BUILDING
Types
Detached
Semi-detached
Attached
Advantages
Work Sequence
Structural work
Site clearance and layout
Excavation
Soling + PCC
Footing
Pedestal
Substructure brickwork
Tie beam
Backfilling and Compaction
Column
Beam and slab
Brickwork with Door frame fixing and its cutting for
conduiting
POP/Puttying
Door shutter
1st coat paint
Aluminium shutter
Switch socket
Furnishing by client
Sanitary fixtures
Polishing work
Final paint
Deep cleaning
Construction materials
Cement
OPC for RCC, IPS
PPC/PSC for PCC, brickwork, plaster
Sand
Coarse for concrete, brickwork
Fine for plaster, tile work
Rebar
Fe 415 tor
Fe 500 TMT
Fe 550 torkari
Analysis of Rates
Labor cost
No. of labor or Petty rate
Transportation charge
Material cost
Tools and plant (3% of Labor cost)
Overhead & Profit (15% of total cost)
Selection of Materials
Economic
Expensive
Normal/Somany tile
Parryware
Jaquar
PPR pipe
Small window opening
Cement paint,
Distemper, Enamel
IPS flooring
Readymade shutter
CPL
White horse/Guocera
Duravit/American Standard
Grohe/American Standard
Pex, CPVC, GI
Large window opening
Euroshield, Emulsion,
DuraSeal, Automotive,
Chapra
Marble, Mosaic
Sal, Sishum
Clipsal
Structural collapse
Cracks and seepage
Cost overrun
Dispute
Preventive Measures
Vastu prefers
Clockwise stair
Entrance/More opening at south or east
Kitchen facing east & cook
Master bedroom in southwest
Commode not in east wall
Puja room not sharing wall with toilet
Beds not heading north
Main entrance not in front of the temple
Always remember
To investigate the bearing capacity of soil before
building construction
To install electrical DB box in 9 brick wall and
not in toilet partition wall
To keep at least 6 gap between the flights of
dog-legged staircase
To provide proper ventilation in toilet
To design slope at car porch away from building
To protect/cover power socket exposed to rain
To provide light points at periphery of building
To provide adequate rain water outlets in terrace