ORIENTATION­SEMINAR ON PROJ.

 PLANNING, 
DESIGN, CONSTRUCTION MNG’T & WORK 
PERFORMANCE PLANNING
RTC, SOLANA, CAGAYAN
September 25-26, 2014

BASIC DESIGN OF DAMS 
AND THEIR APPURTENANT 
BY: REY R. VISAYA
STRUCTURES Planning & Design Section,
E & O Division­REGION 02
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Dam structures commonly used by NIA 
to divert and store water for irrigation
• Diversion Dam
•   Storage Dams and Reservoirs
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Classification of Dams According to  Height and  Size

Small dams  =height of 15.00 m. & below and 
storage capacity of 3.00 mcm

Large dams =  height of more than 15.00 m. 
&  with storage capacity above 3.00 mcm. 
(usbr/icold)
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Classification of DAMS according to materials used:

1. Earthfill dams
 1.1      Homogeneous dams
 1.2     Modified homogenous dams
1.3     Zoned earth dams

2. Rockfill dams
2.1    Central earth core
2.2    Sloping earth core
2.3    Diaphragm type
2.3     Concrete faced rockfill dams
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Classification of DAMS according to materials used:

3. CONCRETE/RUBBLE masonry DAMS

3.1     Gravity dams
3.2     Arch dam
3.3    Buttressed dams

4. Composite dams

4.1     Concrete and Earth Embankment
4.2    Concrete and Rockfill
4.3    Concrete, Rockfill and Earth Embankment
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Classification of dams according to construction methods

1. Conventional mass concrete construction (cmc)


2. Conventional rubble masonry construction (crmc)
3. Roller compacted concrete construction (rcc)
4. Hardfill construction
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

DIVERSION DAM AND ITS


APPURTENANT
STRUCTURES
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

(1) INVESTIGATION/UNDERSTANDING OF SITE


CONDITIONS

• Service area
River discharge
• River conditions River water
surface
• Flood conditions elevation
Drainage Area
• Other users:
irrigation, water supply, etc.

• Topographical conditions

• Geological conditions

• Environmental considerations

• Construction requirements
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

(2) BASIC DESIGN DATA

• SURVEY DATA
• GEOLOGIC/GEOTECHNICAL DATA
• HYDROLOGIC DATA
• ENVIRONMENTAL AND SOCIAL STUDIES DATA
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

(3) CONSIDERATION FOR SITE SELECTION OF DIVERSION


WEIR

• STABLE (IMPERVIOUS OR PERVIOUS) FOUNDATION (IDEAL)


• SHORT DIVERSION CANAL TO SERVICE AREA
• LOW WEIR HEIGHT AND OR HIGHER RIVERBANKS FOR GUIDE
BANKS/AFFLUX DIKES
ANCHORAGE
• STABLE WATERWAY WIDTH
• STRAIGHT RIVER CHANNEL
• ACCESSIBILITY
• ADEQUATE WATER SUPPLY OF SOURCE
• ENVIRONMENTAL CONSIDERATION
• AVAILABILITY OF CONSTRUCTION MATERIALS
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

TYPES OF DIVERSION STRUCTURES


    CREST SHAPE ADVANTAGE DISADVANTAGE
  FIXED-CREST

    Trapezoidal (Sloping)   Prevents accumulation   High velocities require long 


type of sediments D/S protection works
   

    Core wall  Economical  Concrete walls subject to 


damage by boulders
    Ogee  Efficient discharges  Not applicable for steep 
 Stable during flood slopes
  MOVABLE CREST Gated/Barrage  Back water effect is   Maintenance of gates
avoided during floods  Sedimentation would cause 
operation problems
    Rubber Dams  Fast and efficient way    High initial cost
of operation to avoid   May not be safe for sites 
upstream flooding with peace and order issues

 
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

COMPONENTS OF DIVERSION DAM STRUCTURE


• INTAKE
• MAIN DAM OR WEIR
• SLUICEWAY
• GUIDE BANKS AND AFFLUX DIKES
• TRAINING WALLS
• FISH LADDER
• SILT EXCLUDERS/EJECTORS
• ELECTRO-MECHANICAL FACILITIES
• APRON (U/S AND D/S PROTECTION WORKS)
• U/S AND D/S CUT-OFF WALLS
SLUICEWAY TOWER

TOP OF PIER D/S T.B. U/S T.B.


FOOTWALK

DOWNSTREAM
ST
APRON DAM CRE
INTAKE
SLU TRAINING WALL
ICE RON
WA AP
Y S TREAM
UP
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

 STEP BY STEP GUIDE/PROCEDURE ON THE DESIGN OF DIVERSION 
DAM :1. SET DAM CREST ELEVATION BASE HPIA
 2. SET INTAKE INVERT ELEVATION AND DETERMINE SIZE OF INTAKE SECTION
 3. SET PRELIMINARY U/S AND D/S APRON ELEVATION
 4. ESTIMATE CREST LENGTH (Pw=4.83(Q)^.5)
 5.  ESTIMATE SLUICEWAY WIDTH, INTAKE POCKET WIDTH  AND LENGTH OF    
TRAINING WALL,SKIMMING WEIR
 6. PLOT TAILWATER RATING CURVE
 7. DETERMINE LOOSENESS FACTOR  (Lf) AND ESTIMATE DEPTH OF SCOUR
 (LF = of Actual water way width/Pw) 
 R= 0.473 (Q/f)^1/3 Lf>1
 R=1.35 (q^2/f)^1/3 Lf<1
 8.ESTIMATE  AFFLUX ELEVATION
 9.SET U/S AND D/S GUIDE BANKS ELEVATION
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

 9. SET DEPTH OF U/S AND D/S CUT-OFF WALL
 10. SELECT APPROPORIATE LEFT AND RIGHT ABUTMENT PROTECTION 
 (RETAINING WALL OR INCLINED RIVETMENT)
 11.DETERMINE LENGTH OF U/S AND D/S APRON
 12. DETERMINE SIZE OF U/S AND D/S RIPRAP PROTECTION
 13. CHECK STABILITY OF FOUNDATION MATERIALS(PIPING, BEARING CAPACITY)
 14. ESTIMATE UPLIFT AND SURFACE PRESSURE
 15. ESTIMATE THICKNESS OF U/S AND D/S APRON
 16. UNDERTAKE DAM AND SLUICEWAY STABILITY ANALYSIS (SLIDING & 
OVERTURNING)
 (AFTER CONSTRUCTION W/ OR W/O SEISMIC , NORMAL OPERATION W/ OR W/O 
SEISMIC , FLOOD)
 17. UNDERTAKE STRUCTURAL DESIGN CALCULATION FOR EVERY STRUCTURE 
(E.G. RETAINING WALL, SLUICEWAY TOWER, INTAKE TOWER, DAM BODY, 
ABUTMENT WALLS)
 19. PREPARE DETAILED DESIGN PLANS AND DRAWINGS
 20. PREPARE DESIGN REPORT
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Trapezoidal Weir
ALUCAO ESTE/WESTE CIS,BUGUEY, CAGAYAN
BALLASIW CIS, GONZAGA, CAGAYAN
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Core-wall/SILL Weir
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

GEOMETRIC FIGURE OF OGEE TYPE DAM BODY


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

OGEE TYPE Diversion dam with inclined intake gate


DRIS, GATTARAN, CAGAYAN
COMPLETION STAGE
THE RUBBER DAM CAN BE DEFLATED WHENEVER FLOOD
WILL OCCUR

MOVABLE WEIR
RUBBER DAM
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

ABUKUMA JAPAN BARRAGE TYPE WEIR


MOVABLE WEIR TYPE-GATES CAN BE EASILY OPENED DURING
FLOOD
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

BASIC DESIGN PROCEDURE OF


STORAGE/RESERVOIR DAMS
EARTHFILL EMBANKMENT DAMS
TRAINING COURSE ON RICE IRRIGATION SYSTEM DESIGN
Almont Inland Resort, J.C. Aquino Ave., Butuan City

RESERVOIR/STORAGE DAMS
 TYPES OF STORAGE DAMS ACCORDING TO USE:

-DOMESTIC WATER SUPPLY,IRRIGATION,


HYDROPOWER
-MULTIPURPOSE DAM
TRAINING COURSE ON RICE IRRIGATION SYSTEM DESIGN
Almont Inland Resort, J.C. Aquino Ave., Butuan City

EMBANKMENT
RESERVOIR DAMS
TRAINING COURSE ON RICE IRRIGATION SYSTEM DESIGN
Almont Inland Resort, J.C. Aquino Ave., Butuan City

HOMOGENEOUS
EARTHFILL DAMS
A homogeneous dam is composed of a single kind of well-graded
earth material and sufficiently impervious to provide an adequate
water barrier .
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Homogeneous earthfill dam with horizontal rock toe


drain on impervious foundation
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Homogeneous earthfill dam


BAGUNOT SWIP,GATTARAN, CAGAYAN
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Homogeneous earthfill dam


PAGASA SWIP,SOLANA, CAGAYAN
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

ZONED
EARTHFILL
DAMS
In a zoned embankment dam, the main water
retention structure is an impervious core
composed mostly of clay materials.
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

PANTABANGAN DAM COMPLEX, Pampanga & Aya Rivers


Nueva Ecija, Philippines
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

PANTABANGAN DAM, Pampanga & Aya Rivers


(Spillway)
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

CALANGO SRIP DAM, Zamboanguita, Negros Oriental,


Philippines
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

CALANGO SRIP DAM, Zamboanguita


Negros Oriental, Philippines
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

ROCKFILL
DAMS
A rockfill dam is one that relies on rock as a
major structural element.
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Earth core rockfill dam section with central core


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

TOKUYAMA ROCKFILL DAM


JAPAN
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MAGAT
TOKUYAMA
DAM, Magat
ROCKFILL
River,
DAMIsabela,
Philippines
JAPAN
(Spillway)
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MAGAT DAM COMPLEX


Magat River & Baligatan Creek, Isabela,
Philippines
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MAGAT MAIN DAM


Magat River, Isabela, Philippines
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MAGAT DAM, Magat River, Isabela,


Philippines
(Spillway and Plunge Pool)
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MAGAT DAM, Magat River, Isabela,


Philippines
(Crest of the Main Dam)
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

SURIKAMIGAWA JAPAN ROCKFILL DAM


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

SURIKAMIGAWA JAPAN ROCKFILL DAM


INTAKE BRIDGE
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

• CONCRETE DAMS
1.Concrete gravity dams
2.Arch dams
3.Buttressed dams
4.Roller-compacted/hardfill
concrete dams
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

CONCRETE
GRAVITY
DAMS
A concrete gravity dam resists the applied load
primarily by its own weight.
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MIHARU JAPAN CONCRETE DAM


RESERVOIR AREA
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MIHARU JAPAN CONCRETE DAM OFFICE


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MIHARU JAPAN CONCRETE DAM


ELEVATOR AND DRAINAGE GALLERY
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

KAMIFASU JAPAN CONCRETE DAM


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

JOZANNKEI CONCRETE DAM


HOKKAIDO, JAPAN
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

CONCRETE
ARCH DAMS
In this type of dam, a major part of the hydrostatic load
imposed by the reservoir acts on the concrete slab,
which comprise the main dam body, and is transmitted to
the canyon walls by horizontal thrust.
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Arch dam section (top view)


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

NUKUI ARCHDAM
JAPAN
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

NUKUI ARCHDAM SPILLWAY PLATFORM


JAPAN
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

HOOVER DAM, Colorado River, USA


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

CHUBETSU JAPAN ARCHDAM


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

BUTRESSED
DAMS
Buttress dams depend principally upon the weight of
the water in addition to the concrete weight for stability.
They are composed of two structural elements: a
sloping water-supporting deck and buttresses that
support the deck.
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

DANIEL JOHNSON DAM, Manicouagan


River, Canada
(Section)
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

DANIEL JOHNSON DAM, Manicouagan River, Canada


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MAGBALLO-BALICOTOC-CALUMNAY DAM, Negros Occidental,


Philippines
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MAGBALLO-BALICOTOC-CALUMNAY DAM, Negros


Occidental, Philippines
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

ROSELAND DAM
Doron de Beufort River, France
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

ROLLER-COMPACTED /
HARDFILL CONCRETE
DAMS
In this type of dam the concrete is placed in
layers and compacted by rollers
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Roller-compacted concrete dam


placement
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

Roller-compacted concrete dam (compaction)


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

MIDDLE VAITARNA DAM, Vaitarna River, India


(Roller-compacted concrete dam)
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

CAN-ASUJAN RIVER DAM, Carcar, Cebu, Philippines


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

CAN-ASUJAN RIVER DAM, Carcar, Cebu, Philippines


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

CAN-ASUJAN RIVER DAM, Carcar, Cebu, Philippines


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

THREE GORGES DAM, Yangtze River, China


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

COMPOSIT
EDAMS
THIS TYPE OF DAM IS USUALLY A COMBINATION OF
ZONED EARTHFILL DAM,CONCRETE DAM&ROCKFILL DAM
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

CHUBETSU COMPOSITE DAM, SAPPORO, JAPAN


ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

VIEWDECK
CHUBETSU COMPOSITE DAM, SAPPORO, JAPAN
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

BASIC DESIGN PROCEDURE


FOREARTHFILL
RESERVOIR DAMS
EMBANKMENT DAMS
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

 A. PREPARATION,PRODUCTION, COLLECTION COLLATION AND REVIEW OF INITIAL DESIGN DATA DERIVED FROM PROJECT
INVESTIGATION REPORT/FSR :
 FSR:
 LAND RESOURCES STUDIES
 GEODETIC SURVEY MAPS
 HYDROMETEOROLOGICAL STUDIES/HYDROLOGY STUDIES
 GEOLOGIC/GEOTECHNICAL STUDIES
 ENVIRONMENTAL AND SOCIAL STUDIES
A.1 DETERMINE VALIDATE LAND RESOUCES DATA (LAND CLASS AND LAND USE MAPS)
A.2 PREPARE/PRODUCE MAPS AND REVIEW SURVEY DATA: 
A.3 CONDUCT/REVIEW OF  HYDROLOGICAL STUDIES
A.4 REVIEW  AND ASSESS THE GEOLOGICAL AND GEOTECHNICAL INVESTIGATIONS DATA
A.5 UNDERTAKE/REVIEW MATERIAL INVESTIGATIONS AND TESTING
A.6 PREPARE ENVIRONMENTAL IMPACT MITIGATION AND SOCIAL MEASURES
A.7 UNDERTAKE HAZARD AND RISK ASSESSMENT (FLOOD, SEISMIC,GEOLOGIC, RTE, STRUCTURAL AND MAN MADE 
HAZARD
B. PREPARE DAM LAYOUT AND UNDERTAKE DESIGN CALCULATIONS:
B.1  FINALIZE DAM AXIS LOCATION AND ALIGNMENT, PREPARE LAYOUT PLAN OF DAM AND  APPURTENANCES AND 
FOUNDATIONS BASED ON ASSESSMENT OF THE TOPOGRAPHY, GEOLOGY AND  AVAILABILITY OF CONSTRUCTION 
MATERIALS AT PROPOSED DAMSITE AND SET DEAD STORAGE ELEVATION
B.2 PREPARE PRELIMINARY DAM SECTION/CONFIGURATION LAYOUT AND DAM SECTION DESIGN
B.3 ESTABLISH LOADING CRITERIA AND DESIGN PARAMETERS (FLOOD AND EARTHQUAKE LOADINGS)
B.4 UNDERTAKE FLOOD ROUTING FOR OUTLET WORKS AND SPILLWAY TO ESTABLISH HEIGHT OF COFFERDAM, SIZE OF 
OUTLET WORKS,LENGTH OF SPILLWAY AND SURCHARGE STORAGE
B.5 ESTABLISH DAM CREST ELEVATION AND WIDTH
B.6 UNDERTAKE/CALCULATIONS OF DAM STABILITY OR EMBANKMENT SLOPE STABILITY ANALYSIS FOR THE  
FOLLOWING LOADING CONDITIONS (U/S AND D/S SLOPES WITH OR WITHOUT EARTHQUAKE)
B.7 UNDERTAKE DESIGN OF SPILLWAY AND RELATED APPURTENANCES/ELEMENTS
B.8 UNDERTAKE DESIGN/REVIEW OF OUTLET WORKS AND RELATED STRUCTURAL ELEMENTS, MEMBERS, CONTROL 
SYSTEM AND APPURTENANCES
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

 C. DETERMINE, SELECT, AND PREPARE THE REQUIRED/APPROPRIATE DAM, RESERVOIR AND WATERSHED
MONITORING INSTRUMENTATION FACILITIES
 C.1 COMMONLY USED (Eartfill/rockfill embankment) DAMS
 - STANPIPE PIEZOMETERS
 - PNEUMATIC PIEZOMETERS\
 - OBSERVATION WELLS
 - SEEPAGE INTERCPTOR/COLLECTOR CHANNEL AND FLOW RATE MEASURING WEIRS
 - SURFACE MEASURING POINTS, COLLIMATION POINTS AND REFERENCE BENCHMARKS
 - SEISMIC MONITORING APPARATUS (STRONG MOTION SEISMOGRAPH)
 C.2 WATERSHED, RESERVOIR AND HAZARD MONITORING AND WARNING INSTRUMENTATION
 - SEISMIC MONITORING INSTRUMENTS
 - HYDRO-METEOROLOGICAL MONITORING INSTRUMENTS (MINI-WEATHER STATION), RAINFALL 
GAGE TELEMETRY TRANSMISSION 
 - RESERVOIR WATER SURFACE LEVEL MONITORING INSTRUMENTS
 - SEDIMENTATION MONITORING RANGES/STATIONS
 - FLOOD WARNING SYSTEMS
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

 D. UNDERTAKE DESIGN OF ACCESS/SERVICE ROADS ELEMENTS AND OPERATION AND MAINTENANCE


ACCESS ROAD TO DAM APPURTENANCES AND SAFETY FACILITIES
 E. PREPARE DETAILED DESIGN DRAWINGS
F. SUGGESTED DRAWING ARRANGEMENT,SEQUENCE AND CHRONOLOGY
I. COVER SHEET
II. TABLE OF CONTENTS
III. DRAWING SHEETS
1. GENERAL
2.HYDROLOGY
3. SURVEY
4. GEOLOGY/GEOTECHNICAL
5.CIVIL WORKS 
6. DAM INSTRUMENTATIONS
7. ACCESS/SERVICE ROADS
8. MECHANICAL GATES , LIFTING MECHANISM AND ELECTRICAL CONTROLS
ORIENTATION­SEMINAR ON PROJ. PLANNING, DESIGN, 
CONSTRUCTION MNG’T & WORK PERFORMANCE PLANNING

G. PREPARE DESIGN REPORT


I. INTRODUCTION
II. PROJECT AREA
III. DAM DESIGN CONSIDERATIONS
IV. SPILLWAY
V. OUTLET WORKS 
VI. CONSTRUCTION AND OPERATION CONSIDERATION
VII. APPENDICES
VIII. REFERENCE AND BIBLIGRAPHY
IX. FIGURES
X. TABLES
H. PREPARE OPERATION AND MAINTENANCE MANUAL
ORIENTATION­SEMINAR  ON  PROJ.  PLANNING,  DESIGN, 
CONSTRUCTION  MNG’T  &  WORK  PERFORMANCE 
PLANNING
RTC, SOLANA, CAGAYAN
September 25-26, 2014

THE END
REY R. VISAYA
Planning & Design Section,
E & O Division­REGION 02