Project Title : Piping and Cable Pulling 1. All contractors should undergo safety
P4 3rd floor Quality Office Orientation prior to the start of the project
2. Always wear the prescribe Personal
Protective Equipment (PPE) as needed by
The job as shown in the example below-
Project Title : Piping and Cable Pulling 1. All contractors should undergo safety
P2 2nd floor Laboratory MPQA Orientation prior to the start of the project
2. Always wear the prescribe Personal
Protective Equipment (PPE) as needed by
The job as shown in the example below-