You are on page 1of 75

Tourism Investment

Opportunities
in The Sunrise State Of
Andhra Pradesh
Andhra Pradesh Tourism Vision

Vision Policy Targets

• To be most preferred state in India for


To promote Andhra Pradesh as the most
domestic tourist arrivals, and among top
preferred tourist destination and position 12 states for international tourist arrivals
AP Tourism as a Global Tourism Brand by
providing world class tourism • To facilitate investments in the tourism
infrastructure and services duly sector to the tune of at least Rs 10,000

preserving the culture, heritage, crores and contribute to 7% of the State


GDP by 2020
environment and natural beauty of the State

• To facilitate creation of 5 lakh additional


jobs in the tourism sector

2
Tourism Investment Strategy

Government Projects: GoAP undertakes select tourism projects

PPP Projects: Developing/Operating/Maintaining Tourism infrastructure


projects in PPP mode

Private Sector Projects: Ensure best facilities & standards;


includes Private investor purchasing/leasing land for
infrastructure project/service

3
SETTING THE CONTEXT…

A. We have approved best in class Investor friendly Tourism Policy 2015-20


B. Tourism Development in the State is being undertaken across 9 themes areas and 42 sub
theme areas
C. “Shelf of Projects” with 680 projects with investment potential of INR 18000 crores

4
A 3600 APPROACH TO FACILITATE INVESTMENTS…

Investor
Friendly Policy

Single Desk Comprehensive


Clearances Shelf of Projects

 Single Desk approval system for Time  EOIs, RFQs, RFPs and SCM route for
bound approvals grounding of projects
TOURISM POLICY

TOURISM POLICY 2015-2020

6
Incentives categories for Tourism infrastructure projects

S. No Incentive category

Complementary/Linkage Infrastructure
1
Development Assistance
2 Land Conversion Charges

3 Registration and Stamp duty

4 VAT/CST/SGST

5 Luxury Tax

6 Entertainment Tax

7 Energy Tariffs

7
Complementary/Linkage Infrastructure Development Assistance

Total Project Cost Total Project Cost Total Project Cost


• Road Access < Rs 50 crores from Rs 50-100 from Rs 100 -
• Power Connectivity crores 200 crores
• Water & Sewerage Up to a maximum Up to a maximum Up to a maximum
of 5% of Total of 7.5% of total of 15% of Total
connection
Project Cost, project cost, Project Cost,
• Transport infrastructure excluding the excluding the excluding the
• Communication network cost of land, or cost of land, or cost of land, or
• Health services Rs 2 crore, Rs 5 crores, Rs 10 crores,
whichever is less whichever is less whichever is less
• Security services

8
Incentives categories for Tourism infrastructure projects

Land Conversion charges Registration and Stamp duty

• If conversion of land is permitted by • 100% reimbursement on registration and stamp duty


for all Tourism Infrastructure Projects
relevant government authority, GoAP will
• Reimbursement of Registration and Stamp duty
waive NALA tax or Land Use charges for the first time only and applicable for one
Conversion charge, as applicable. of the following:
• Due approval process to be followed for o Land bought for Tourism Infrastructure projects
or
conversion of land for Tourism
o Land taken on lease for Tourism Infrastructure
Infrastructure projects projects or
o Development Agreement charges for land taken
on development agreement for Tourism
Infrastructure projects
• Applicable also if land registered within last two (2)
years, and tourism infrastructure project is being now
developed

9
Incentives categories for Tourism infrastructure projects

VAT/CST/CGST Luxury Tax


• VAT to be charged at 5% for all new • 100% exemption of Luxury Tax for 3 years from date
Tourism Infrastructure projects from date of of commercial operations.
commencement of operations. • During this period of exemption, Tourism Unit shall not
• Necessary amendments to relevant collect any Luxury Tax.
clause(s) in Andhra Pradesh Value Added • After 3-years, Luxury tax shall be applicable as per
Tax Act 2005 to be made existing laws
• Proposed VAT rate also applicable for • Incentive for Luxury Tax to be reviewed when GST is
existing 3-star and above category hotels introduced.
• Unit entitled to only collect VAT/CST/SGST
at rate prescribed and pay same to Govt.
• Incentive to be reviewed when GST is
introduced.

10
Incentives categories for Tourism infrastructure projects

Entertainment Tax Energy Tariffs


• 100% exemption of Entertainment Tax for • All Tourism Infrastructure projects (new as well as
first 3 years from date of commercial existing) which avail High Tension (HT) connection, will
operations. be charged as per the rates provided in the “H.T.
• During this period of exemption, Tourism Category-III: Airports, Railway Station and Bus
Unit shall not collect any Entertainment Tax Stations” in the APERC Tariffs
• Incentive for Entrainment Tax to be • Tariff applicable only after the Energy Department
reviewed when GST is introduced issues necessary orders, following due process.

11
Tourism Themes and Sub-Themes

Beach and Water based projects


Beach resorts and hotels | Beach water sports | Beachfront recreational activities | Backwater tourism |
Waterways | Reservoirs and lakes | Sea Cruises | Sea Plane services

Eco Tourism Projects


Bird Sanctuaries | Jungle Safaris | Night Safaris | Eco Islands | Jungle Resorts | Botanical Gardens | Nature trails

Buddhist Projects
Restoration & development of Buddhist sites| Development of Amravathi as a major Buddhist pilgrimage centre|
Development of Buddhist Circuit

Religious Tourism
Development of 7 key temple zones | Development of Hindu Religious Circuit | Promote Dargahs at Nellore and
Kadappa

Heritage Tourism projects


Overall development of heritage sites with tourist facilities | Promote Local Arts, Crafts, Culture, Cuisine etc. |
Development of Shilparamams at 5 hubs as night bazars, urban haats | Development of museums with AV
facilities
© 2014 KPMG, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative ("KPMG International"), a Swiss entity.
All rights reserved.
Tourism Themes and Sub-Themes

MICE and other tourism infrastructure projects


Develop major MICE centres at hubs | Develop minor MICE centres across the State | Promote Star category
hotels | Improve airline & railway services in the State | Develop tourist facilities at major railway stations |
Promote local car rentals | Develop wayside amenities across all major highways

Recreation and Adventure Tourism


Develop major amusement parks at all hubs | Develop minor amusement parks Statewide | Golf Courses |
Ropeways | Sea world based amusement parks | Wonders of the world project

Spiritual & Wellness


Promote Spiritual Centers | Promote Wellness Centers

Medical Tourism
Develop super specialty hospitals across all major hubs in the State

© 2014 KPMG, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative ("KPMG International"), a Swiss entity.
All rights reserved.
BEACH AND WATER BASED TOURISM
BEACH AND WATER BASED TOURISM

 Total identified investment potential is $ 664 Million (INR 3984 Crores) in 232 Projects
 Our focus is to undertake comprehensive development across accommodation facilities, entertainment
avenues, water sports and beach zone development

Beach Resorts Backwater tourism Beach water sports Waterways

Beach Recreational activities Reservoirs and lakes Sea Cruises Sea planes
BEACH AND WATER BASED TOURISM

A. The following seven key activities have been undertaken recently:


I. EOI for Beach resorts (for private land owners and investors)
II. EOI for Back water resorts (for private land owners and investors)
III. EOI for Water sports at beach resorts
IV. EOI for Water sports in lakes and Reservoirs
V. EOI for Beach shacks
VI. EOI for Sea/ river Cruises
VII. EOI for Amphibious boat service

B. Other key projects include:


I. Development of Vizag-Bheemli Beachfront
II. Nellore Coastal Circuit Development
III. Comprehensive Development of Kakinada-Konaseema Region
ECO TOURISM
ECO TOURISM

 Total identified investment potential is $ 199 Million (INR 1194


Crores) for 59 projects Hill Tourism

Jungle resorts Eco island Eco-Islands


Jungle safari

Wildlife

Hill
Tourism

Bird sanctuaries Nature trails Night Safari


ECO TOURISM

A. We have identified mega projects for overall development of Bhavani Island, Pichuka Lanka,

Irakam Island

B. RFPs and EOIs for interested investors are being developed

C. Activities covered under Eco tourism in five tourism hubs are

I. Jungle safaris

II. Night safaris

III. Eco Islands

IV. Jungle Resorts

V. Natural Trails
MEETINGS, INCENTIVES, CONVENTIONS &
EXHIBITIONS (MICE)
MEETINGS, INCENTIVES, CONVENTIONS & EXHIBITIONS

 Total identified investment potential is $ 1.4 Billion (INR 8400 Crores) for 167 projects

Key Infrastructure Investment Avenues include:

Major/ Minor MICE centers Star Hotels Wayside amenities


MEETINGS, INCENTIVES, CONVENTIONS & EXHIBITIONS

Work has commenced on following:

A. RFP for MICE Complexes

 9 minor and 4 major MICE centers proposed

 Option to add shopping malls and multiplexes

B. EOI for Luxury Hotels (for land owners and investors)

C. EOI for Wayside/ Highway Motels (for land owners and investors)
ADVENTURE AND RECREATION
Adventure and Recreation

 Total identified investment potential is $ 554 Million ( INR 3324 Crores) for 51 projects

Amusement parks ( major and minor Golf courses Ropeways


across the state)

Sea based amusement parks


Adventure and Recreation

A. We have identified mega theme parks at: Nagarjuna

Sagar, Madhurwada, Gundavali Palam and Gandikota

B. High focus on:

I. Development of ropeways and golf courses across all

districts

II. Starting adventure sports/ activities

III. Holistic development of sites around Belum and

Borra caves
HERITAGE TOURISM
Heritage Tourism

 The total investment potential is $ 85 Million (INR 510 Cores) for 85 projects

Overall development of heritage Promote Local Arts, Crafts, Development of Shilparamams at 5


sites with tourist facilities Culture, Cuisine etc hubs as night bazars, urban haats

Development of museums with AV


Heritage Tourism

Heritage
 Promote State’s culture through urban haats, rural haats, Shilparamams and Rural Tourism
 EOI for rural/ farm tourism operators to be released shortly
 Development of Shilparamams at 5 hubs as night bazars, urban haats
 Overall development of heritage sites with tourist facilities
 Request for Qualification for Empanelment of operators for sound and light show released.
Last date is 25th July.
 Request for Qualification for Empanelment of operators for laser shows was released. Last
date is 25th July.
SPIRITUAL TOURISM
Spiritual Tourism
Spiritual /Wellness

 Total identified investment potential is $ 51 Million is identified for


23 projects
 Develop Arogyadhams and Wellness Centre across the State
especially tourist destinations

Promote Spiritual Centers | Promote Wellness Centers


MEDICAL TOURISM
Medical Tourism
Medical

A. A total investment potential of $ 130 Million (INR 780 cr) is

identified for 3 projects

B. State seeks to establish at least 3 multi Specialty large

hospitals & hotels to promote medical tourism in the State for

domestic and international tourists.

C. Identified locations are

I. Vizag

II. New Capital Region (Amravati)

III. Tirupati
GoAP – Working with you…
IDEATION CONNECT LAND FEASIBILITY APPROVE INCENTIVIZE

GoAP will work


Land shall be provisioned Single desk approvals
with you to
from GoAP land bank for 21 day approval
identify/
and/or through land cycle or deemed
conceptualize
owners interested in approval
potential
projects and tourism projects
locations
- Provisioning of linkage
We will help you infrastructure by GoAP
- Support local rece and - Tax holidays/ reduced
connect with potential official meetings as
local/ Indian partners, tax rates
part of feasibility - Reduced power tariffs
financial institutions studies
and developers - Nominal land lease
- GoAP shall promote rentals @ 2% of BMV
tourism in selected
areas through
aggressive marketing,
cluster development
and GoAP projects
Thank you
BEACH AND WATER BASED TOURISM
Beach and Water-
based tourism
Activity : Beach resort

 An EXPRESSION OF INTEREST (EOI) for development of beach resorts


was invited
a) 12 responses from investors and 6 responses from land owners
were received
b) The Department will facilitate investments and where required,
foster partnership between the interested land owners and
investors
 REQUEST FOR PROPOSAL for building a Beach Resort in PPP mode at
Sagar nagar Beach, Vizag is prepared and will be released next month.
The land extent available with the government is 3 acres.
Government land available for Beach Resort

Total acreage
Number of lands
S.No Name of the district available with
available
Government
1 East Godavari 5 40 Acres

2 Srikakulam 3 149.26 Acres

3 Vizianagaram 6 136.89 Acres

4 Nellore 2 9.5 Acres

5 Vishakhapatnam 6 47.93 Acres

6 Prakasam 2 8 Acres

7 West Godavari 2 7 Acres

8 Krishna 1 40 Acres

9 Guntur 1 8 Acres

36
Private land Owners interested in developing
Beach Resorts

Extent Available
S.No Name of the District
(Ac.)
1 Chirala, Prakasam 0.83
2 Tummalapenta, Nellore 46.99
3 KOMARAGIRI, Kothapalli Uppada, Kakinada 5.36
4 Bapatla Sub div adavi gramem laluke 1
5 Kothakoduru village 45.72
6 Kothakoduru Village, T.P. Gudur Mandal 22

37
Investors available for Beach Resorts

S.No Investor Interested location in AP


Kothapatnam, Odalrevu,
1 Sudha Enterprises
Motupalli, Ramayapatnam
Not mentioned any location of
2 Pragati
interest
3 LEPL Odalrevu, Chirala, Surya Lanka
Rushikonda , Yandada/ Sagar
4 Meghalaya Hotels
Nagar beach
5 SVN

6 Buddha Beach Resort


7 Club Mahindra
8 Sreekanya Developers Not mentioned any location of
interest. But they are interested in
9 Greenpark any location
10 Thomas Hotels
11 Cynergy Performers

12 Southern Travels

38
BEACH AND WATER BASED TOURISM

Activity : Back water resorts


 Department wishes to develop backwater resorts across 14 prominent
riverside locations in East and West Godavari Districts.
 EXPRESSION OF INTEREST have been called from Land Owners with land
near backwater areas and from Investors interested in developing backwater
resorts at these locations.
 Received 5 responses from investors and 1 from land owners
 The Department will facilitate investments and, where required, foster
partnership between the interested land owners and investors once
responses are finalized.
List of places where back water resorts are planned as per
EOI

List of back water resorts


S.No River sides identified District
1 Bodasakurru East Godavari
2 Addurru East Godavari
3 Odalarevu East Godavari
4 Pedapatnam Lanka East Godavari
5 Yedurlanka East Godavari
6 Gogullanka East Godavari
7 Mukteswaram East Godavari
8 Karavaka East Godavari
9 Kotipalli East Godavari
10 Muramalla East Godavari
11 Korugorumilli West Godavari
12 Doddipatla West Godavari
13 Chinchinada West Godavari
14 Elamanchili Lanka West Godavari

40
Land Owners and Investors for Backwater River resort

Land owners details:

S.No. Land Owner Area (In Acres) District Village

1 Gokul Nursery 3.55 E.Godavari Burrilanka

Investor details:

S.No. Investor Interested location


1 Pragati They are open to invest in any locations
2 Club Mahindra They are open to invest in any locations
3 Thomas Hotels They are open to invest in any locations
Bodasakurru (EG), Gogullanka (EG),
4 Punnami Tourism
Muramalla EG
Rajahmundry and Antarvedi
5 Trivik Hotels & Resorts

41
Government lands available for back water resorts

Summary

S.No Name of the district Number of lands available Total acreage

1 East Godavari 10 Acs. 106.62


2 West Godavari 4 Acs. 17.79

42
BEACH AND WATER BASED TOURISM

Beach and Water-based


Activity : Beach water sports tourism

 EXPRESSION OF INTEREST (EOI) for water sports was invited


 Ten companies have responded with interest in water sports like Jet
Ski, Scuba Diving, Cruises, Banana Boat Rides, Para-Sailing etc.
 A meeting with the interested investors was also held to discuss on
way forward
 WATER SPORTS GUIDELINES for various water sports across 39 key beaches
have been prepared after investor discussions.
 Operating permits will be issued on issue of the guidelines
BEACH AND WATER BASED TOURISM

Beach and Water-based


Investors in beach water sports tourism

S.No Investor
1 Ocean Blue boating Pvt. Ltd

2 Cresent Adventures

3 Dhamam Infra Projects


4 Livein Adventures

5 Vinayagar Hotels and Resorts Pvt ltd

6 Akshara enterprises in consortium with EJ Tech Air and Adventures Pvt Ltd
7 VRS consultants + Tourism simple INC and Islanderwater sports INC USA
8 Punnami Tourism Pvt Ltd
BEACH AND WATER BASED TOURISM

Beach and Water-based


Activity : Water sports in lakes and tourism
reservoirs

 EXPRESSION OF INTEREST (EOI) for water sports was invited for 25 reservoirs
and 2 lakes
 8 companies have responded to set up water sports in various lakes
 A meeting with the interested investors was also held to discuss on way
forward
 WATER SPORTS GUIDELINES will be used for issuing operating permits
LIST OF RESERVOIRS AND LAKES

Beach and Water-based


S.No Name of the Reservoir District tourism
1 Vamsadhara Barrage reservoir Srikakulam
2 Thotapalli Barrage Vizianagarm
3 Thandava reservoir Visakhapatnam
4 Meghadrigadda Reservoir Visakhapatnam
5 Sir Arthur Cotton Barrage (Godavari Barrage) East Godavari
6 Yeleru reservoir East Godavari
7 Pampa Reservoir East Godavari
8 Indira Sagar project (Polavaram)* West Godavari
9 Errakaluva Reservoir West Godavari
10 Prakasam Barrage (Krishna Barrage) Krishna
11 Pulichintala Project* Guntur
12 Nagarjuna Sagar Reservoir** Guntur
13 Gundlakamma barrage reservoir Prakasam
14 Nallamala sagar project (Veligonda Project)* Prakasam
LIST OF RESERVOIRS AND LAKES

S.No Name of the Reservoir District


15 Sri Pothuluri Veerabhrahmendra Swamy Barrage Kadapa
16 Mylavaram Kadapa
17 Gandikota reservoir Kadapa
18 Mallemadugu Chittoor
19 Kalyani dam Chittoor
20 Somasilla Reservoir Nellore
21 Kandaleru reservoir (on Telugu Ganga Project) Nellore
22 Swarnamukhi Barrage Nellore
23 Penna Ahobilam Balancing Reservoir Ananthapur
24 Owk reservoir Kurnool
25 Srisailam Reservoir Kurnool
List of lakes
S.No Name of the Lake District
1 Pulicat lake Nellore
2 Kolleru lake Krishna and West Godavari
BEACH AND WATER BASED TOURISM

Beach and Water-based


Investors in water sports at reservoirs and lakes tourism

S.No Investor
1 Meghalaya Hotels
2
Cresent Adventures
3 Sri City Projects (4 locations)
4 Punnami Tourism
5
Ocean Blue
6 KEI Rajamahendri Resorts (2 locations)
7 Rowfin Hospitality
8 Visakha Boating
BEACH AND WATER BASED TOURISM

Beach and Water-based


Activity : Beach shacks tourism

 Beach Shacks have been proposed across 39 beaches in the


State.
 Beach Shacks would include services like shacks, deck beds,
sun-shades, refreshments, umbrellas etc.
 An EXPRESSION OF INTEREST has been released for interested
local participants
 The last date for submission of responses was 17th July 2015
BEACH AND WATER BASED TOURISM

Beach and Water-based


Activity : Sea Cruises tourism

 Department wishes to leverage the excellent port infrastructure of the State to start cruises to
various destinations
 Initially, two routes have been identified:
 Vizag- Kakinada ( To and fro)
 Vizag to Bheemli beach ( To and fro)
 EXPRESSION OF INTEREST for operators interested to operate cruises on these routes has been
released with last date as 17th July 2015
 Going forward, cruises from Vizag to Andaman and Nicobar Islands and Singapore/ Phuket are also
envisaged
ECO TOURISM

Mega project :Development of Bhavani Island

 Bhavani Island, is a mid river island in River

Krishna in Amravati, New Capital of the State

 Department aims to develop Bhavani Island as

mini-Sentosa (MICE, Leisure, Wellness tourism

prospects) on Bhavani Island and by linking

surrounding islands

 Land available on main island is 111 Ac.


ECO TOURISM

Eco Tourism

Activity : Jungle resort/cottages Activity : Night Safaris

 Lammbasingi  Vizag Zoo

 Dallepalli  Tirupati Zoo

Activity : Jungle safari

 Dornala

 Bairluty

 Mahanandi
MEETINGS, INCENTIVES, CONVENTIONS & EXHIBITIONS
MICE &
Tourism Infrastructure
Activity : MICE Centers

 MICE comprises of Convention, Exhibition halls, hotels,


shopping complex with multiplex
 9 minor and 4 major MICE centers proposed
 Option to add shopping malls and multiplexes
 RFP for MICE center at Rajahmundry is published and
will be taken up as PPP project

Priority District Town/ City Location


1 East Godavari Rajahmundry NH, Opp. Central Jail
2 Srikakulam Srikakulam Ponnada Konda
3 Vizianagaram Vizianagaram Near Shilparamam
4 Kadapa Kadapa Kadapa
5 Prakasam Ongole Peyllur village
6 Chittoor Tirupati Vendantapuram
MEETINGS, INCENTIVES, CONVENTIONS & EXHIBITIONS

MICE &
Activity : Hotels Tourism Infrastructure

 Focused development of 3* and above hotels is envisaged in


16 locations across the State
 An EXPRESSION OF INTEREST from Land Owners and from
Investors interested in developing such hotels has been called

S. No Locations of Hotels District S. No Locations of Hotels District


1 Srikakulam Srikakulam 10 Tada (SRI City) Nellore
2 Vishakapatnam Vishakapatnam 11 Tirupati Chittoor
3 Kakinada East Godavari 12 Kadapa Kadapa
4 Rajahmundry East Godavari 13 Kurnool Kurnool
5 Eluru West Godavari 14 Anantapur Anantapur
6 Vijayawada Krishna 15 Nellore Nellore
7 Guntur Guntur 16 Vizianagram Vizianagram
8 Nagarjuna Sagar Guntur
Land owners and investors
Land Owners andfor hotels
Investors for Hotels
MICE &
Tourism Infrastructure

Land owners details: Investor details:

S.No. Land Owner Area (In S.No. Investor


Acres) 1 Meghalaya Hotels

KEI Rajahmundry 2 Vignesh Enterprises D V Manor


1 5.70
Resorts 3 Daspalla Jublee Hill resorts Ltd.
Trivik Hotels & Resorts
2 2.10 4 Ms. Southern Travels
Pvt Ltd
Sarada Roadways, V. 5 Shree Venkateshwara Lodge
3 1
Padamaja
6 GreenPark Hotels and Resorts Ltd.
Sarada Roadways, V.
4 1.48 7 Sree Kanya Devallu & Sons
Padamaja
8 Trivik Hotels & Resorts Pvt Ltd

 Department will facilitate investments and, where required, foster


partnership between the interested land owners & investors

56
MEETINGS, INCENTIVES, CONVENTIONS & EXHIBITIONS

MICE &
Activity : Way side amenities Tourism Infrastructure

1. Focused development of wayside amenities across all National and State Highways in the State has
been envisaged. Department has identified 48 major highway stretches between important
locations for the same.

Land owners details: Investor details:

S.No. Land Owner Area S.No. Investor


Gangarajapuram (Village), 1 Southern Travels
1 10.6 Ac 2 Sreekanya Devallu & Sons Hotels
Kadapa Dist
Mulyaguda (Borra Junction 3 B. Pratap Reddy
2 7 Ac
on SH39 4 Daspalla Group, M/s. Jublee Hills
3 3.55 Ac Resort
Burrilanka, East Godavari
5 N. Rama Kalyani
4 325 Sq. Yd.
Kurmmanapalem
Adventure and Recreation
Recreation/Adventure
Mega Theme park- 1: GANDIKOTA- THE GRAND CANYON OF INDIA

 Department aims to develop Gandikota as a Land Available: 2000 Acres


major Entertainment, Amusement, Adventure
Hub and Golf Destination
 Key attractions include Reservoir, Fort,
Temples, Unique Rock Formation and Penna
Gorge etc.
Adventure and Recreation
Recreation/Adventure
Mega Theme park- 2: NAGARJUNA SAGAR- DEVELOPMENT AS MAJOR
ENTERTAINMENT HUB

• Nagarjunasagar Dam - the world’s tallest masonry dam and earliest hydro- Land Available: 500 Ac.
electric projects of India.
• Ethipothala Waterfalls - Mountain stream cascading down the hills with
verdant valleys & numerous cave temples that dot hilly country side.
• Nagarjunakonda - Buddhist museum in an Exotic island - has collection of
relics of Buddhist art & culture date back to 3rd century AD.
• Srisailam Wild Life Sanctuary - One of India’s largest reserve forests.
• Srisailam Temple - One of the Jyothirlingas (out of 12)
Adventure and Recreation
Recreation/Adventure
Mega Theme park- 3: Theme park in Madhurwada, Vishakapatnam

• Strategically located - surrounded by IT Parks, Gated Communities, Land Available: 100 Ac


Residential Townships
• Excellent Connectivity - 1.5 km East of NH-05 & beach road
Adventure and Recreation

Recreation/Adventure
Activity : Ropeways

 RFP ( under PPP mode) for ropeway at Kotappakonda has


been released
 The other RFP for ropeways are under preparation and
will be published soon

Priority District Proposed Ropeway


1 Guntur Kotappakonda
2 Chittoor Horsely hills
3 Kurnool Ahobilam to Hilltop
4 East Godavari Annavaram
5 Krishna Kondapalli Kota

Kailashagiri and Simhachalam


6 Vishakhapatnam
hills
Adventure and Recreation

Recreation/Adventure
Activity : MICE Centers

 RFP ( under PPP mode) for MICE Centre at Rajahmundry has been released
 The other RFP for MICE centers are under preparation and will be published soon

Extent
Priority District Town/ City Location of
Land
NH, Opp. Central
1 East Godavari Rajahmundry 6.05
Jail

2 Srikakulam Srikakulam Ponnada Konda 53

Near
3 Vizianagaram Vizianagaram 41.34
Shilparamam
4 Kadapa Kadapa Kadapa 13.22
Peyllur village
5 Prakasam Ongole 3.35
(municipal limits)

6 Chittoor Tirupati Vendantapuram 11.76


Vizag-Bheemli Beach Front Development

PROPOSED
#
DEVELOPMENTS
Vizag City Beach Front (RK
1
Beach)
2 Sagar Nagar Beach Front
3 Yendada Beach Front
4 Rushikonda Beach Front
5 Thotlakonda Beach Front
Mangamaripeta Beach
6
Front
7 Bhimli Beach Front

STATUS
 Detailed drawings have
been prepared
 Work to be commenced
soon
Illustrative Drawings of Beach Development at Vizag

Vizag City Beach Front


Illustrative Drawings of Beach Development at Vizag

Sagar Nagar Beach Front


Illustrative Drawings of Beach Development at Vizag

Sagar Nagar Beach Front


Nellore Coastal Circuit Development

S. NO PROPOSED DEVELOPMENTS
Pulicat Lake: B V Palem, Irakkum &
1
Venadu Islands, Atakanitippa
2 Nelapattu Birds Sanctuary
3 Kandaleru Reservoir
4 Nellore Tank Bund
5 Kothakoduru Beach
6 Mypadu beach
7 Ramatheertham temple and beach
8 Iskapalli Beach
9 Udayagiri Fort
10 Krishnapatnam Cruise Terminal
Comprehensive Development of Kakinada-
Konaseema Region
KAKINADA - Proposed – Beach Front Development

⁻ Passenger Terminal & Wax Museum ⁻ Water Sports


& Jetty ⁻ Food Courts & ⁻ Beach resorts at
⁻ Aquamarine Park Convention Center various locations
⁻ Amusement Park ⁻ Sea Cruises/ Boats/
⁻ Maritime Museum Planes/ Taxis

HOPE ISLAND - Proposed - Island Development

⁻ Upgradation of ⁻ Water Laser Show & ⁻ Tented


Existing Jetty Water Fountains Accommodation
⁻ Tourist ⁻ Water Sports ⁻ Gazebos
Interpretation ⁻ Eco friendly Food
Centre Courts

KONASEEMA - Proposed – Facility Development @ 6 Locations

Watch Tower, Floating Jetty; Information Centre; Parking Lot


Development; Concrete Wharf; Ticketing Counters; Gazebos;
Backwater Resorts
Sound & Light and Laser Shows

# Temple/Activity Name (Phase I) District


1. Kanipakam Temple Chittoor
2. Sri Kalahasti Temple Chittoor
3. Annavaram Temple East Godavari
4. Kankadurga Temple Krishna
5. Srisailam Temple Kurnool
6. Simhachalam Temple Vizag
7. Dwarka-Tirumala Temple West Godavari
8. Puttaparthi Ananthapur
9. Opposite Berm Park, in River Krishna
Krishna
10. Opposite Rushikonda Beach Visakhapatnam
Other Supporting Slides
Government land available for Beach Resort Beach and Water-
based tourism

District: East Godavari

S.No Name of the beach Village Acres


1 S.Yanam Beach S.Yanam (V), Uppalaguptam (M). Acs. 10.00

2 Chintalamori Chintalamori (V), Malikipuram (M). Acs. 10.00

3 Chirrayanam Chirrayanam (V), Katrenikona (M). Acs. 10.00

4 Odalarevu Vodalrevu ,Mandanurlanka (V), Allavaram (M). Acs. 5.00

5 Antarvedi Beach Antarvedi (V), Sakhinetipalli (M). Acs. 5.00

District: Srikakulam
S.No Name of the beach Village Acres
1 Kalingpatnam Beach Kalingapatnma (V), Gara (M) Acs. 16.00

2 Baruva Beach Baruva Peta (v), Sompeta (M) Acs. 3.26

3 Bhavanapadu Beach Bhavanapadu (V), Sontabommali Acs.


130.00

71
Government land available for Beach Resort Beach and Water-
based tourism
District: Vizianagarm

S.No Name of the beach Village Acres


1 Chintapalli Chintapalli Acs. 3.50

2 Konada Konada (V), Posapatirega (M) Acs. 15.79

3 Konada Kancherupalem (V), Bhogapuram (M). Acs. 103.92

4 Bhogapuram Beach Kancherupalem (V), Bhogapuram (M). Acs. 4.00

5 Bhogapuram Beach Kancheru (V), Bhogapuram (M). Acs. 2.78

6 Bhogapuram Beach Kancheru (V), Bhogapuram (M). Acs. 6.90

District: Nellore

S.No Name of the beach Village Acres


1 Tummalapenta Beach Tummalapenta(V), Kavali(M). Acs. 4.00

2 Tupilipalem Beach Tupilipalem(V) (Near Vakadu), Kota(M). Acs. 3.50

72
Government land available for Beach Resort Beach and Water-
based tourism
District: Vishakhapatnam

S.No Name of the beach Village Acres


1 Yandada/Sagar nagar Beach (Behind Senora) Endada (V), Sagarnagar(M) Acs. 3.00

2 Yandada/Sagar nagar Beach Yendada (V)(Behind Blind School), Vizag Rural Acs. 3.50
(M).
3 Rushikonda Beach (Behind Senora) Endada (V), Sagarnagar(M) Acs. 10.00

4 Yarada Beach Besides Gitam, Endada Acs. 7.14

5 Mangamaripeta Beach Rushikonda Below IT SEZ (Rama Naidu Studio) Acs. 5.00

6 Revupolavaram Beach Revupolavaram Acs. 10.00

7 Revupolavaram Beach Endada , Sagar nagar Acs 5.00

District: Prakasam

S.No Name of the beach Village Acres


1 Kothapatnam Beach Kothapatnam (V) & (M) Acs. 5.00

2 Odarevu/Chirala Beach Vodarevu (V), Chirala (M). Acs. 3.00

73
Government land available for Beach Resort Beach and Water-
based tourism
District: West Godavari

S.No Name of the beach Village Acres


1 Perupalem Beach Perupalem (V), Mogalthur (M). Acs. 2.00

2 Mollaparru Beach Perupalem (V), Mollaparru (M). Acs. 5.00

District: Krishna
S.No Name of the beach Village Acres
1 Manginapudi Beach (Manginapudi) Tallapalem (V), Machilipatnam (M). Acs. 40.00

District: Guntur

S.No Name of the beach Village Acres


1 Suryalanka Beach Suryalanka Acs. 8.00

74
Government lands available for back water resorts

District: East Godavari

S.No Name of the location Village Area

1 Gogullanka Chintalamoori Acs. 10.00


2 Gogullanka Gogulanka Guthenadeevi (V&M) of Acs. 13.62
I.Polavaram.
4 Yedurlanka Yedurlanka (V), I.Polavaram (M). Acs. 5.00
5 Addurru Aduru (V), Mamidikuduru Acs. 1.00
6 Addurru Thammavaram & Vakalapudi (V), Acs. 59.00
Kakinada (M).
7 Bodasakurru Bodasakurru (V), Allavaram (M) Acs. 5.00
8 Bodasakurru Maredumilli Acs. 5.00
9 Karavaka Karavaka (V), Mamidikoduru (M). Acs. 5.00
10 Karavaka Peddapatnam Lanks, Mamidikoduru Acs. 3.00

75
Government lands available for back water resorts

District: West Godavari

S.No Name of the location Village Area

1 Perupalem Perupalem Acs. 3.00


2 Polavaram Koruturu (V), Polavaram (M). Acs. 2.00
3 Achanta Pedamallam (V), Achanta (M). Acs. 2.89
4 Kovvuru Kovvuru (V), Kovvuru (M). Acs. 9.90

76

You might also like