Radio Network
Optimization Work Flow

ISSUE 4.0 www.huawei.com

RNP Staff Training Dept.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Objectives

After this course, you will:


 Know about the Radio Network
Optimization Work Flow
 Master the key point in the flow
 Make the radio network planning be
more standard and controllable

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 3


RNP&O Service
There are four phases during network lifecycle: Pre-Bidding, Bidding,
Implementation, Maintenance

The RNP&O services are present throughout the network lifecycle, divided by
four parts: Scheme Traction, Radio Network Planning (including Nominal
Planning, Site Selection, Detail Planning), Radio Networking Optimization
(including Initial Tuning, Network Performance Improvement), On-going

Pre- Implementation Maintenance


Bidding
Bidding

Scheme Traction Nominal planning RNP&RNO On-going

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 4


Initial Tuning Procedure
Equipment
Installation
Acceptance Test

Software
Debugging
RNP Service
Parameters
Checking RNP participate
Single Site
Verification
Test and
Analysis (DT)
RF Trouble
Shooting
Test for Comparison
(for swap)
Initial Tuning Report

Engineering Implementation Maintenance


Key Points:
How to find the solution for engineering quality problems and push it
The Initial Tuning must be finished before the network come to commercial use

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5


Initial Tuning Procedure
 Single Site Verification

To check whether the actual engineering parameters and RF parameters are


consistent with the planning result, and whether the service function, as well
as the coverage ability and the antenna installation, is normal or not.
Attention:
• The PM should launch a spot-check to the sites by
5%.
• Alarm data and cells status should be collected
before the drive test.
• ENGINEERING• It is necessary to check whether the software version
PARAMETERSisTABLEsuited or not.
• Hardware and its installation• issues
• Data configuration XXX SITE VERIFICATION TABLE
• Alarm messages • Antennas issues • SINGLE SITE VERIFICATION REPORT
Input • ENGINEERING PARAMETERS TABLE
• Testing instruments
• PROBLEMS TRACING TABLE

Key Point:
How to find the solution for engineering quality problems and push it

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 6


NPI(Network Performance Improvement)

Initial Tuning Acceptance Test

Customers Complaint Resolve


RF Optimization
Interference test and analysis
Neighbor cell planning
RF parameters optimization
VIP user analysis
KPI analysis
Network performance monitoring
Network performance
acceptance test

Implementation Maintenance

Key points:
 The manners and contents of Acceptance test: test by cluster, test the whole network
 It is different between network performance acceptance test and equipment acceptance test. The performance
acceptance test is to check whether the KPI meet the requirement mentioned in the contract.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 7


NPI(Network Performance Improvement)

 RF Optimization

To adjust the engineering parameters and system parameters, to


meet the coverage requirement and control the interference

Attentions:
• Simulative test with load should be taken
for trial network
• Follow the RF and engineering parameters
Engineering parameters tuning scheme
optimization work flow
• ENGINEERING PARAMETER • The optimization
TABLE methods • along
Engineering
the region Parameter table
• Drive Test Data border should be consulted to each other.
• Alarm data/Cells status
• Problems tracing table
• The neighbor cell list setting should be
• Traffic statistic data considered during engineering
• DT and traffic statistic comparison
parameters
• Coverage target range adjusting.
• Hardware and parameters
report after optimization
• All the adjusting should be informed to the
configuration related persons.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 8


NPI(Network Performance Improvement)

 Interference Analysis

The interference is exist during all phases of the optimization process. There
are two sorts of the interference, system internal and external.

• DT result
• Traffic statistic report Attentions:
• Network engineering The parameters
solution responsibility of external
and topographical map interference should be due to the
• User complaint and equipmentcustomers. And the local Radio
alarm data Committee should take part in the
• The antenna configuration
interference clearance if necessary.
• The other related information • NETWORK INTERFERENCE
about the customer Import ANALYSIS REPORT
• Spectrum resource
• Instrument
• The references

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9


NPI(Network Performance Improvement)

 Neighbor cell optimization

Set the suitable neighbor cell list and handover parameters, to ensure
the smooth handover of the network.

Attentions:
• The unloaded drive test should
• Network engineering parameters
be performed during neighbor
and topographical map cell optimization
• The drive test result • The drive test route should be
bidirectional.
• The neighbor list table, the
handover parameters
• The signaling tracing data
•The optimization documents
• The traffic statistic data
• The references •Network adjusting application
import
•DT and traffic statistic
comparison report after adjusting

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10


NPI(Network Performance Improvement)

 RF parameters optimization

Adjust the RF parameters, to improve the network performance and


KPI
• The traffic statistic data
• The drive test result
• The signaling tracing data Attentions:
• The local landform• Theand the
parameters adjusting procedure for running
environment network.
• The key
• Network engineering technologies should be taken more
parameters
attention to • RF parameters adjusting scheme and
and topographical map
the application form
• The users distribution Import • DT and traffic statistic comparison report
• The references after adjusting

Key points:
• The adjusting application should be review by the TS team
• The network KPI and coverage should be monitored after adjusting

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11


NPI(Network Performance Improvement)

 VIP guarantee

Guarantee the VIP communication, and get their approbation


to the network performance

Attentions:
• VIP users information
The VIP guarantee relates to the
customers’ satisfaction to the
• Marketing information
optimization work, and even relates
• Testing instruments
to the marketing development.
• VIP communication quality
estimation • VIP users communication quality
guarantee scheme
• VIP user issues resolve report

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12


NPI(Network Performance Improvement)

 Network Performance Monitoring

The network performance will meet the requirement of acceptance after the
optimization. But before the official acceptance test, continuous monitoring should
be taken to ensure the prosperous acceptance.

Attentions:
• For swap or expansion project, the network
performance before and after the implementation
should be included in the optimization report.
• The optimization• scheme
To have a self-check to confirm if the performance
• Daily network performance
meet the acceptance requirement, and take the
monitoring measurecorresponding solution procedure according to the
self-check result.
• The network information, including
KPI, traffic statistic, parameters • Daily network monitoring form
configuration • Network pre-alarm analysis report
• Daily optimization report

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 13


NPI(Network Performance Improvement)

 Customer Acceptance

After getting across the self-check, apply the acceptance to the customer, and
prove that the network performance Attentions:
meet the requirement of the acceptance
through• The
theacceptance
traffic statistic, CQT and
test principles DT result.
should be confirmed with the
customers before the official test.
• It should take the acceptance test separately by clusters for large-
• Acceptancescale network.
application report
• It should be divided into importance and common areas for the test
• Equipment commissioning report
areas.
• Engineering installation acceptance report
• The test route and spot should be consulted with the customers.
• RF optimization report
• The test instruments
• Acceptance• test performance
Various index be taken into consideration before test.
accidents should
• Acceptance• methods
Know about the acceptance test personnel, and know about their
• Test instrument preparation
concern points.
• The references
•Never give the indiscreet promises during the acceptance test.
•The network performance acceptance is different from the equipment
•RF OPTIMIZATION REPORT
installation acceptance.
Export •ACCEPTANCE REPORT

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 14


RNP&O work flow and the key points

 RNP
Network Preliminary Planning
Site Selection
Detail Planning
 RNO
Radio Network Initial Tuning
Network Performance
Improvement

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 15


Thank you
www.huawei.com