3/13/17
PRI 16021-01
3/13/17 2
MFPMEA for Induction Heat Treat Version 12/10/15
Recommendations for:
a. Product
b. Process
c. Equipment
3/13/17 3
MFPMEA for Induction Heat Treat Version 12/10/15
Detailed description of Process Control (describe the best practice control for this failure mode)
a. Product:
1) Retain all cut samples. If Safety Characteristics apply, then follow PS Safety:
a. set-up samples -1 year
b. samples after program change 1 year
c. first piece after maintenance 1 year
d. 6 months of production samples (FCA approval required, for deviations)
d1. first piece samples of the week 1 year
2) 100% NDT automated inspection for shafts to detect soft spot or low surface hardness for safety shield
characteristic; or as alternative use lot release following inspection recommendations listed here.
3) Frequency of destructive testing: 1 per spindle, per 500 pieces or every shift if 500 not achieved in one shift
(deviations must be approved by FCA materials engineering), additional to set-up/1 st piece.
4) Hardness checks on diameters should be minimum 4 circumferential interface locations.
5) Reported hardness measurements must be an average of minimum 3 indents per required location.
6) Microstructure checks need to be in an etched and polished mount.
7) Microstructure checks required for assembly interface location(s). Locations shall be reviewed and agreed with
FCA Product, Materials and SQ Engineering.
3/13/17 4
MFPMEA for Induction Heat Treat Version 12/10/15
Detailed description of Process Control (describe the best practice control for this failure mode)
b. Process:
c. Equipment:
1) Use of flow meter and pressure sensor to detect acceptable flow at each induction coil.
2) Use stainless steel filter canisters / non-corrosive components on Induction line. Filtration system shall be
capable to filter quench media down to 100 micron size.
3) PM procedures to include the induction machine, quench rings & induction coils, verify cleanliness inside and
outside of components are clean and free of contaminants; per equipment manufacturer recommendations.
3/13/17 6
Powertrain Mexico Strategy
Campaing
Kickoff Meeting
with tier 1
Campaing
Kickoff Meeting
with tier N
March April
Compliance Audit
At Tier 1
MPFMEA Compliance
CQI- 9 Compliance
At Tier N
FCA SQ Tier 1 MPFMEA Compliance
Responsability Responsability CQ1- 9 Compliance
3/13/17 7