DEFECT

MANAGEMENT
GUIDELINES
PROTECTION

23 OCTOBER 2015

GROUP LEADER:
Ho Nyuk Shiong
GROUP MEMBERS:
Felix Ho Feng Nam
Fulbert bin Frederick
Azizul Awang Anak
Nasrung Nurba
Kahardi Muhamad Talib

PRESENTATION TOPICS
I.

Objectives

II.

Defect Management Process Flow Chart (Amended)

III. Identify Defect Criteria and Severity/Priority Ranking


IV. Proposed Intervention and Repair Time against Defects

Criteria
V.

Timeline to complete the Guidelines

Objectives
The primary goal is to prevent defects.
While defects may be inevitable, a defect management

process is required to focus on catching and tracking the


defects as early in the process as possible, and
minimizing the impact of defects in Grid Network.
Defect information should be used to improve the

process.

Defect Management Process Flow Chart


(Amendment)
Transmission Defect Management Process Flow Chart
Proposed changes:
from UPK to MSU (Maintenance Support Unit) for key in defects
into SAP system.
from Receiving/ Finding Complaints/ non Comformities relating to
transmission Primary equipment to Receiving/ Finding
Complaints/ non Comformities relating to Regional assest.

Secondary Injection Tests


To check the accuracy of relay operating elements are

within tolerance limits.


To prove the correct operation of the protection scheme

that is downstream from the inputs to the protection


relay(s).

Protection Relay Operating Elements


Defect criteria:

PRIORITY

Very
High (1)

VOLTAGE
LEVEL

All

PROTECTION

Main/
Backup
Relay

ERROR LIMIT (%)

Exceed 10% of
setting element

RECOMMENDATION

REPAIR TIME

Indicates trouble and Rectify within


very urgent, to plan 36 hours.
repair/ replace
immediately.

Current Differential Intertrip Scheme

Distance PUTT Scheme

Distance POTT Scheme

Breaker Failure Scheme

Communication Check
Communications systems needed for relaying or

protective tripping
Channel status should be continuously healthy.
Channel delay should be steady and within reasonable
margin.

Communication Check
Communications systems needed for relaying or

protective tripping
Channel status should be continuously healthy.
Channel delay should be steady and within reasonable
margin.
Refer to TNB COP Edition 2:
PRIORITY

Very High
(1)

PROTECTION

TRANSMISSION
DELAY LIMIT

Current Differential/ 15ms


Current
Comparison

RECOMMENDATION

Coordinate with ICT


immediately for
rectification.

REPAIR TIME

Rectify within
36 hours.

Relay Setting and Logic Configuration


Relay setting and logic configuration found at site must be

100% same as issued by Protection Department.

PRIORIT
Y

VOLTAGE
LEVEL

Very
High (1)

All

PROTECTION

Main/ Backup
Relay

ERROR LIMIT

Not 100%
identical

RECOMMENDATION

REPAIR TIME

Indicates trouble
and very urgent, to
rectify immediately.

Rectify within
36 hours.

Autoreclose Scheme
PRIORIT
Y

Very
High (1)

VOLTAGE AUTORECLOSE
DEFECT CRITERIA
LEVEL
SCHEME (AR)

275kV

High Speed
No AR for single
Single Pole AR phase to earth
fault
(1 shot)
Delayed Three No AR for phase
Pole AR
to phase fault
(1 shot)
or phase to
phase to earth
fault
No lockout for :
3 phase fault
fault occurs
within Reclaim
Time
SOTF

RECOMMENDATION

REPAIR TIME

Indicates trouble
and very urgent, to
plan repair/ replace
immediately.

Rectify within
36 hours.

Autoreclose Scheme
PRIORIT
Y

Very
High (1)

VOLTAGE AUTORECLOSE
DEFECT CRITERIA
LEVEL
SCHEME (AR)

132kV

Delayed Three No AR for all


Pole AR
type of faults
(1 shot)
except 3-phase
fault
No lockout for :
3 phase fault
fault occurs
within Reclaim
Time
SOTF

RECOMMENDATION

REPAIR TIME

Indicates trouble
and very urgent, to
plan repair/ replace
immediately.

Rectify within
36 hours.

Autoreclose Scheme
PRIORIT
Y

VOLTAGE
LEVEL

Very
High (1)

275kV

AUTORECLOSE
SWITCH
DEFECT CRITERIA
SELECTION

RECOMMENDATION

REPAIR TIME

On
Off
1

Indicates trouble
and very urgent, to
plan repair/ replace
immediately.

Rectify within
36 hours.

Indicates trouble
and very urgent, to
plan repair/ replace
immediately.

Rectify within
36 hours.

Very
High (1)

132kV

AR of
AR on
1-pole AR and
3-pole AR

1+3

1-pole AR or 3pole AR

On

AR of

Off

AR on

Interlocking/ Control Check


Breaker tripping and control circuits, including auxiliary

tripping and lockout relays.


primary equipment status indications required for correct
relaying operation (CTS, VTS, TCS, CB Status).

DC System Test
DC station batteries supplying the protection system.