1. Teaching Objectives
2. General Controlling
1) Organizational structure in Management Accounting .
2) Overview of Management Accounting components
3) Integration within Management Accounting and with other SAP
Applications
4) Concept of FI-CO reconciliation and real time integration
5) Configure Organizational settings and number ranges in CO
5.1 Creating the Controlling Area
5.2 Maintain number ranges for controlling documents
5.3 Maintain versions
6) Configure FI-CO real time integration variant
7) Homework Exercises
8) Solutions
Teaching Objectives
1. Controlling area:
Organizational unit in an organization that represents a closed system
used for cost accounting purposes. A controlling area may contain one
or more company codes, which can operate in different currencies, if
required. The company codes within a controlling area must all use the
same operational chart of accounts.
All internal allocation transactions refer only to objects from the same
controlling area.
2. Operating concern:
An operating concern represents an organizational unit in your
company for which the sales market has a uniform structure. It is the
valuation level for Profitability Analysis (CO-PA).
Overview of Management Accounting Components
6
Integration within Management Accounting and with
other SAP Applications
Concept of FI-CO Reconciliation and Real Time
Integration
The controlling area is the main and highest organizational unit in CO. All
cost objects, such as cost centers, internal order activity types, and
statistical key figures, must have a controlling area assigned. Additionally,
all cost allocations, distributions, and assessments must be performed
within a controlling area and cannot cross between different controlling
areas.
Configure Organizational Settings and Number Ranges in CO
Every time a document is created in CO, the system updates the line
items in the total tables with three different currencies:
Plan
Allows planning values in the version.
Actual
Indicates that the version will receive the actual
transactions from direct or internal postings,
primary postings, and secondary postings. Only
version 000 can be flagged as actual, unless the
version is a delta version or an exclusive use
version.
WIP/RA
Permits Work in Process (WIP) and Results
Analysis (RA) for the version.
Variance
Permits calculation of variances for the version.
Exclusive Use
Indicates that the version is exclusive for some
CO subcomponents, such as Transfer Price, Cost
Estimate in Maintenance Order, Progress Analysis,
Cost Forecast, or Material Ledger.
3. Maintain Versions (Contd.)
After creating the basic settings for the version, you now need to
create the version settings in the controlling area. In the controlling
area settings, you define the options for each year that this version
will be valid, such as the exchange rate type, options for the activity
type rate calculation, and others. To create the version, select the
version on the right side of the screen, and double-click on the
Controlling Area Settings node on the left. The system will ask if
you want to create the version in the controlling area. Click Yes, and
you will see the screen shown below:
3. Maintain Versions (Contd.)
3. Maintain Versions (Contd.)
After you’ve created the controlling area settings, create the year-
dependent setting for the version in the controlling area. Mark the
version on the right side of the screen, and double-click on the
Settings for Each Fiscal Year node. You can either copy a current
entry or create a new one.
The first tab that you will customize is the Planning tab. You will set
the planning options for this version in the selected controlling area.
In the General indicators section, you can see Version Locked,
Integrated Planning, and Copying Allowed checkboxes:
3. Maintain Versions (Contd.)
• Setting the Version Locked indicator means that this version will be
locked for planning purposes for cost centers. If the Integrated
Planning flag is set, the Version Locked setting will also affect the
planning in internal orders and projects.
Question 1. Maintain plan version 1 for five fiscal years from previous FY for your
controlling areas? Ensure you set integrated planning, copying allowed, Integrated
planning with cost centers/bus.processes, Version for ind.act.alloc. as 1, value date
as 1/1/fiscal year
Question 4: Assign controlling area to the number range group for CO settlement
documents?
Question 5: What are the different SAP modules that are integrated with CO?