R Bogie design
support the corners of the triangular roof panels. At the interface between the
U bogie and panels, proprietary plain spherical thrust and sliding bearings would
C accommodate the movements and carry the lateral loads induced by the drive
T system and inclined tracks. The bogies also had to provide stability in an extreme
U seismic event, and additional restraint was provided by sliding restraints
transferring loads onto the fixed roof structure. These tie-downs also transferred
R any uplift loads induced by wind.
A
L Drive system
The gradient of the curved track on the fixed roof (10 at its steepest) meant that a
S powered railway-type bogie system could not be driven reliably without a rack-
Y and- pinion drive or winch-driven system. While there was sufficient space within
S the bogie to package the former, the design progressed using a wire rope (cable)
T winch system as this was the most cost-effective option.
The reeving arrangement chosen conveniently houses the winches within the
E retractable roof, reducing the amount of exposed equipment on the fixed roof.
M Mounting the haul ropes, drums and winches on the bogies also reduced the
S overall length of steel cables required and improved positional control. The cable
& would not move relative to the fixed roof, so additional sheave rollers on the roof
or return pulleys would not be needed. Based on the scheme selected, either
D hydraulic motor drives or three-phase electric induction motor systems (around
E 150kW) could be used to move the roof.
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R
U
C
T
U
R FINAL GEOMETRY:
A Reasons for the elimination of retractable roof:
L Larger opening
S Cost reduction/the reduction in the amount of steel used.
Y
S
T Centreline geometry definition:
E
Most the geometry can be assigned to three categories:
M
S Primary: This comprised the space truss lines and the main structural
& system.
D Secondary: This was used to break up the panel size created by the main
structural system to facilitate the cladding system panels.
E Stairs: The access stairs to the top tier of the bowl were integrated into the
S walls supporting the roof structure.
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R
U
C
T
U
R
A Initial design sketch for the roof ETFE Membrane
L ROOF SPAN: 313m x 266m
Envelopes the bowl and concourses to form both faade and roof. The
S faade incorporates the Stadiums main staircases. The result is a compact
Y and sinuous external form uninterrupted by masts, arches, or stair cores.
S While the faade is open, a roof covering made of single-layer ETFE
T membranes stretched between the steelwork sections protects the
spectators from wind and rain.
E
M
S
&
D
E Left the faade uncladed, allowing the staircases that form part of
the roof structure to remain open. It resulted in a great
S architectural experience.
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R
U
C
T
U
R
A
L
S
Y
S
T
E
M
S
&
D
E
S Twisting curved box-section.
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
ROOF STRUCTURAL COMPONENTS:
S
T 24 Column-Truss structure
R 2 inclined truss elements
1 vertical-diamond shaped element
U
C At their lower portions, the three column truss elements
T are very close to each other, and detailed so that all
U three members merge to form a single large steel
element. The column truss structures were assumed to
R be fixed to the pilecaps with the foundation spring Column head showing principle elements
A stiffness estimated based on the pile load test results.
L
S
Y
S
T
E
M
S
&
D Interface between retractable and fixed roofs
E
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R
U
C
T
U
R
A Each of the faades steel members retains a 1.2m wide external profile as it
L twists and bends to follow the saddle shaped geometry of the Stadium. The
steel structure is painted light grey, contrasting with the red-painted external
S concrete wall of the bowl, which is clearly visible through the faade. This
Assuming the material is in the elastic stage, the results
Y of the calculations were Expressed in the von Mises creates a variety of impressive effects, particularly when lit at night.
S stress diagram.
T
E
M
S
&
D
E
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S The construction stage analyses that reflected the
actual erection sequence included 78 installation
T support points for falsework for the roof structure
R erection.
U
C Based on the loading stage of the structure, four
key construction phases were determined for the
T static construction stage analysis, as follows:
U
R Phase1:Construct 24 columns, faade
A secondary structure, ring trusses in the middle,
and the primary truss (with temporary support).
L
S Phase2:Remove the temporary support after
Y assembly of primary trusses in sections
(completion of the main structure).
S
T Phase3:Construct secondary structure on the
E top surface and facade stairs.
M
Phase4:Install the pipelines for cladding
S structure, catwalks, light fittings, and drainpipes.
&
D
E
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R Load Resistance on the structure
U
C The Beijing National Stadium is designed to resist both typical
T building loads and earthquake loads.
U
R Horizontal Loads
A The structure must resist a total of 56,625 tons of vertical load. The
L
Steel structure itself must resist its own load of 42,000 tons and
S
Y 11,625 tons of live load, totaling in 53,625 tons. The Plinth type of
S the foundation is essential to carry such a load, which is fairly
T evenly distributed.
E
M Each member of the steel Nest is designed carefully to carry its
S own weight of 42, 000 tons loads. The overall shape appears to be
& random, but in reality it follows strict geometric rules.
D
E
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R The core portion of the building carries the dead load of the
U concrete structure as well as the live load of people totaling to
C 13,122 tons. The load is transferred directly to the plinth foundation
T as distributed load as shown below.
U
R
A
L
S
Y
S
T
E
M
S
&
D
E
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R
U Lateral Loads
C
T The massive steel structure resists lateral loads in a similar manner
U as the horizontal ones. In addition, instead of the loads hitting the
R structure and following it downwards and upwards it is broken
A down through the lattice of steel while being weakened and
L providing natural ventilation in the building.
S
Y
S
T
E
M
S
&
D
E
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S The loads at each
T intersection are split
R between the
U members and
C transferred
T downward as
U indicated below.
R The red points
A indicate the transfer
L connections were
S load impact is felt
Y most significantly. The
S below image
T identifies the primary
E and secondary
M members. the
S secondary members
& had to be welded on
D two sides of primary
E members.
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R
U Initial nonlinear computer
C simulations indicated that, in
T some analysis cases, collapse
U may occur when subjected to
R the strong ground shaking of
A
the level 3 earthquake. Arup
L
examined the collapse process
S
in these computer runs and
Y
S identified the critical primary
T truss members that needed to
E be strengthened. After a few
M iterations, the collapse
In the damage states of the roof truss members, most primary members
S prevention performance remained elastic (green), but some sustained moderate damage (blue: the
& objective was achieved in all immediate occupancy damage state), entering slightly into the post-
D buckling range of response. Only a few reached the significant damage
analysis cases. state (yellow: the life safety damage state), responding well into the post-
E buckling range of response but without reaching the point at which
S strength starts to degrade.
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R
Thermal comfort in the Stadium
U
C
T
U
R
A
L
S
Y The Beijing Olympics were promoted as green.. To make Beijing National Stadiums
S green design work, the thermal condition inside was critical, especially when in its
T Olympic mode, with up to 91000 spectators. Thermal comfort in a semi-open space
E is a subjective measure of peoples physiological response.
M During the design process, the following optimisations were performed to improve the
S thermal comfort level cost-effectively, without any active mechanical systems: increase
& the distance between the highest seats and the false ceiling from 4m to 8m, so that the
D occupants of these seats are below the stratified hot air layer under the roof reduce the
E
area of the outer transparent membrane layer at the sides so as to enlarge the opening
S
for natural ventilation.
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R Wind conditions in the Stadium
U
C
T Wind tunnel measurements were made
U for the external plaza surrounding it, and
R for the concourses and key seating areas
A within. These wind speeds were used in
L assessing pedestrian safety and comfort
S in and around the Stadium . Wind
Y conditions in the Stadium and external
S plaza are generally suitable to strolling or
T for short periods of standing or sitting
E No areas would be uncomfortable for strolling, which was entirely acceptable for the
M intended usage. The results showed wind conditions in the athletic arena during the
S summer months to be, on average, very benign. In addition, wind speed measurements
& were made over the turfed areas of the field so as to develop appropriate turfing
D strategies for the Stadium. If gust wind speeds would exceed around 2m/sec on the
E
track, notably for the sprint and horizontal jumps area would interfere with
S
performance.
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S IN ADDITION, WIND SPEED
T
R MEASUREMENTS WERE MADE
U OVER THE TURFED AREA OF THE
C
T FIELD SO AS TO DEVELOP
U APPROPRIATE TURFING
R STRATEGIES FOR THE STADIUM.
A
L
S ASSUMING ACCEPTABLE
Y VENTILATION TO BE 1-2m/s, THE
S
T
ADJOINING FIGURE SHOWS THAT
E THE SOUTH-WEST AND NORTH-
M WEST CORNER ZONES (ORANGE)
S
& ARE BETTER VENTILATED THAN
D OTHER AREAS OF THE FIELD.
E
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R
U Fire engineering concepts
C
T All viewing accommodation spaces are separated
U from adjacent areas or voids, and all the
R stairways, dormitories, and passageways were
A designed to comply with the Chinese codes. The
L concessions and high-risk areas are protected
S locally by using the cabin concept, which
Y makes use of sprinklers, smoke barriers and a
S dynamic smoke control system. It was concluded
T that additional fire protection was only needed
E for the critical structural steel roof members
M within 6m of the spectators. Most of the
S structural members of the roof, therefore, did
& not require fire protection.
D
E
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR
S
T
R
U The retractable roof design
C
T Development of this concept
U led to a retractable roof
R structure that reflected the
A seemingly irregular Birds
L Nest structure of the fixed
S roof.
Y . Its design dominated much of
S the Stadiums early The retractable roof concept
T development before it was
E finally omitted as a cost-saving
M measure in June 2004, due
S both to the rising cost of steel
& and political pressures to keep
D the Olympic budget under
E control.
S
I
SRISHTI
G SUSHANT SCHOOL OF ART AND SUGANDH
VARTIKA
N ARCHITECTURE, GURGAON, HARYANA YASHPRIYA
ZORAWAR