Schneider Busway

AE

I-LINE Busway Instruction

Mar 2005
Division - Name - Date - Language

1
1

Catalog
1 Unpacking inspection on site
2 Preparation before the installation
3 Busway Installation
4 Basic test on Busway

Mar 2005
Division - Name - Date - Language

2
2

1.Unpacking inspection on site (1)


Unload and Storage:After receiving,store the busway in a clean,dry space that
having a uniform temperature,it is better to store the busway in a special
warehouse.Place the goods exactly in terms of the size of the packing.
Unpacking:Cut the banding that secures the package with band cutters.Use nail
pullers when unpacking wooden crates.Avoid destroying the busway, do not use the
goods for prizing up the crates.
Iinspection:Base on the packing list and the BRASS to check each label of the
goods (or packing).In order to find the items easier and make sure the accuracy of
the installation ,please do not remove the carton.Keeping the accessories that along
with the busway.

Mar 2005
Division - Name - Date - Language

3
3

Unpacking inspection on site (2)


Packing List & BOM List & Brass should be corresponding.
Packing List

Brass drawing
BOM List from BRASS

Run
No.

Mar 2005
Division - Name - Date - Language

4
4

Packing of the Busway


Straight length

Accessories

Label in carton

Mar 2005
Division - Name - Date - Language

5
5

2.Preparation before the installation


Check the packing when receiving,if there are some polluting,please clean them if
there are no effect on their performance,otherwise,please notify the nearest Schneider
Electric Company representative.
Prepare some tools such as AT2 (supply by SBG), manual or automatic jack, insulation
resistance tester,tape,plumb, torque wrench etc.
Read the drawings and the instruction that along with the goods carefully,make sure to
understand the routing and the installation position of the busway.
Fix the drop rod or support before installing the busway.
The installer should should be professional qualified.

Mar 2005
Division - Name - Date - Language

6
6

I-LINE II Ex-factory test

100% testing before exfactory at 7,500V DC.


Insulation resistance:
10M/feet
IEC Standard: 1M/feet

Mar 2005
Division - Name - Date - Language

7
7

3.Application

Horizontal application
Vertical application

Mar 2005
Division - Name - Date - Language

8
8

Tips on
installation
After unpacking, please test the busway phase to phase and phase to the earth
by insulation resistance tester,make the record accordingly.
Orient the busway,make sure no the buways is crossed .
Conduct an insulation resistance test on the busway run after all the busways
have been installed.
Follow Six steps for installation of the joint pack.
Adjust the whole run in a straight line when the installation has been done.

Mar 2005
Division - Name - Date - Language

9
9

1) To pretect the busway from dust or water,please


pack the end of the unfinished Run when off duty.
Plastic
packing

Mar 2005
Division - Name - Date - Language

10
1
0

2) Adjust the height for both busway

Mar 2005
Division - Name - Date - Language

11
1
1

3) Tighten the 2 pieces busway by AT2

Assembly
tools(AT2)

Mar 2005
Division - Name - Date - Language

12
1
2

4) Make sure the spacing of the 2 bolts (as attached)


is 340mm.
340mm

Mar 2005
Division - Name - Date - Language

13
1
3

5) Cover the tie-channel,and tighten the bolt


orderly.
tie-channel

Mar 2005
Division - Name - Date - Language

14
1
4

6) After all the installation and insulation test


have been done,break off the outer head with
proper torque.

VISI-TITE
bolt

Mar 2005
Division - Name - Date - Language

15
1
5

There is a washer and gasket when installing IP54


elbow.

washer and
gasket

Mar 2005
Division - Name - Date - Language

16
1
6

Spring hanger installation

Mar 2005
Division - Name - Date - Language

17
1
7

1) For vertical application,N phase should be on your


left side when you in the face of the opening of busway.

N
Mar 2005
Division - Name - Date - Language

L3

L2

L1
18
1
8

2) Tighten the bolt base on the below list.

Compress length
of the spring
hanger

Mar 2005
Division - Name - Date - Language

19
1
9

3) Fix the spring hanger on the C-channel with bolt.

Mar 2005
Division - Name - Date - Language

20
2
0

4) Tighten the busway with clips of the spring hanger ,torque


requires 14~17N*M.

Mar 2005
Division - Name - Date - Language

21
2
1

5) Loosen the bolts when all the installation has been


done,and then check the flex of the spring.

If the length of the


spring get longer in this
floor so that it will
become shorter in the
next floor,this case
means the the clips
have not been tighten
with the busway.
Mar 2005
Division - Name - Date - Language

22
2
2

6) Check the dimension change of the spring hanger regularly to


certify whether the support is suitable for the busway or not.

Mar 2005
Division - Name - Date - Language

23
2
3

I-LINE Plug-in unit (or called tap-off unit)


MCCB PIU

- with MG breaker (15-1000A)

MCCB PIU

- with Square D breaker (151600A)

Fusible PIU

- with (30-1600A)

Mar 2005
Division - Name - Date - Language

2
4

Mar 2005
Division - Name - Date - Language

2
5

I-LINE Plug-in unit - Safe, Easy to install


Integral enclosed conductor
All plug-in units are equipped
with inter-lock device
Hook-swing plug-in
opening where the
connectors make contact with
bus bars
Grounding jaw connects
busway ahead of phrase jaws
PIU Mounts correctly by
design
Mar 2005
Division - Name - Date - Language

2
6

Maintenance
Keep the instruction that along with the busway.
Maintenance the busway base on the instruction.
The installer should be professional and qualified.
Call the nearest Schneider Electric Company
representative if needed.