CES 341:Transportation Engineering and Planning

Chapter 8
Traffic Analysis Techniques

Asst. Prof. Dr. Mongkut Piantanakulchai


Email: mongkut@siit.tu.ac.th

1
8.1 Space-Time Relationships
t2

t1

Figure 8.1 Space-time diagram


CES 341 Transportation Chapter8: Traffic Analysis Techniques 2
Engineering and Planning
8.1 Space-Time Relationships
t2

t1

Note: Assume vehicle’s length is negligible


CES 341 Transportation Chapter8: Traffic Analysis Techniques 3
Engineering and Planning
8.1.1 Direct Graphical Solution
Fig. 8.2 Location and size of double-track sections
Transit system
Single track 15
km long
Train 10 min
interval
dispatched from
each end (W-E)
5 min layovers
Neglect stop
time at stations
Uniform speed
45 km/h both
• Determine number and location of double-track directions
sections, and the minimum length required for such
sections in order for trains running as much as 2 min
behind schedule to pass one another without delay
CES 341 Transportation Chapter8: Traffic Analysis Techniques 4
Engineering and Planning
8.1.1 Direct Graphical Solution
Fig. 8.3 Train dispatch problem
Rail line 90 km
long
7.5 km long
double-track
section located
between 60-67.5
km from W end
A train leaves W
end at 1:00 p.m.
and travel E at
constant speed of
45 km/h
The second train
leaves from the E
1) Determine earliest time the W-bound train can arrive at the W
end at 1:30 p.m.
end of the line
and may travel at
2) Determine the latest dispatch time (after 1:00 p.m.) that will
any speed up to 90
allow the W-bound train to reach its destination without
km/h
unnecessary delay
CES 341 Transportation Chapter8: Traffic Analysis Techniques 5
Engineering and Planning
8.1.2 Development of Analytical Solutions

 Complicated space-time problems


 Space-time diagrams are used to derive
analytical solutions

CES 341 Transportation Chapter8: Traffic Analysis Techniques 6


Engineering and Planning
Example: Runway Capacity Analysis

Fig. 8.4 Time separation at Fig. 8.5 Time separation at


runway threshold, vi ≤ vj runway threshold, vi ≥ vj
     1 1 
tij   tij      
 v j   vj  v j vi 

CES 341 Transportation Chapter8: Traffic Analysis Techniques 7


Engineering and Planning
Example: Runway Capacity Analysis
Weighted average of interarrival time Capacity is expressed by
1
h min   pijtij (10.2) C (10.1)
i j h min
where pij = probability of arrival pair i-j

If arrivals are independent


pij  pi p j (10.3)

Note: Assume arrivals only, no departures


More details in CES 446 Port and Airport Engineering
CES 341 Transportation Chapter8: Traffic Analysis Techniques 8
Engineering and Planning
8.1.3 Development of Simulation
Models
 More complicated problems
 Space-time diagrams are used to develop simulation
models
 Behavior of system in a step-by-step manner

CES 341 Transportation Chapter8: Traffic Analysis Techniques 9


Engineering and Planning
Example: Block Signal Control System
for Rail Line
 Objective: To protect  System of blocks and
train collisions and other aspects (combination of
hazards such as broken signal lights)
rails
 System consists of
• Electronically insulated
section of tracks = blocks
• Train detection system:
to determine if a train is
in a particular block (the
block is occupied)
• Signal system (warn or
control)

CES 341 Transportation Chapter8: Traffic Analysis Techniques 10


Engineering and Planning
Example: Block Signal Control System
for Rail Line

Fig. 8.6 Block signal control systems


CES 341 Transportation Chapter8: Traffic Analysis Techniques 11
Engineering and Planning
Example: Block Signal Control System
 0.75 km long blocks
 Three-block, four aspect system
•RR –stop and proceed at 7.5 km/h prepared
to stop
•RY – proceed at 30 km/h, prepare to stop at
next signal
•GY – proceed at 60 km/h
•GG – proceed at full speed
CES 341 Transportation Chapter8: Traffic Analysis Techniques 12
Engineering and Planning
Example: Block Signal Control System
• A train traveling at 45 km/h, passes a point A, which
is located at a block boundary, at 11:00 a.m.
• Five min and 30 s later, a second train passes this
point traveling at 90 km/h in the same direction
• Both trains are 0.375 km long
Describe the motion of the second train, determine the
time that the rear of second train passes point B,
located 4.875 km beyond point A

CES 341 Transportation Chapter8: Traffic Analysis Techniques 13


Engineering and Planning
Time-space diagram of the first train
CES 341 Transportation Chapter8: Traffic Analysis Techniques 14
Engineering and Planning
Signal indication after the first train
CES 341 Transportation Chapter8: Traffic Analysis Techniques 15
Engineering and Planning
Trajectory of the second train according to block signals
CES 341 Transportation Chapter8: Traffic Analysis Techniques 16
Engineering and Planning
Trajectory of the second train (front) according to block signals
CES 341 Transportation Chapter8: Traffic Analysis Techniques 17
Engineering and Planning
Trajectory of the second train (front&rear) according to block signals
CES 341 Transportation Chapter8: Traffic Analysis Techniques 18
Engineering and Planning
8.14 Non-trajectory Space-Time
Diagrams
 Display information about traffic states
(speed, flow rate, density) as well as
vehicle trajectories
 Contour diagram can be used to display
region with similar traffic state values

CES 341 Transportation Chapter8: Traffic Analysis Techniques 19


Engineering and Planning
8.14 Non-trajectory Space-Time
Diagrams

Figure 8.11 Speed contours


CES 341 Transportation Chapter8: Traffic Analysis Techniques 20
Engineering and Planning
8.2 Queuing Analysis

Figure 8.12 Queuing System

CES 341 Transportation Chapter8: Traffic Analysis Techniques 21


Engineering and Planning
8.2.1 Queuing Theory Fundamentals

Figure 8.13 Arrival function Figure 8.14 Arrival and


for airport runway departure functions for
airport runway

CES 341 Transportation Chapter8: Traffic Analysis Techniques 22


Engineering and Planning
8.2.1 Queuing Theory Fundamentals

Figure 8.14 Queuing Figure 8.14 Queuing


diagram features diagram, smooth curve
approximation

CES 341 Transportation Chapter8: Traffic Analysis Techniques 23


Engineering and Planning
8.2.2 Queue Discipline
 First-in, first-out (FIFO)
 Last-in, first-out (LIFO)
 Random service
 Priority service

CES 341 Transportation Chapter8: Traffic Analysis Techniques 24


Engineering and Planning
Relationship of Delay (w(t)) and Queue
Length (Q(t)) of Individual at Time t

Qt 
wt  

W(t) = Waiting time (Delay)
of an individual at
time t
Q(t) = Queue length at time t

  service rate

CES 341 Transportation Chapter8: Traffic Analysis Techniques 25


Engineering and Planning
8.2.3 Stochastic Queuing Models
 Deterministic queuing models – arrival and
service rate are deterministic (known as some function)
 Stochastic queuing models
• constant long term arrival and service rates
• short-term random fluctuations around the average rates
• arrival rate may exceed service rate for short time intervals
and queues will form

CES 341 Transportation Chapter8: Traffic Analysis Techniques 26


Engineering and Planning
Stochastic Queuing Models
 M/D/1

One Channel
Arrivals Service
Exponentially Deterministic
Distributed (No random variation)

Inter-arrival times follow


Negative Exponential Distribution

 M/M/1

CES 341 Transportation Chapter8: Traffic Analysis Techniques 27


Engineering and Planning
M/D/1
 2   arrival rate
Q   service rate
1 

   traffic intensity
 
w
2  1    Q  average queue length
w  average waiting time
2
t t  average time
2  1    spent in the system
CES 341 Transportation Chapter8: Traffic Analysis Techniques 28
Engineering and Planning
M/M/1
 2   arrival rate
Q   service rate
1 

   traffic intensity
 
w
     Q  average queue length
w  average waiting time
1
t t  average time
  spent in the system
CES 341 Transportation Chapter8: Traffic Analysis Techniques 29
Engineering and Planning
General relationships

Q  t
1
t  w

CES 341 Transportation Chapter8: Traffic Analysis Techniques 30


Engineering and Planning
8.2.4 Transportation Applications of
Queuing Theory

Server opens after arrivals begin Arrival rate temporary exceeds


constant service rate

Service rate varies Server temporarily shut down


CES 341 Transportation Chapter8: Traffic Analysis Techniques 31
Engineering and Planning
8.2.5 Queue Density, Storage, and
Spillback
 Density (vehicles per unit distance)
 Occupancy – fraction of time vehicles are
over the detector
 Objectives of studying queue density
•Locating queues and bottlenecks in traffic
•Determine the length of the queue and space
needed for queue storage, control the queue
spillback to upstream section

CES 341 Transportation Chapter8: Traffic Analysis Techniques 32


Engineering and Planning
Example Problem 8.1
 Morning peak traffic upstream of a toll
booth is given in the table
 The toll plaza consists of three booths,
each of which can handle an average of
one vehicle every 6 s.
 Using queuing diagram, determine the
maximum queue, the longest delay to an
individual vehicle, and the total delay

CES 341 Transportation Chapter8: Traffic Analysis Techniques 33


Engineering and Planning
Example Problem 8.1
Time period 10 min volume Cumulative volume

7:00-7:10 200 200

7:10-7:20 400 600

7:20-7:30 500 1100


7:30-7:40 250 1350
7:40-7:50 200 1550
7:50-8:00 150 1700

CES 341 Transportation Chapter8: Traffic Analysis Techniques 34


Engineering and Planning
Cumulative volume, A(t)

300 veh/min, D(t)

D(t)>A(t) {Show A(t), No queues}

8-21 CES 341 Transportation Chapter8: Traffic Analysis Techniques 35


Engineering and Planning
8.3 Network Analysis
 Network
•Nodes : Usually points of facilities intersect
•Origins or destinations of trips (source or sink
nodes)
•Decision points
•Links : Usually road or railway segments
 Link characteristics
•Link costs: Distance, travel time, generalized
costs (weighted sum of several costs)

CES 341 Transportation Chapter8: Traffic Analysis Techniques 36


Engineering and Planning
Network Elements
8-23 CES 341 Transportation Chapter8: Traffic Analysis Techniques 37
Engineering and Planning
Example network
Minimum path algorithm, step 1
8-25 CES 341 Transportation Chapter8: Traffic Analysis Techniques 38
Engineering and Planning
Minimum path algorithm, step 2

8-26 CES 341 Transportation Chapter8: Traffic Analysis Techniques 39


Engineering and Planning
Minimum path algorithm, step 3

8-27 CES 341 Transportation Chapter8: Traffic Analysis Techniques 40


Engineering and Planning
Minimum path algorithm, step 4

8-28 CES 341 Transportation Chapter8: Traffic Analysis Techniques 41


Engineering and Planning
Minimum path algorithm, step 5

8-29 CES 341 Transportation Chapter8: Traffic Analysis Techniques 42


Engineering and Planning
Minimum path algorithm, step 6

8-30 CES 341 Transportation Chapter8: Traffic Analysis Techniques 43


Engineering and Planning
Table 8.1 Link-cost array
Node
Node 1 2 3 4 5 6
1 -1 8 -1 2 -1 -1
2 8 -1 4 -1 2 -1
3 -1 -1 -1 -1 -1 3
4 2 -1 -1 -1 -1 -1
5 -1 2 -1 3 -1 10
6 -1 -1 3 -1 10 -1

CES 341 Transportation Chapter8: Traffic Analysis Techniques 44


Engineering and Planning
8-31 CES 341 Transportation Chapter8: Traffic Analysis Techniques 45
Engineering and Planning
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.

8-32 CES 341 Transportation Chapter8: Traffic Analysis Techniques 46


Engineering and Planning
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.

8-33 CES 341 Transportation Chapter8: Traffic Analysis Techniques 47


Engineering and Planning
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.

8-34 CES 341 Transportation Chapter8: Traffic Analysis Techniques 48


Engineering and Planning