5 points
8 points
13 points
White Barrel LLC. © 2010 Peter Saddington
Decomposition of a Story
• Goal: Break big stories into smaller stories
• Goal: Define stories that can fit into single iterations
• Remember: A little effort helps a lot
• Remember: A lot of effort only helps a little more