
There is now increasing pressure on traditional
energy resources, especially from rapidly
industrializing nations (China, India)
Energy consumption is expected to increase
by over 129% in parts of Asia by 2020
CEO/CFO focus is turning to energy costs &
environmental costs (CO2 emissions)
Major investors increasingly see poor green
performance as a source of risk

Climate change

Renewable energy
2010 IBM Corporation

Global warming
IT Optimization

May 27, 2016

Information technology (IT) accounts for.

Accounts for 2% of anthropogenic CO2


Roughly equivalent to aviation industry
IT energy usage will double next 4 years
Data source: Green IT: A New Industry Shock Wave, Gartner Symposium/ITxpo,

2010 IBM Corporation

IT Optimization

May 27, 2016

Energy Demands Have Data Centers at a Tipping Point


IT energy demand doubling every 9 24 months
6500 US data centers consume electricity equal to the
State of Utah
2009 CIO Survey

On average 100 units of energy generation equal 3 units


of work for productive IT
IT accounts for 2% of anthropogenic CO2 emissions
eWaste cannot be ignored 1 billion computers potential
scrap by 2010
Enough to fill the Rose Bowl each year
IBM investing to lead in power and cooling efficiency!

May 27, 2016

2010 IBM Corporation

IT Optimization

May 27, 2016

Opportunities abound for Green IT


The magnitude of the problem
Data Centers will consume 360B kwh this year -- doubling in next 4 years
Some Digital Media firms are forecasting doubling consumption annually
Over $43.5B in power & cooling industry wide in 2009
U.S. Energy Information Administration, IDC

...inefficiency needs to be addressed


100 units of energy production 3 units for productive IT
Average resource utilization <10% = $140B excess server capacity
-U.S Dept. of Energy, IDC

... e-waste can no longer be ignored.


1 billion computers will become potential scrap by 2010
Only 45% of US companies have eco-friendly disposal plans
The potential toxic risks of improper disposal are enormous
IDC, National Safety Council

2010 IBM Corporation

IT Optimization

May 27, 2016

Business drivers for Green IT

Financial
Operational
Social / Regulatory
Global
2010 IBM Corporation

IT Optimization

May 27, 2016

IBM Green Programs

Project Big Green


(Data Centers)
Steven Sams, VP
Rich Lechner, VP

Intelligent Transportation Systems


(Travel & Transportation Industry)
Marty Salfen, GM

Corporate Sustainability
Wayne Balta, VP

Smart Oil Fields


(Chem & Petroleum Industry)
John Brantley, GM

Big Green Innovations


Sharon Nunes, VP

Intelligent Utility Network


(Energy & Utility Industry)
Allan Schurr, VP
2010 IBM Corporation

IT Optimization

May 27, 2016

Business enterprises challenges are driven by


the following
Increasing IT demand

6x
69x
85%

Continued cost pressure

Growth in server
and storage
shipments this
decade.

18%

Of distributed
computing
capacity sits
idle.

75%

Increase in
data center
energy costs
in next year.

Responsive to change

20x

Technology density
increase in servers this
decade.

78%

Of data centers were


built before the dot com
era (>7 years old).

Of CIOs anticipate a
strongly centralized
infrastructure
Of IT workloads may
in 5 years.
5-60% be cloud-enabled.
2010 IBM Corporation

IT Optimization

May 27, 2016

Business enterprises can approach Green IT in


three simple ways.

Extend the life of an


existing data center
infrastructure.

Double IT capacity
or
Reduce operational
expenses by 50%.

Rationalize the data


center infrastructure
across the company.

Design new
infrastructure to be
responsive to change.
Pay as you grow
by
deferring 40-50%
of capital and

Improve operational
efficiencies
while
reducing operational
expenses by 50%.
2010 IBM Corporation

operational costs.
IT Optimization

May 27, 2016

Extend the life of the hardware, software, and


facilities.
Optimize IT infrastructure

Virtualizationpaybacks.
provides TCO savings.
Actions forRange
cost
savings
with
immediate
of cost savings
Reduce costs and complexity with 30-40% TCO.
HIGH

LOW

Leverage energy efficient IT technology.


Reduce on-going IT energy costs over 30%.

Server &
Storage
Virtualization

Optimize data center infrastructure


Get the facts with an energy assessments.
Reduce costs 15-40% with < 2 year payback.

Client
Virtualization

Energy
Efficient
Hardware

Add cooling capacity with High Density Zone.


Cost effectively adopt new technology at up to 35%
less than site retrofit.

Data Center
Optimization

Software
Energy
Management

0%

20%

40%

60%

80%

100%

2010 IBM Corporation

Optimize IT and data center infrastructure


Monitor and manage energy use.
Integrate IT, data center, and buildings energy
consumption to save 15-30% a year.
IT Optimization

May 27, 2016

What is a Green Data Center?


Diagnose
Get the facts to understand
your energy use and
opportunities for
improvement

Build
Plan, build, and
upgrade to
energy efficient
data centers

Manage &
Measure
Green Data
Center

Virtualize
Implement
virtualization and
other innovative
technologies

Seize control
with energy
management
software

Cool
Use innovative
cooling
solutions

2010 IBM Corporation

IT Optimization

May 27, 2016

13

Web-based energy efficiency tools


Free self assessment tool

Energy Efficiency Incentive Finder

Assessment Process
Twelve questions on energy usage
Awareness of power related issues
Deployment of tactical quick hitters
Extent of strategy data center planning
Report on improvement areas
IBM Service recommendations

Open, Web-enabled Clearinghouse for data center


energy efficiency programs offered by local
utilities and governments
Listing programs available in your community and
applicable to your data center
Includes participating providers around the world
One stop shopping

ibm.com/itsolutions/optimizeit/cost_efficiency//energy_efficiency/services.html

2010 IBM Corporation

www.energycommons.com

IT Optimization

May 27, 2016

15

How is energy typically used in the data center?


Data center
IT Load

55%

45%

Power and Cooling


Data source: Creating Energy-Efficient Data Centers, U.S. Department of Energy , Data Center Facilities and Engineering Conference, May 18, 2007
2010 IBM Corporation

IT Optimization

May 27, 2016

16

Innovations to build or upgrade to green data centers

IBM Optimized Airflow Assessment for Cabling


Replace cabling systems with high-performance fiber transport systems
Yields improved cooling and reduced energy usage across data center
IBM Scalable Modular Data Center
Rapid deployment in 8-12 weeks
Provides ready racking, power, cooling, security and monitoring
500 & 1,000 square foot data centers at 15% lower than traditional data
centers
IBM manages integration and coordination of data center
IBM Thermal Analysis for High Density Computing
Clients can identify and resolve existing and potential heat-related
issues
Helps prevent outages and provide options for power savings and
IT Optimization
May 27, 2016
2010 IBM Corporation
expansion

17

Data center stored cooling solution


Thermal storage solution to improve efficiency of cooling system by 40-50%
Shift energy usage to off-peak hours saving up to 30%
Provide extra cooling capacity to enable growth and survive grid failures
With Cool Battery, IBM cut energy cost of IBM Bromont site by 45 percent
Cooling System with PCM
Thermal storage device between
computer room air conditioners
and chillers

HVAC unit

heat
PCM storage

Chiller
Cooling
tower

heat

2010 IBM Corporation

IT Optimization

May 27, 2016

18

Broad energy ecosystem to holistically attack the issue


Partnering with leading global data center power and cooling
technology providers
Governments and energy utilities are also helping clients
improve their overall energy efficiency

2010 IBM Corporation

IT Optimization

May 27, 2016

19

IBM has helped companies around the globe increase


their energy efficiency and reduce expenses
Data Center and Facilities Strategy
Super computing: Built the #1 super computing center (Mare Nostrum) for
high redundancy with extremely dense computing environment
Financial: Built 50 large Chinese data centers including the countrys top 5 banks

IT Facilities Consolidation and Relocation


From many to few: ICBC 38 to 2 centers; $180M in annual savings
Without interruption: 4 to 1 centers with no interruption; ~$11M in annual savings
When uptime is critical: Relocation of Wake Medicals hospital data center
without patient impact

IT Facilities Assessment, Design and Construction

Deep experience: >30 million square feet of raised floor


Global breadth: Building largest client data centers for Egypt Telecom and India
Wide array of assessments: Energy, resiliency and new technology adoption
All size businesses: Small client solutions at Bryant University

Mare Nostrum, Europe's most


powerful supercomputer

Specialized Facilities
A green leader: Designed and built > 35 percent of the top rated green / Intelligent buildings in Japan
When precision matters: Design and building of facilities for clean rooms for chip fabrication and
pharmaceutical companies
2010 IBM Corporation

IT Optimization

May 27, 2016

20

IBM BladeCenter Open, Easy, Green


Efficient system design for energy savings based on IBM Research
Consolidation extended to network/IO devices removing the need for extra power
supplies and fans
Get best-in-class efficiency for 20% less power than offerings from other vendors
Only IBM BladeCenter offers 10G Ethernet connectivity inside the system
Up to 95% more energy efficient than external switch solutions

2010 IBM Corporation

IT Optimization

May 27, 2016

21

Power supply efficiency innovations


Design of New Power supplies are planned to meet the 80/20 requirements
Greater than 80% Efficiency for any load greater than 20%
Greater weight now given to 40-70% load range over the 100% load in Design & Purchase Decisions
Redundant system typically run at less than 50% of load
Typical Customer configurations run in 40-70% range

Historical Power Supply


Selection Point (100% Load)
Increased Emphasis Will Be Placed on 40-70% Load Range

2010 IBM Corporation

IT Optimization

May 27, 2016

22

Power efficiency in Information Lifecycle Management


The ILM Process Managing information through intelligent
archive and destruction
Information Lifecycle

ILM . . .

ent
conctycle
life

move data to the most cost


effective storage for its
current use

Create /
Capture

ent
conctycle
life

ent
conctycle
e
f
li

ent
conctycle
life

Revise

Route

Approve

ent
conctycle
e
f
li

Publish

ent
conctycle
life

Archive /
Destroy

Information Management
Classify

Compliance
Corporate Policies

Declare
Audit

In the future . . .
move data to the most power
efficient storage that satisfies
usage requirements

2010 IBM Corporation

Business Rules

Security

Tiered Storage

IT Optimization

May 27, 2016

23

How is energy typically used in the data center?


Data center

Server/Storage hardware
Processor

IT Load

55%

45%

Power and Cooling

70%

30%

Power supply, memory,


fans, planar, drives . . .

2010 IBM Corporation

IT Optimization

May 27, 2016

25

Energy Management
Technology Trends
Energy Trending
Thermal Reporting
StaticEnergy Saver Mode
Energy Capping
Soft Energy Capping
Processor Nap
Memory Nap
Energy-Optimized Fan Control and Altitude Input
Processor Folding
eDRAM vs sDRAM
Power supply efficiencies
Air flow dynamics
Integrated blades
Solid state drives
Rear door heat exchanger

2010 IBM Corporation

IT Optimization

May 27, 2016

Energy management at a system level


IBM Active Energy Manager
Helps companies meter, control, even
cap their power usage
Cruise control for power
consumption of servers
Now available on all IBM servers
and storage

2010 IBM Corporation

IT Optimization

May 27, 2016

27

Set power cap to peak - allocation


Simulated graph of actual power consumed by the server over time.
Today, label power is the only option within the server
Label Power

Set Power
Cap

Allocation Model of Server

Power typically allocated to a server

Over Allocated
Power not converted
into compute cycles

Based on measured power

Wasted Power
Allocation

Proper
Power

Power

Allocation

Power budget not


converted into
compute cycles

Power budget
converted into
compute cycles

(watts)
Time
Power Exec Trending (weeks, months)

2010 IBM Corporation

IT Optimization

May 27, 2016

28

Monitor, manage and reduce consumption


Knowing whats in your enterprise
CCMDB
Discover devices in your enterprise

IBM Tivoli Monitoring


Monitor, Manage, Alert for use
Adapt application usage to power
constraints

Consolidate / eliminate
underutilized resources

2010 IBM Corporation

IT Optimization

May 27, 2016

29

Distribute energy use charges


Tivoli Usage and Accounting Manager
Who used what?
How much did IT cost?
Chargeback

2010 IBM Corporation

IT Optimization

May 27, 2016

30

How is energy typically used in the data center?


Data center

Server/Storage hardware

45%

Power and Cooling

Resource
usage rate

Processor

IT Load

55%

Compute Resources

70%

80%

30%

Power supply, memory,


fans, planar, drives . . .

2010 IBM Corporation

IT Optimization

20%

Idle

May 27, 2016

31

Virtualization creates fast path to green data centers


Improves server and storage utilization which:
Reduces the number of devices and associated environmentals
Allows for targeted thermal solutions for efficiencies
Allows for more efficient power distribution, backup, and regulation

Enables dynamic resource management for:


Deployment and Operational Optimizations

Some examples:
Base Consolidation
Policy Based Consolidation
Policy Based Provisioning
2010 IBM Corporation

IT Optimization

May 27, 2016

32

Storage virtualization
Pool and share I/O resources for:
Improved utilization
Reduced energy needs

Combined
utilization
40%

SAN Volume Controller


EMC
IBM

IBM

Hitachi
HP

2010 IBM Corporation

Combined
utilization
80%

IBM

IT Optimization

May 27, 2016

33

Environmentally responsible disposal


IBM Global Asset Recovery Solutions
Buyback services for marketable assets
Disposal of assets using environmentally compliant processes
Secure disk overwrite services in accordance with
high level security standards
Packaging and transportation services available
Approximately 40,000 units processed per week on worldwide basis
Less than 1% sent to landfill, none hazardous material
Annually invest more than $100M in infrastructure to support
remanufacturing and recycling best practices

To optimize TCO benefits, companies require a corporate


standard disposition strategy -- Gartner Group
2010 IBM Corporation

IT Optimization

May 27, 2016

34

Green IT Roadmap Step 1


Set substantive goals
Effective global goals should document integrated results from across all aspects of your
business
44%

IBM Example

Between 1990 and 2006, IBMs


global energy conservation

600

actions reduced or avoided CO2

500

emissions by an amount equal

400

to 44% of our 1990 emissions.

300

1998 Became the first semi-conductor


company to set a numerical target for
PFC emissions reduction

200

New goal: to extend the above


achievement by reducing CO2
emissions by 12% between
2005 and 2012.

100
0
2000

2001

2002

2003

2004

2005

58% Reduction
2010 IBM Corporation

IT Optimization

May 27, 2016

36

Green IT Roadmap Step 2


Must be transparent and verified

17 yrs.

Market expectation is for progress toward goals to be open and verified by reputable 3 rd party
Not acceptable to just declare your organization Green

IBM Example

Annual corporate environmental reports released every


year since 1990

U.S. Dept. of Energy's Voluntary Greenhouse Gas Emissions


Reporting for 13 years (since inception)

Reported to the Carbon Disclosure Project for 5 years


(since inception)

Independent verified greenhouse gas emissions through


WWF Climate Savers, Center for Energy & Climate
Solutions, U.S. EPA Climate Leaders, and Chicago Climate
Exchange

Neuwing
Energy
Ventures

Launched industries first Energy Efficiency Certificate (EEC)


program with Neuwing Energy Ventures
2010 IBM Corporation

IT Optimization

May 27, 2016

37

Green IT Roadmap Step 3


Demonstrate leadership in your industry
Partnerships and collaborations are important if you want to improve
environmental performance of your supply chain.

1st

IBM Example

First in our industry to establish numeric goal for reducing PFC emissions

Charter memberships in World Wildlife Fund's Climate Savers program, World Resources
Institute's Green Power Market Development Group, U.S. EPA Climate Leaders and Chicago
Climate Exchange

Member of U.S. EPAs SmartWay Transport Partnership and Green Grid Consortium

Green Power
Purchaser
Award 2006

Business Environmental
Leadership Council

Charter member of U.S.


EPAs ENERGY STAR
Computers Program 1992

Green Grid
Founding Member

2010 IBM Corporation

FORTUNE 500 Top 20


2004, 2005, 2006

IT Optimization

USEPA
Climate Protection Award
1998 and 2006
May 27, 2016

38

What is an Energy Efficiency Certificate?


Also known as White Tags
A new tradable attribute similar (but different process) to RECs
Represents the value of energy not used (conserved) in Data Centers or other facilities
efficiency programs
An emerging method to verify your programs by a 3rd party
Created through the implementation of energy conservation projects on the demand side
IBM and Neuwing program is first in market for clients to use

2010 IBM Corporation

IT Optimization

May 27, 2016

39

What does this mean to your business?

Financial
Operational
Social / Regulatory
Financial Benefit = f (cost savings) + f (manageability) + f (flexibility) + f (incentives)

Global

Non-Financial Benefit = f (Operational) + f (Social) + f (Global)


2010 IBM Corporation

IT Optimization

May 27, 2016

42

What about the other

2010 IBM Corporation

IT Optimization

May 27, 2016

43

Big Green innovations


Intelligent Utility Networks
IBM and CenterPoint Energy are engaged
in a strategic effort to develop and deploy
Intelligent Utility Network (IUN) solutions

Transport Systems
Stockholm Congestion Tax Project - differentiated pricing by
time of day, congestion level, and potentially emissions level
1st month pilot results:
Traffic reduced by 100,000 vehicle passages per day (25%)
Public transportation passengers increased by 40,000 / day

Environmental Research

Advanced Water Management


Carbon Management
Alternate Energies
2010 IBM Corporation

IT Optimization

May 27, 2016

44

IBM Project Big Green


Green today for better tomorrow

IBM to reallocate $1 billion a year


NEW YORK May 10, 2007 IBM (NYSE: IBM)

IBM Project Big Green

To guarantee the research and development funding for IT energy efficiency technology.

Create an 850 member worldwide IBM Green Team of energy efficiency specialists.

Plan, build or prepare our facilities to be Green Data Centers based on IBM best practices and
innovative technologies in power and cooling.

Use virtualization as the technology accelerator for our Green Data Centers to drive utilization up
and our annual power cost per square foot down.

Re-affirmed IBMs long standing commitment to environmental responsibility


1.

IBM energy conservation efforts from 1990 2005 resulted in a 40% reduction in CO2 emissions
and $250 million energy savings. IBM commits to an additional 12% CO2 savings by 2012.

2.

IBM will double the compute capacity of our Green Data Centers by 2010 without increasing
power consumption or carbon footprint, thus avoiding 5 billion kilowatt hours per year and CO2
savings equivalent to 11M cars
2010 IBM Corporation

IT Optimization

May 27, 2016

46

In the final analysis,


its only our planet.
Understand your present environment
Make efficient use of technology
Lead by example

ibm.com/systems/greendatacenter
2010 IBM Corporation

IT Optimization

May 27, 2016

47

Building a Smarter Planet

Green IT: www.ibm.com/green


For CIOs:: www.ibm.com/cio
For facilities managers: www.ibm.com/services/siteandfacilities
2010 IBM Corporation