SUMMER TRAINING 2017

B.L. MANTRI & ASSOCIATES P. LTD


(From 19st May 2017 to 20th June 2017)

SUBMITTED BY:
LAXMI LAL DANGI
Roll no.:14EGICE031

Civil Engineering Department


GEETANJALI INSTITUTE OF TECHNICAL STUDIES
UDAIPUR, RAJ.
B.L. MANTRI
& ASSOCIATES P. LTD
ENGINEERS, ARCHITECTS & VALUERS
B.L. MANTRI & ASSOCITAES P. LTD

OWER - Mr. B.L. MANTRI

CIVIL ENGINEER – Mr. ASHOK JAIN

ARCHITECT- Mr. ABHINAV MANTRI


Mr. ASHISH UPADHYAY

SITE ENGINEER- Mr. ARUN TRIPATHI


Mr. HARSH
Site location

GANNA HOUSE
AASHA DHAM

MEHTA HOUSE
ARC GATE
SITE PLAN

GROUND FLOOR PLAN


GROUND FLOOR PLAN (Dr. MEHTA HOUSE PLAN)
(GANNA HOUSE PLAN)

OFFICE PLAN FOR CENTER LINE PLAN


(ARC GATE) (AGGRESIVE BLOCK)
FOUNDATION
SPECIFICATIONS
ISOLATED FOOTING
(GANNA HOUSE)
ISOLATED FOOTING

10 MM# @5” C/C


Slope -45 degree
P.C.C. – 1:4:8 (M7.5)

FOOTING SIZE- 6’-6” X 6’-6”

WHY WE USE ISOLATED FOOTING ?


Isolated footing is one of the
shallow foundation
It is slopped to spread the load
over a large area
Workmen with little or no
knowledge can easily constructed an
isolated footing
PLINTH BEAM
Why plinth beams are used ?
 To avoid differential settlement

 To maintain the plinth plane proper

 To connect all the columns if depth of


foundation is high

 To avoid difficulties in construction of


walls. 250
(plinth beam)

6-16#
400

Covering concrete surfaces with


gunny bags for curing
Column details
Column size 9” x 18”
No. of column =40 16mm# 16mm#
Ties spacing 8”# - 8”c/c

If the distance between two bar’s are more


than 3oo mm than we provide a extra ties in
column. 20mm#

Ties 8mm#

C1 9”X 18” C2 9”X 18”


4- 16 MM# 4- 16MM# 4-20MM#

Lacked ties
Master ties
STARTER
Why is a starter used in a column?
The name itself suggest that it’s
a start point

Starter helps mainly to adjust


the form work of a column
vertically.

It is castes in such a way that


equal cover is left around the
reinforcement bars

Starter width 4”
BAR is bend when it is
lapped with other bar
to maintain
Straightening in steel
Bars.
COVER

 COVER IS USED TO
PROTECT
THE REINFORCEMENT FROM
CARROSION

 AND TO PROVIDE FIRE


RESISTANCE TO BAR

COVER 25mm
SUNK
• It is used to grounding
sanitary pipe & W.C.

• Pots is used to fill sunk

• Generally depth 200 mm


300 mm and depending
on design

SUNK
TAMPING ON THE CONCRETE
STRUCTURE

PURPOSE-FOR THE SAFE PLASTER


ALSO FOR BONDING WITH
COLUMN & WALL
Plinth beam shuttering calculation
S.No. Shuttering For No. Of Length Width Height Total area (sq.ft)
Similar
1 Plinth beam 4 50’3” , 15” 251.25
2 Plinth beam 6 15’ , 15” 112.5
3 Plinth beam 2 17’ , 15” 42.5
4 Plinth beam 4 14’3” , 15” 71.25
5 Plinth beam 2 112.5’ , 15” 281.25
6 Plinth beam 3 12’ , 15” 45
7 Plinth beam 4 8’9” , 15” 43.75
8 Plinth beam 2 7’6” , 15” 18.75
9 Plinth beam 4 42’6” , 15” 212.5
10 Plinth beam 1 19’6” , 15” 24.375
11 Plinth beam 2 3’6” , 15” 8.75
Total area (one side)=1111.875 sq. ft
Total area (both side)=2 x 1111.875= 2223.75 sq. ft
Shuttering market rate=25 Rs. (sq. ft)

Total Rs.= 55594 Rs.


FOUNDATION CALCULATION
Volume of concrete ?

450 X 450mm
FOR A1
V= h/3 (a1+a2+√𝑎1𝑎2)
a1 =3000*3000= 9 m^2 75mm
a2 =600*600 = 0.36 m^2
A1
h= 0.75m 750mm

FOR A2 150mm
A2 300 mm

V= L*B*H
A3 150 mm
V=3000*3000*300=2.7 m^3
3000 x 3000 mm
FOR A3
V=3300*3300*150=1.63 m^3

Total volume= 2.79+2.7+1.63 = 7.12m^3


Calculate unit weight of steel ?

𝑑^2
Unit weight = * R.M.L.
162

TOTAL NO. OF BARS 4-20mm#

=4 x(20*20/162) x3.04

= 30.02 Kg

20mm#
BEAM DETAILS
(Dr. MEHTA HOUSE)
BAR BENDING SCHEDULE
(BBS) BAR BENDING SCHEDULE
CENTER LINE PLAN

project- proposed aggressive block for


AASHA DHAM
AT- HAWALA, BADI UDAIPUR
COLUMN MARKING AT SITE

REINFORCEMENT CHECK AT SITE


AUTODESK REVIT 2017

ETABS 2016
SOFTWARE TRAINING

STADD FOUNDATION
AUTODESK REVIT 2017
ETABS 2016
CERTIFICATE
THANK YOU