You are on page 1of 10

Cellcard Project SWAP Scenario

Connect External Alarm Cable


Dry-
contact Dry-contact Cable Color External Alarm Severity
1. Disconnect existing Huawei external alarm No. Cable No.

cable and make labelling. 1 SA3-1 White Green Mains Failure Critical

2. Connect ZTE external alarm cable according


2 SA3-1 White Brown Rectifier Failure Major
to the follow definition.
3. Report to war room confirm the status. 3 SA3-1 White Gray Low DC Voltage Major

4 SA3-1 Red Blue High DC Voltage Major

High Temperature
5 SA3-1 Red Orange Critical
(Aircon site)

6 SA3-1 Red Green Cabinet Door Critical

SA3-1 Equipment Room


7 Black Blue Door Critical

8
SA3-1
Black Orange Smoke Major
Indoor
SA3-1
9 White Blue Water Major

SA3-1
10 White Orange DG On Major

SA3-1 High Temperature


11 Black Green (Non-Aircon site) Critical

© ZTE Corporation. All rights reserved


2
Connect External Alarm Cable
1. Disconnect existing Huawei external alarm
cable and make labelling.
2. Connect ZTE external alarm cable according
to the follow definition.
3. Report to war room confirm the status.
Outdoor
Dry- Dry-
contact Dry-contact
Cable No. Cable Color External Alarm Severity contact Dry-contact
Cable No. Cable Color External Alarm Severity
No. No.

1 SA3-1 White Blue Mains Failure Critical 1 SA3-2 White Blue Equipment Room Critical
Door

2 SA3-1 White Orange Rectifier Failure Major 2 SA3-2 White Orange Smoke Major

3 SA3-1 White Green Low DC Voltage Major 3 SA3-2 White Green Water Major

4 SA3-1 White Brown High DC Voltage Major 4 SA3-2 White Brown DG On Major

High Temperature High Temperature


5 SA3-1 Red Blue Critical 5 SA3-2 Red Blue Critical
(Aircon site) (Non-Aircon site)

6 SA3-1 Red Orange Cabinet Door Critical 6 SA3-6 Red Orange RESERVED

© ZTE Corporation. All rights reserved


3
Dry Contact Cable Connection of the
SA3 boards and DDF (indoor)

If SA3 board is used, 16-


core dry contact cables are
used. The DB44 connector
at end A of each cable is
connected to the B3
interface of the SA3 board
of the BBU device
DDF

© ZTE Corporation. All rights reserved


4
Dry Contact Cable Connection of the
SA3 board and LPU (outdoor)

If SA3 board are used, 16


dry contact signal inputs DDF
can be connected. Eight of
them are connected to the
MON IN/OUT.GO interface
of the LPU and the other DDF
eight are connected to the
E1/T1.GO interface of the
LPU through one-to-two
adapter cables

© ZTE Corporation. All rights reserved


5
Description of the Core Wires of
a 16-Core/8-Core Dry Contact Cable
16-Core
8-Core

© ZTE Corporation. All rights reserved


6
Cable connection order for FS board and PDU
FS board fiber cable connection sequence start from Right to Left.
1-st Connect 1800 Mhz RRUs, then 2100 Mhz RRUs,
then 900 Mhz RRUs then other additional RRUs.

900 Mhz RRU 2100 Mhz RRU 1800 Mhz RRU

PDU board DC cable connection sequence start from Right to Left.


1-st Connect 1800 Mhz RRUs, then 2100 Mhz RRUs,
then 900 Mhz RRUs then other additional RRUs.

900 Mhz RRU 2100 Mhz RRU 1800 Mhz RRU

© ZTE Corporation. All rights reserved


7
Cable connection order for FS board

© ZTE Corporation. All rights reserved


8
© ZTE Corporation. All rights reserved
9
Thank you!