July 2007
PM
team
Planning & design
team
Site acquisition
project team
Equipment system
Optimization team
engineers.
team
Civil work design
implementation team
Auxiliary products
implementation team
Telecom equipment
implementation.
Responsibilities: In the period from Site engineers (1N)
receipt of the site building permit and
design drawings to the power-on
completion of hardware equipment,
the site engineer must be responsible
for planning, progress, quality, safety
and on-site construction management
of the site civil work, and must
supervise and manage the installation
of equipment hardware.
President of the
region
Operations Support
HR Dept.
Dept.
Information Security
Finance Dept.
Management Office
Product Marketing
Development Dept.
Qualification Dept.
Market Finance Dept.
Technical Service
Public Relations
Sales Management
Commercial Affairs
Support Dept.
Supply Chain
Procurement
Key Project Dept.
Marketing
Business
Dept.
Dept.
Dept.
Dept.
Dept.
Representative office 1
VIP CGMD
President of the
region
Four functional
President of the departments of the
regional division regional division
Representative
Representative
Representative
Representative
Representative
office 4
office N
office 1
office 2
office 3
Representative
Vice representative
Operations Support HR Dept.
(cadre)
Dept.
Qualification Dept.
Technical Service
Product Marketing
Market Finance
Relation Dept.
support Dept.
Supply Chain
Procurement
Government
Marketing
CGMD
Dept.
Dept.
Dept.
Dept.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10
Organizational Environment That the Site Implementation Managers Are Located in
Technical Service Dept.
of the region
PM
Regional PM
each product line
Dept.
Issues related to recruitment, remuneration to site engineers, internal HR Dept. of the representative
incentive, and so on office
Issues related to office equipment, construction tools, vehicles, and so on Administrative Dept. of the
representative office
Goods issues (issues related to international transport and customs clearing Logistics Manager
of materials, warehouse management, and goods allocation)
Acceptance
managemen
t Schedule control
Materials
Demonstration
management What site and section
should I
do?
Changes
Quality
managemen
management
t
Management of Safety
documents on site Subcontractor
management management
construction
Read them as soon as possible to learn the general policies and the policies
Requirement on subcontract and project management
Hold a contract clarification meeting to comprehend the contract better
Site model
Focus on
Construction specifications
Schedule, delivery milestone, and punishment and liability for delay
Composition of civil work cost
Force majeure
Clauses concerned with changes
Excerpt the major clauses and pass them to all members concerned in the
Important project team
Notify the project manager of the infeasible clauses and those that may bring
about loss to Huawei
Establish a system of competition and last elimination, staffing the project with one to two more site
Staffing
engineers
engineers
Site construction process (refer to the company-released process and tailor it for the project)
Site engineers manual (refer to the company-released process and tailor it for the project)
Training Guide to site acceptance (refer to the company-released process and tailor it for the project)
Guide to safe construction of sites (refer to the company-released process and tailor it for the project)
Quality management of the sites (refer to the company-released process and tailor it for the project)
Internal management system and operation process of the project team (drafted by the project team)
Read the contract carefully to fully understand the promised delivery scope,
Make a sub-plan responsibility interface of delivery and key milestones of delivery
for the civil work
Fully communicate with the project manager and control manager to learn the delivery
policies of the whole project
Fully communicate with the customer, local subcontractor and local employees to learn
the delivery environment and characteristics. In the communication, focus on:
1) The period of time when the civil work implementation is affected
Schedule control
Make a sub-plan Determine which sites are built first and which are built later, and guarantee the
for the civil work resource for these sites;
Work with the subcontractor to make a schedule for the key milestones of each site
Take the local special delivery environment into account;
If the subcontractors promise or the plan for arrival of materials cannot satisfy the
requirement of the master plan, report this situation to the CEG and cause the CEG to
Schedule control
seek more subcontractors. Additionally, drive the logistics department to resolve the
problems of materials arrival;
Site rollout and
delivery plan While assigning sites to the subcontractors and site engineers, note that:
1) The number of sites assigned to each subcontractor cannot exceed the ratio fixed
in the bid evaluation result of the CEG. If the number breaks through the ratio for
any special reason, apply to the CEG department through an internal memo;
2) The sites assigned to a subcontractor must be located in the same region and on
the same traffic line. The sites of a high priority level must be assigned to a
subcontractor of high qualification;
Supervise the
schedule 3) The sites assigned to a site engineer must be centralized in the same region and
execution on the same traffic line, and managed by one subcontractor.
Make a sub-plan
for the civil work
CW forecast
Arrange a check of the resource preparation, and cause the issues to be resolved;
If the plan delivered deviates from the specific implementation plan so greatly that the
Site rollout and
construction task cannot be complete, report this situation to seek for a solution;
delivery plan
Follow up on the reported result every day. Meet the site engineers and the
subcontracts routinely at least once each week to analyze the quality and progress;
For a delayed working procedure of a site, the subcontractor must rush through the
work to catch up with the schedule;
On each day, summarize the latest construction situation and send it to the business
module concerned or input it in the server for it to be shared by all modules;
Supervise the
Set more dense supervisory points than those fixed in the rollout table to control the
schedule
execution civil work progress of the site and get command of the statue quo of site
implementation. Supervise the civil work progress with the small tool in the CW
forecast attached above in this page.
Supporting Guide to Preparation before Network Planning Guide Site Acquisition Process Site Design Process
Process or
Guide Project Kickoff
Review the project planning Review the network planning Review the site preselection Review the typical module
Key quality Build a general model site design
activities TSSR review
Training before project kickoff
Review the design document
Determine the project quality Acceptance of site acquisition
standard and acceptance
criteria
A Site building Engineering survey Equipment Acceptance to Mainte
installation maintenance nance
Supporting Process of Building Wireless Sites on Site Survey Process Equipment Installation Process Process of Transferring
Process or Ground Surface Acceptance to Maintenance
Guide
Review of the material requirements Review the Survey On-site inspection of goods Acceptance test
Key quality
Quality inspection of concealed works Report Hardware installation check Review of the cutover
activities
Quality inspection of construction of Software installation check scheme
outsourced auxiliary products Documents review
Determine
the quality The activities of project
standard
quality management run
through the whole process
Count, analyze Build a
and clear the
of project implementation.
demonstrative
quality issues site The six quality activities
Site listed on the left are key
implementation
points of quality control.
manager
Random Training of A project will be
inspection of subcontractors and implemented at good
quality by site site engineers before
engineers project kickoff quality if the six key points
of quality control are
100% self-check executed well.
of construction by
subcontractors
Before
implementation Kickoff Implementation Acceptance
(resource meeting (implementation (acceptance
establishment) management) and payment)
Awards received
Experience and background Machine to be used
of the responsible person
Past experience in
similar projects Work and
technical force
Schedule and
Management skills
measures to keep
Material
up with the
s
schedule
Kickoff Meeting
Chairperson: Huawei project manager or implementation manager
Participants: design, logistics and site engineers concerned, subcontractors
Agenda of the kickoff meeting:
Joint review and technical clarification of the design;
Discuss and adopt the Design of Construction Organization and General Schedule
submitted by the subcontractors;
Determine the checking criteria, checking list and acceptance scheme;
Confirm that the construction personnel and machine are ready, and fix the date of
commencement;
Hand over the Building Permit to the subcontractors, if necessary;
Determine the mode of communication.
The person appointed by Huawei must prepare the Minutes of Meeting on the spot and have it
signed by three parties.
Assignment principle:
The sites assigned to a subcontractor must be located in the same
region;
The sites in a region must be assigned to two or more subcontractors;
The number of sites assigned to a subcontractor in one attempt under a
PO must take the subcontractors production capacity into account.
Generally, one to two sites over a subcontractors maximum production
capacity can be assigned to the subcontractor.
One site engineer must be appointed to manage the sites assigned to a
subcontractor.
Site design documents, including all the records on design changes and on the design
1
documents obtained by each subcontractor
2 BOQ of the site
3 Self-check List of Key Actions in Site Construction
4 Site Quality Checklist, including the acceptance records on concealed works
5 Record on Safety Inspection of the Site
6 Change records
7 Pictures evidencing the site clean-up
8 Pictures evidencing the site quality and safety issues
9 Preliminary Acceptance Record of the Site
10 Records on negotiation with the subcontractor
11 Inspection Report on the Test Block
Changes Management
Tower materials are first needed by the civil work of each site, but have a long
lead
time and construction period. They require close attention in a project.
Design the towers into unified patterns to reduce the tower types;
Locally purchase the towers or the first batch of towers;
Require the tower suppliers to first produce and deliver anchor bolts;
It is suggested that the project team should purchase the tower supervision
service;
The site implementation manager can use the small tool of tower management;
Refer to the document Site Ready For Tower vs Delivery FC attached.
In purchasing diesel generators, confirm with the customer the brand, technical
specifications and other technical parameters of the selected diesel generator shelter, and
pay attention to the local after-sales service capability of the selected diesel generator
suppliers.
ATS is available in a wide variety, the auxiliary materials set forth in the purchase order must
be correct;
Confirm with the customer the technical specifications of the auxiliary materials after the
contract is concluded but before Huawei places a purchase order of material preparation;
Cement, sandstone and reimbursement bars are generally provided by the subcontractors.
Check these materials;
For key materials, appoint a person to specially review the electronic packing list before the
delivery to ensure the goods to be delivered agree with the purchase order placed earlier.