Requirement of Major Materials for Planned & NonPlanned Works in C O&M Circles, BESCOM for the FY
2011-12
&
Allotment of Materials C O&M Circles wise
for the FY 2011-12

Requirement/Allotment of a    for Planned & Non-Planned


Works in SOUTH CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit
Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

D.Trs. 25 KVA

Nos.

87

10

77

10

10

D.Trs 63 KVA

Nos.

19

10

10

D.Trs 100 KVA

Nos.

185

177

10

D.Trs 250 KVA

Nos.

317

308

10

D.Trs 500 KVA

Nos.

25

22

Future Allotment
SL No

Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

D.Trs. 25 KVA

Nos.

10

10

10

10

10

10

D.Trs 63 KVA

Nos.

D.Trs 100 KVA

Nos.

25

25

25

25

27

20

20

D.Trs 250 KVA

Nos.

43

45

50

40

40

50

30

D.Trs 500 KVA

Nos.

Requirement/Allotment of p  for Planned & Non-Planned


Works in SOUTH CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

PCC Pole 8 mts

Nos.

PSC Poles 8 mts

Nos.

RCC Pole 8 mts

Nos.

10

10

10

PSC Poles 9 mts

Nos.

3566

1165

2401

350

740

75

RCC Pole 9 mts

Nos.

3336

150

3186

150

Spun Pole

Nos.

437

437

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

PCC Pole 8 mts

Nos.

PSC Poles 8 mts

Nos.

RCC Pole 8 mts

Nos.

PSC Poles 9 mts

Nos.

350

400

400

400

350

350

151

RCC Pole 9 mts

Nos.

460

500

500

450

450

450

376

Spun Pole

Nos.

70

70

75

75

80

35

32

NOTE: Action Plan works Approved, LOI issued on 02.08.2011 to execute the works

Requirement/Allotment of m ma  for Planned & Non-Planned


Works in SOUTH CIRCLE, BESCOM for the FY 2011-12

Already Allotted
SL No

Name of the Material

Unit
Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July1
1

Aug-11

Rabbit ACSR Conductor

Kms

483.62

150.00

333.62

0.00

0.00

100.00

50.00

50.00

Coyote ACSR Conductor

Kms

91.97

0.00

91.97

0.00

0.00

0.00

0.00

0.00

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Rabbit ACSR Conductor

Kms

40.00

50.00

40.00

40.00

40.00

50.00

23.62

Coyote ACSR Conductor

Kms

10.00

15.00

15.00

10.00

15.00

14.00

12.97

NOTE: Action Plan works Approved, LOI issued on 02.08.2011 to execute the works

Requirement/Allotment of    a  for Planned &


Non-Planned Works in SOUTH CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July11

Aug-11

45 KN Disc Insulator

Nos.

5448

5448

Pin Insulator Shells 1.1 KV

Nos.

20265

20265

Pin Insulator Shells 11 KV

Nos.

14023

1500

12523

1500

G.I. Pin 1.1 KV

Nos.

16105

16105

G.I. Pin 11 KV

Nos.

8589

8589

SPMT for 25/63 KVA

Set

SPMT for 100 KVA

Set

SPMT for 250 KVA

Set

216

216

L.T.Protection Kit

Set

1351

1351

Fresh Transformer Oil Good

KL

57.00

27.85

29.15

11

16.85

4.00

10

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

45 KN Disc Insulator

Nos.

Pin Insulator Shells 1.1 KV

Nos.

Pin Insulator Shells 11 KV

Nos.

G.I. Pin 1.1 KV

Nos.

G.I. Pin 11 KV

Nos.

SPMT for 25/63 KVA

Set

SPMT for 100 KVA

Set

SPMT for 250 KVA

Set

L.T.Protection Kit

Set

Fresh Transformer Oil Good

KL

3.5

3.5

3.5

3.5

3.5

3.5

3.5

10

NOTE: Action Plan works Approved, LOI issued on 02.08.2011 to execute the works

Requirement/Allotment of a    for Planned & Non-Planned


Works in NORTH CIRCLE, BESCOM for the FY 2011-12

Already Allotted
SL
No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

D.Trs. 25 KVA

Nos.

D.Trs 63 KVA

Nos.

10

-10

10

D.Trs 100 KVA

Nos.

168

162

10

D.Trs 250 KVA

Nos.

283

12

271

10

15

D.Trs 500 KVA

Nos.

SL
No

Future Allotment
Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

D.Trs. 25 KVA

Nos.

D.Trs 63 KVA

Nos.

D.Trs 100 KVA

Nos.

20

25

25

30

25

15

12

D.Trs 250 KVA

Nos.

30

38

45

40

40

43

35

D.Trs 500 KVA

Nos.

Requirement/Allotment of p  for Planned & Non-Planned


Works in NORTH CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL
No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

PCC Pole 8 mts

Nos.

PSC Poles 8 mts

Nos.

RCC Pole 8 mts

Nos.

PSC Poles 9 mts

Nos.

2112

1535

577

350

1110

75

RCC Pole 9 mts

Nos.

4239

150

4089

75

75

Spun Pole

Nos.

251

251

SL
No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

PCC Pole 8 mts

Nos.

PSC Poles 8 mts

Nos.

RCC Pole 8 mts

Nos.

PSC Poles 9 mts

Nos.

80

80

90

90

90

85

62

RCC Pole 9 mts

Nos.

600

600

800

800

500

400

389

Spun Pole

Nos.

35

35

40

40

40

30

31

NOTE: Action Plan works Approved, LOI issued on 02.08.2011 to execute the works

Requirement/Allotment of m ma  for Planned & Non-Planned


Works in NORTH CIRCLE, BESCOM for the FY 2011-12

Already Allotted
SL
No

Name of the Material

Unit
Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

Rabbit ACSR Conductor

Kms

415.34

100.00

315.34

0.00

0.00

50.00

50.00

50.00

Coyote ACSR Conductor

Kms

70.49

0.00

70.49

0.00

0.00

0.00

0.00

0.00

SL
No

Future Allotment
Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Rabbit ACSR Conductor

Kms

40.00

45.00

40.00

30.00

40.00

40.00

30.00

Coyote ACSR Conductor

Kms

10.00

10.00

0.00

10.00

15.00

15.00

10.00

NOTE: Action Plan works Approved, LOI issued on 02.08.2011 to execute the works

Requirement/Allotment of     for Planned &


Non-Planned Works in NORTH CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL
No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

45 KN Disc Insulator

Nos.

2827

2827

Pin Insulator Shells 1.1 KV

Nos.

10838

10838

Pin Insulator Shells 11 KV

Nos.

6829

6829

G.I. Pin 1.1 KV

Nos.

10306

10306

G.I. Pin 11 KV

Nos.

5520

5520

SPMT for 25/63 KVA

Set

SPMT for 100 KVA

Set

SPMT for 250 KVA

Set

202

202

L.T.Protection Kit

Set

Fresh Transformer Oil Good

KL

16.20

26.00

-10

11

16.05

10

SL
No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

45 KN Disc Insulator

Nos.

350

400

450

500

450

450

227

Pin Insulator Shells 1.1 KV

Nos.

1500

1800

1800

1500

1400

1400

1438

Pin Insulator Shells 11 KV

Nos.

1000

1000

1200

1200

800

800

829

G.I. Pin 1.1 KV

Nos.

1500

1500

1800

1800

1500

1200

1006

G.I. Pin 11 KV

Nos.

800

800

1000

1000

700

600

620

SPMT for 25/63 KVA

Set

SPMT for 100 KVA

Set

SPMT for 250 KVA

Set

25

25

40

40

25

25

22

L.T.Protection Kit

Set

Fresh Transformer Oil Good

KL

9
10

NOTE: Action Plan works Approved, LOI issued on 02.08.2011 to execute the works

Requirement/Allotment of a    for Planned & Non-Planned


Works in BMAZ, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit
Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

D.Trs. 25 KVA

Nos.

87

10

77

10

10

D.Trs 63 KVA

Nos.

19

20

-1

20

D.Trs 100 KVA

Nos.

353

14

339

10

D.Trs 250 KVA

Nos.

600

21

579

12

10

D.Trs 500 KVA

Nos.

30

27

Future Allotment
SL No

Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

D.Trs. 25 KVA

Nos.

10

10

10

10

10

10

D.Trs 63 KVA

Nos.

D.Trs 100 KVA

Nos.

25

25

25

25

27

20

20

D.Trs 250 KVA

Nos.

43

45

50

40

40

50

30

D.Trs 500 KVA

Nos.

Requirement/Allotment of p  for Planned & Non-Planned


Works in BMAZ, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

PCC Pole 8 mts

Nos.

PSC Poles 8 mts

Nos.

RCC Pole 8 mts

Nos.

15

15

PSC Poles 9 mts

Nos.

5678

2700

2978

700

1850

150

RCC Pole 9 mts

Nos.

7575

300

7275

225

75

Spun Pole

Nos.

688

688

SL No

Name of the Material

Future Allotment

Unit
` 



 





 

 

PCC Pole 8 mts

Nos.

PSC Poles 8 mts

Nos.

RCC Pole 8 mts

Nos.

PSC Poles 9 mts

Nos.

430

480

490

490

440

435

213

RCC Pole 9 mts

Nos.

1060

1100

1300

1250

950

850

765

Spun Pole

Nos.

105

105

115

115

120

65

63

NOTE: Action Plan works Approved, LOI issued on 02.08.2011 to execute the works

Requirement/Allotment of m  m  for Planned & Non-Planned


Works in BMAZ , BESCOM for the FY 2011-12

Already Allotted
SL No

Name of the Material

Unit

Total
Requiremen
t

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

Rabbit ACSR Conductor

Kms

898.96

250.00

648.96

0.00

0.00

150.00

100.00

100.00

Coyote ACSR Conductor

Kms

162.46

0.00

162.46

0.00

0.00

0.00

0.00

0.00

SL
No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Rabbit ACSR Conductor

Kms

80.00

95.00

80.00

70.00

80.00

90.00

54.00

Coyote ACSR Conductor

Kms

20.00

25.00

15.00

20.00

30.00

29.00

23.00

NOTE: Action Plan works Approved, LOI issued on 02.08.2011 to execute the works

Requirement/Allotment of     for Planned &


Non-Planned Works in BMAZ, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

45 KN Disc Insulator

Nos.

8275

8275

Pin Insulator Shells 1.1 KV

Nos.

31103

31103

Pin Insulator Shells 11 KV

Nos.

20852

1500

19352

1500

G.I. Pin 1.1 KV

Nos.

26411

26411

G.I. Pin 11 KV

Nos.

14109

14109

SPMT for 25/63 KVA

Set

SPMT for 100 KVA

Set

SPMT for 250 KVA

Set

418

418

L.T.Protection Kit

Set

1351

1351

Fresh Transformer Oil Good

KL

73

53.85

19.35

22

32.9

4.00

10

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

45 KN Disc Insulator

Nos.

1150

1150

1300

1400

1200

1200

875

Pin Insulator Shells 1.1 KV

Nos.

4500

4300

4800

4500

4400

4900

3703

Pin Insulator Shells 11 KV

Nos.

2800

2800

2700

3200

2800

2800

2252

G.I. Pin 1.1 KV

Nos.

3800

4000

4300

4100

3800

3700

2711

G.I. Pin 11 KV

Nos.

2000

2100

2300

2500

1900

1600

1709

SPMT for 25/63 KVA

Set

SPMT for 100 KVA

Set

SPMT for 250 KVA

Set

60

60

75

70

55

55

43

L.T.Protection Kit

Set

200

200

200

210

200

200

141

Fresh Transformer Oil Good

KL

4.00

4.00

4.00

4.00

4.00

4.00

4.00

10

NOTE: Action Plan works Approved, LOI issued on 02.08.2011 to execute the works

Requirement/Allotment of 
 for Planned & Non Planned
Works in BRC, BESCOM for the FY 2011-12

Already Allotted
SL
No

Name of the Material

Unit

Total
Require
ment

Allotted
till
July-11

Balance

Apr-11

May-1

June-11

July-11

Aug-11

D.Trs. 25 KVA

Nos.

1999

182

1817

12

98

72

80

D.Trs 63 KVA

Nos.

863

60

803

12

25

23

70

D.Trs 100 KVA

Nos.

391

24

367

20

30

D.Trs 250 KVA

Nos.

D.Trs 500 KVA

Nos.

SL
No

Future Allotment.
Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-1

Jan-12

Feb-12

Mar12

D.Trs. 25 KVA

Nos.

120

250

250

270

270

289

280

D.Trs 63 KVA

Nos.

90

90

100

110

123

110

110

D.Trs 100 KVA

Nos.

35

45

50

50

68

45

44

D.Trs 250 KVA

Nos.

D.Trs 500 KVA

Nos.

Requirement/Allotment of POLES for Planned & Non-Planned


Works in BRC, BESCOM for the FY 2011-12

Already Allotted
SL
No

Name of the
Material

Unit

PCC Pole 8 mts

Total
Requirement

Allotted
till July11

Balance

Apr
11

May11

June11

July11

Nos.

600

40

560

40

50

PSC Poles 8 mts

Nos.

6398

70

6328

70

50

RCC Pole 8 mts

Nos.

3247

3247

40

PSC Poles 9 mts

Nos.

16963

400

16563

150

150

100

80

RCC Pole 9 mts

Nos.

5666

225

5441

150

75

20

Spun Pole

Nos.

35

35

SL
No

Aug11

Future Allotment

Name of the
Material

Unit

PCC Pole 8 mts

Sep-11

Oct-11

Nov11

Dec11

Jan12

Feb12

Mar12

Nos.

75

75

75

75

75

75

60

PSC Poles 8 mts

Nos.

900

900

900

900

900

900

878

RCC Pole 8 mts

Nos.

460

460

460

460

460

460

447

PSC Poles 9 mts

Nos.

2000

2420

2420

2420

2420

2420

2383

RCC Pole 9 mts

Nos.

700

790

790

790

790

790

771

Spun Pole

Nos.

10

10

Requirement/Allotment of
Works in

m  m  for Planned & Non-Planned

BRC , BESCOM for the FY 2011-12

Already Allotted
SL No

Name of the
Material

Unit
Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

Rabbit ACSR
Conductor

Kms

5663.75

300.00

5363.7

0.00

0.00

100.00

200.00

100.00

Coyote ACSR
Conductor

Kms

140.41

0.00

140.41

0.00

0.00

0.00

0.00

0.00

SL No

Name of the
Material

Future Allotment
Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Rabbit ACSR
Conductor

Kms

750.00

800.00

800.00

700.75

750.00

732.00

731.00

Coyote ACSR
Conductor

Kms

0.00

25.00

25.00

25.00

25.00

25.00

15.41

Requirement/Allotment of     for Planned &


Non-Planned Works in BRC, BESCOM for the FY 2011-12
Already Allotted
SL
No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

45 KN Disc Insulator

Nos.

28074

28074

Pin Insulator Shells 1.1 KV

Nos.

48792

48792

Pin Insulator Shells 11 KV

Nos.

71770

68410

G.I. Pin 1.1 KV

Nos.

47774

48792

G.I. Pin 11 KV

Nos.

68410

68410

SPMT for 25/63 KVA

Set

2367

2367

SPMT for 100 KVA

Set

246

246

SPMT for 250 KVA

Set

15

15

L.T.Protection Kit

Set

5605

5605

10

Fresh Transformer Oil Good

KL

58.00

76.25

-18.25

0.00

9.45

32.90

33.90

0.00

SL
No

Name of the Material

Unit

Future Allotment
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

45 KN Disc Insulator

Nos.

4100

4100

4100

4100

4100

4100

3474

Pin Insulator Shells 1.1 KV

Nos.

7000

7000

7000

7000

7000

7000

6792

Pin Insulator Shells 11 KV

Nos.

10000

10000

10000

10000

10000

10000

8410

G.I. Pin 1.1 KV

Nos.

7000

7000

7000

7000

7000

7000

6792

G.I. Pin 11 KV

Nos.

10000

10000

10000

10000

10000

10000

8410

SPMT for 25/63 KVA

Set

340

340

340

340

340

340

327

SPMT for 100 KVA

Set

241

241

241

241

241

241

SPMT for 250 KVA

Set

10

L.T.Protection Kit

Set

800

800

800

800

800

800

805

Fresh Transformer Oil Good

KL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

Requirement/Allotment of 
 for Planned & Non-Planned
Works in KOLAR CIRCLE, BESCOM for the FY 2011-12

Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till July11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

D.Trs. 25 KVA

Nos.

1643

316

1327

64

99

119

34

120

D.Trs 63 KVA

Nos.

606

222

384

25

57

106

34

60

D.Trs 100 KVA

Nos.

121

97

24

20

54

16

D.Trs 250 KVA

Nos.

D.Trs 500 KVA

Nos.

Future Allotment.
SL No

Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

D.Trs. 25 KVA

Nos.

155

172

185

195

180

175

145

D.Trs 63 KVA

Nos.

30

46

50

50

50

50

48

D.Trs 100 KVA

Nos.

D.Trs 250 KVA

Nos.

D.Trs 500 KVA

Nos.

Requirement/Allotment of POLES for Planned & Non-Planned


Works in KOLAR CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit
Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

PCC Pole 8 mts

Nos.

12758

12758

PSC Poles 8 mts

Nos.

3522

3522

RCC Pole 8 mts

Nos.

5093

5093

PSC Poles 9 mts

Nos.

7283

7283

RCC Pole 9 mts

Nos.

3686

75

3611

75

Spun Pole

Nos.

701

701

Future Allotment
SL No

Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

PCC Pole 8 mts

Nos.

1914

1900

2000

2000

1330

1914

1700

PSC Poles 8 mts

Nos.

500

510

497

515

500

503

497

RCC Pole 8 mts

Nos.

728

680

755

720

800

680

730

PSC Poles 9 mts

Nos.

1040

1100

897

1150

1200

1000

896

RCC Pole 9 mts

Nos.

516

550

492

500

510

550

493

Spun Pole

Nos.

90

110

110

110

110

110

61

m  m  for Planned & Non-Planned


Works in KOLAR CIRCLE , BESCOM for the FY 2011-12

Requirement/Allotment of

Already Allotted
SL No

Name of the Material

Unit
Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

Rabbit ACSR Conductor

Kms

6398.12

200.00

6198.12

0.00

0.00

0.00

200.00

100.00

Coyote ACSR Conductor

Kms

1764.00

0.00

1764.00

0.00

0.00

0.00

0.00

0.00

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Rabbit ACSR Conductor

Kms

800.00

870.00

910.00

910.00

850.00

879.00

879.12

Coyote ACSR Conductor

Kms

252.00

260.00

260.00

260.00

250.00

241.00

241.00

||

Requirement/Allotment of     for Planned &


Non-Planned Works in KOLAR CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit

Total
Require
ment

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

45 KN Disc Insulator

Nos.

24525

24525

Pin Insulator Shells 1.1 KV

Nos.

23218

23218

Pin Insulator Shells 11 KV

Nos.

55951

5500

50451

500

4000

1000

G.I. Pin 1.1 KV

Nos.

23874

500

23374

500

G.I. Pin 11 KV

Nos.

52343

1400

50943

1000

400

SPMT for 25/63 KVA

Set

2162

2162

SPMT for 100 KVA

Set

64

64

SPMT for 250 KVA

Set

200

200

L.T.Protection Kit

Set

3374

3374

Fresh Transformer Oil Good

KL

120.00

78.11

41.89

3.00

28.35

33.81

12.95

5.00

9
10

Future Allotment
SL No

Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

45 KN Disc Insulator

Nos.

3500

3500

4000

4000

4000

2763

2763

Pin Insulator Shells 1.1 KV

Nos.

3300

3300

3500

3500

3300

3159

3159

Pin Insulator Shells 11 KV

Nos.

7200

7200

7200

7200

7500

7500

6651

G.I. Pin 1.1 KV

Nos.

3300

3300

3800

3300

3800

2937

2937

G.I. Pin 11 KV

Nos.

7200

7300

7300

7500

7000

7322

7322

SPMT for 25/63 KVA

Set

300

350

350

300

310

276

276

SPMT for 100 KVA

Set

10

14

10

20

10

SPMT for 250 KVA

Set

10

30

30

30

30

50

20

L.T.Protection Kit

Set

500

450

450

500

500

487

487

Fresh Transformer Oil Good

KL

5.27

5.27

5.27

5.27

5.27

5.27

5.27

10

|R

Requirement/Allotment of 
 for Planned & Non-Planned
Works in BRAZ, BESCOM for the FY 2011-12

Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

D.Trs. 25 KVA

Nos.

3642

498

3144

64

111

217

106

200

D.Trs 63 KVA

Nos.

1469

282

1187

37

82

129

34

130

D.Trs 100 KVA

Nos.

512

121

391

11

20

74

16

32

D.Trs 250 KVA

Nos.

D.Trs 500 KVA

Nos.

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

D.Trs. 25 KVA

Nos.

275

422

435

465

450

464

425

D.Trs 63 KVA

Nos.

120

136

150

160

173

160

158

D.Trs 100 KVA

Nos.

37

47

52

55

73

48

47

D.Trs 250 KVA

Nos.

D.Trs 500 KVA

Nos.

|V

Requirement/Allotment of POLES for Planned & Non-Planned


Works in BRAZ CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

PCC Pole 8 mts

Nos.

13358

40

13318

40

50

PSC Poles 8 mts

Nos.

9920

70

9850

70

50

RCC Pole 8 mts

Nos.

8340

8340

40

PSC Poles 9 mts

Nos.

24246

400

23846

150

150

100

80

RCC Pole 9 mts

Nos.

9352

300

9052

150

150

20

Spun Pole

Nos.

736

736

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

PCC Pole 8 mts

Nos.

1989

1975

2075

2075

1405

1989

1760

PSC Poles 8 mts

Nos.

1400

1410

1397

1415

1400

1403

1375

RCC Pole 8 mts

Nos.

1188

1140

1215

1180

1260

1140

1177

PSC Poles 9 mts

Nos.

3040

3520

3317

3570

3620

3420

3279

RCC Pole 9 mts

Nos.

1216

1340

1282

1290

1300

1340

1264

Spun Pole

Nos.

90

115

115

120

120

115

61

Requirement/Allotment of
Works in

m  m  for Planned & Non-Planned

BRAZ , BESCOM for the FY 2011-12

Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till July11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

Rabbit ACSR Conductor

Kms

12062

500

11562

100

400

200

Coyote ACSR Conductor

Kms

1904

1904

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Rabbit ACSR Conductor

Kms

1550

1670

1710

1611

1600

1611

1610

Coyote ACSR Conductor

Kms

252

285

285

285

275

266

256

Requirement/Allotment of     for Planned &


Non-Planned Works in BRAZ, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit
Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

45 KN Disc Insulator

Nos.

52599

52599

Pin Insulator Shells 1.1 KV

Nos.

72010

72010

Pin Insulator Shells 11 KV

Nos.

127721

5500

118861

500

4000

1000

G.I. Pin 1.1 KV

Nos.

71648

500

72166

500

G.I. Pin 11 KV

Nos.

120753

1400

119353

1000

400

SPMT for 25/63 KVA

Set

4529

4529

SPMT for 100 KVA

Set

310

310

SPMT for 250 KVA

Set

215

215

L.T.Protection Kit

Set

8979

8979

Fresh Transformer Oil Good

KL

178.00

154.36

23.64

3.00

37.80

66.71

46.85

5.00

9
10

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

45 KN Disc Insulator

Nos.

7600

7600

8100

8100

8100

6863

6237

Pin Insulator Shells 1.1 KV

Nos.

10300

10300

10500

10500

10300

10159

9951

Pin Insulator Shells 11 KV

Nos.

17200

17200

17200

17200

17500

17500

15061

G.I. Pin 1.1 KV

Nos.

10300

10300

10800

10300

10800

9937

9729

G.I. Pin 11 KV

Nos.

17200

17300

17300

17500

17000

17322

15732

SPMT for 25/63 KVA

Set

640

690

690

640

650

616

603

SPMT for 100 KVA

Set

251

255

251

261

251

241

SPMT for 250 KVA

Set

10

35

30

40

30

50

20

L.T.Protection Kit

Set

1300

1250

1250

1300

1300

1287

1292

Fresh Transformer Oil Good

KL

5.27

5.27

5.27

5.27

5.27

5.27

5.27

10

Requirement/Allotment of 
 for Planned & Non Planned
Works in TUMKUR CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit
Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

D.Trs. 25 KVA

Nos.

1356

382

974

72

79

158

73

50

D.Trs 63 KVA

Nos.

188

171

17

41

93

37

D.Trs 100 KVA

Nos.

42

67

-25

43

22

D.Trs 250 KVA

Nos.

-2

D.Trs 500 KVA

Nos.

Future Allotment.
SL No

Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

D.Trs. 25 KVA

Nos.

130

144

130

130

125

145

120

D.Trs 63 KVA

Nos.

D.Trs 100 KVA

Nos.

D.Trs 250 KVA

Nos.

D.Trs 500 KVA

Nos.

Requirement/Allotment of POLES for Planned & Non-Planned


Works in TUMKUR CIRCLE, BESCOM for the FY 2011-12

Already Allotted
SL No

Name of the Material

Unit
Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

PCC Pole 8 mts

Nos.

260

290

-30

290

PSC Poles 8 mts

Nos.

14243

150

14093

150

1000

RCC Pole 8 mts

Nos.

2956

250

2706

250

250

PSC Poles 9 mts

Nos.

15506

200

15306

200

1000

RCC Pole 9 mts

Nos.

3338

3338

500

Spun Pole

Nos.

Future Allotment
SL No

Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

PCC Pole 8 mts

Nos.

PSC Poles 8 mts

Nos.

2000

2000

2500

2500

2300

1396

397

RCC Pole 8 mts

Nos.

350

400

400

556

350

350

50

PSC Poles 9 mts

Nos.

2200

2100

2100

2200

2200

2506

1000

RCC Pole 9 mts

Nos.

400

380

380

410

448

410

410

Spun Pole

Nos.

|

m  m  for Planned & Non-Planned


Works in TUMKUR CIRCLE , BESCOM for the FY 2011-12
Requirement/Allotment of

Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

100.00

Rabbit ACSR Conductor

Kms

10031.36

300.00

9731.36

0.00

0.00

100.00

200.00

Coyote ACSR Conductor

Kms

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Future Allotment
SL No

Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Rabbit ACSR Conductor

Kms

1266

1400

1400

1500

1500

1300

1266

Coyote ACSR Conductor

Kms

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Requirement/Allotment of     for Planned &


Non-Planned Works in TUMKUR CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

45 KN Disc Insulator

Nos.

21294

21294

Pin Insulator Shells 1.1 KV

Nos.

29299

29299

Pin Insulator Shells 11 KV

Nos.

64663

2500

62163

2500

G.I. Pin 1.1 KV

Nos.

29299

29299

G.I. Pin 11 KV

Nos.

64663

64663

SPMT for 25/63 KVA

Set

1306

1306

SPMT for 100 KVA

Set

230

230

SPMT for 250 KVA

Set

L.T.Protection Kit

Set

1576

1576

Fresh Transformer Oil Good

KL

105.00

76.15

28.85

10.00

28.35

28.35

9.45

5.00

9
10

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

45 KN Disc Insulator

Nos.

3000

3042

3000

3300

3300

3000

2652

Pin Insulator Shells 1.1 KV

Nos.

4200

4200

4500

4500

4200

4200

3499

Pin Insulator Shells 11 KV

Nos.

8880

9000

9000

10000

10000

8500

6783

G.I. Pin 1.1 KV

Nos.

4200

4200

4300

4300

4100

4100

4099

G.I. Pin 11 KV

Nos.

10000

10000

10000

9500

9500

9500

6163

SPMT for 25/63 KVA

Set

200

200

200

180

180

200

146

SPMT for 100 KVA

Set

35

35

35

35

30

30

30

SPMT for 250 KVA

Set

L.T.Protection Kit

Set

225

250

250

250

250

250

101

Fresh Transformer Oil Good

KL

3.50

3.50

3.50

3.50

3.50

3.50

2.85

10

Requirement/Allotment of 
 for Planned & Non-Planned
Works in DAVANAGERE CIRCLE, BESCOM for the FY 2011-12

Already Allotted
SL
No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

D.Trs. 25 KVA

Nos.

3046

462

2584

84

66

196

116

84

D.Trs 63 KVA

Nos.

162

37

125

15

10

D.Trs 100 KVA

Nos.

77

17

60

16

D.Trs 250 KVA

Nos.

-1

D.Trs 500 KVA

Nos.

SL
No

Name of the Material

Future Allotment.

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

D.Trs. 25 KVA

Nos.

350

400

410

410

350

380

204

D.Trs 63 KVA

Nos.

15

20

20

20

15

15

10

D.Trs 100 KVA

Nos.

10

10

10

D.Trs 250 KVA

Nos.

D.Trs 500 KVA

Nos.

R|

Requirement/Allotment of POLES for Planned & Non-Planned


Works in DAVANAGERE CIRCLE, BESCOM for the FY 2011-12

SL
No

Already Allotted
Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

PCC Pole 8 mts

Nos.

20397

20397

PSC Poles 8 mts

Nos.

10962

10962

RCC Pole 8 mts

Nos.

3912

3912

PSC Poles 9 mts

Nos.

4099

4099

RCC Pole 9 mts

Nos.

6670

6670

Spun Pole

Nos.

SL
No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

PCC Pole 8 mts

Nos.

3000

3000

3200

3200

3000

2499

2498

PSC Poles 8 mts

Nos.

1500

1600

1700

1700

1500

1500

1462

RCC Pole 8 mts

Nos.

550

600

600

600

550

550

462

PSC Poles 9 mts

Nos.

600

600

599

550

600

600

550

RCC Pole 9 mts

Nos.

900

1000

1000

1000

950

950

870

Spun Pole

Nos.

RR

m  m  for Planned & Non-Planned


Works in DAVANAGERE CIRCLE , BESCOM for the FY 2011-12
Requirement/Allotment of

Already Allotted
SL
No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

100.00

Rabbit ACSR Conductor

Kms

9650.25

300.00

9350.25

0.00

0.00

100.00

200.00

Coyote ACSR Conductor

Kms

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SL
No

Name of the Material

0.00

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Rabbit ACSR Conductor

Kms

1350.00

1350.00

1200.00

1300.00

1300.00

925.00

925.25

Coyote ACSR Conductor

Kms

0.00

0.00

0.00

0.00

0.00

0.00

0.00

RV

Requirement/Allotment of     for Planned & NonPlanned Works in DAVANAGERE CIRCLE, BESCOM for the FY 2011-12
Already Allotted
SL
No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

45 KN Disc Insulator

Nos.

23593

5000

18593

5000

Pin Insulator Shells 1.1 KV

Nos.

57321

57321

Pin Insulator Shells 11 KV

Nos.

100270

1000

99270

1000

G.I. Pin 1.1 KV

Nos.

57321

57321

G.I. Pin 11 KV

Nos.

100270

100270

SPMT for 25/63 KVA

Set

3208

3208

SPMT for 100 KVA

Set

77

77

SPMT for 250 KVA

Set

L.T.Protection Kit

Set

3362

3362

Fresh Transformer Oil Good

KL

200.00

66.15

133.85

0.00

28.35

18.90

18.90

10.00

10

SL
No

Future Allotment
Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

45 KN Disc Insulator

Nos.

2600

2600

2800

2800

2500

2600

2693

Pin Insulator Shells 1.1 KV

Nos.

8200

8200

8321

8100

8200

8200

8100

Pin Insulator Shells 11 KV

Nos.

14200

14300

14300

14200

14200

14300

13770

G.I. Pin 1.1 KV

Nos.

8200

8200

8321

8100

8200

8200

8100

G.I. Pin 11 KV

Nos.

14300

14500

14500

14300

14300

14185

14185

SPMT for 25/63 KVA

Set

500

400

550

450

450

500

358

SPMT for 100 KVA

Set

10

10

17

10

10

10

10

SPMT for 250 KVA

Set

L.T.Protection Kit

Set

500

500

500

550

500

450

362

Fresh Transformer Oil Good

KL

20.00

20.00

20.00

20.00

18.00

15.00

10.85

10

Requirement/Allotment of 
 for Planned & Non-Planned
Works in CTAZ, BESCOM for the FY 2011-12

Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

D.Trs. 25 KVA

Nos.

4402

844

3558

156

145

354

189

134

D.Trs 63 KVA

Nos.

350

208

142

56

102

42

15

D.Trs 100 KVA

Nos.

119

84

35

59

23

D.Trs 250 KVA

Nos.

-3

D.Trs 500 KVA

Nos.

SL No

Name of the Material

Future Allotment.

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

D.Trs. 25 KVA

Nos.

480

544

540

540

475

525

324

D.Trs 63 KVA

Nos.

15

25

25

22

15

15

10

D.Trs 100 KVA

Nos.

10

10

10

D.Trs 250 KVA

Nos.

D.Trs 500 KVA

Nos.

Requirement/Allotment of POLES for Planned & Non-Planned


Works in CTAZ, BESCOM for the FY 2011-12
Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

PCC Pole 8 mts

Nos.

20657

290

20367

290

PSC Poles 8 mts

Nos.

25205

150

25055

150

1000

RCC Pole 8 mts

Nos.

6867

250

6617

250

250

PSC Poles 9 mts

Nos.

19605

200

19405

200

1000

RCC Pole 9 mts

Nos.

10008

10008

500

Spun Pole

Nos.

SL No

Name of the Material

Future Allotment

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

PCC Pole 8 mts

Nos.

3000

3000

3200

3200

3000

2499

2498

PSC Poles 8 mts

Nos.

3500

3600

4200

4200

3800

2896

1859

RCC Pole 8 mts

Nos.

900

1000

1000

1156

900

900

512

PSC Poles 9 mts

Nos.

2800

2700

2699

2750

2800

3106

1550

RCC Pole 9 mts

Nos.

1300

1380

1380

1410

1398

1360

1280

Spun Pole

Nos.

Requirement/Allotment of
Works in

CTAZ

m  m  for Planned & Non-Planned

, BESCOM for the FY 2011-12

Already Allotted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

Rabbit ACSR Conductor

Kms

19682

600.00

19081.61

0.00

0.00

200.00

400.00

200.00

Coyote ACSR Conductor

Kms

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Future Allotment
SL No

Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Rabbit ACSR Conductor

Kms

2616.00

2750.00

2600.00

2800.0

2800.00

2225.00

2191.00

Coyote ACSR Conductor

Kms

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Requirement/Allotment of     for Planned & NonPlanned Works in CTAZ, BESCOM for the FY 2011-12
Already Alloted
SL No

Name of the Material

Unit

Total
Requirement

Allotted
Till
July-11

Balance

Apr-11

May-11

June-11

July-11

Aug-11

45 KN Disc Insulator

Nos.

44887

5000

39887

5000

Pin Insulator Shells 1.1 KV

Nos.

86619

86619

Pin Insulator Shells 11 KV

Nos.

164933

3500

161433

1000

2500

G.I. Pin 1.1 KV

Nos.

86619

86619

G.I. Pin 11 KV

Nos.

164933

164933

SPMT for 25/63 KVA

Set

4514

4514

SPMT for 100 KVA

Set

307

307

SPMT for 250 KVA

Set

L.T.Protection Kit

Set

4938

4938

KL

305.00

142.30

162.70

10.00

56.70

47.25

28.35

15.00

9
10

Fresh Transformer Oil Good

Future Allotment
SL No

Name of the Material

Unit
Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

45 KN Disc Insulator

Nos.

5600

5642

5800

6100

5800

5600

5345

Pin Insulator Shells 1.1 KV

Nos.

12400

12400

12821

12600

12400

12400

11599

Pin Insulator Shells 11 KV

Nos.

23080

23300

23300

24200

24200

22800

20553

G.I. Pin 1.1 KV

Nos.

12400

12400

12621

12400

12300

12300

12199

G.I. Pin 11 KV

Nos.

24300

24500

24500

23800

23800

23685

20348

SPMT for 25/63 KVA

Set

700

600

750

630

630

700

504

SPMT for 100 KVA

Set

45

45

52

45

40

40

40

SPMT for 250 KVA

Set

L.T.Protection Kit

Set

725

750

750

800

750

700

463

Fresh Transformer Oil Good

KL

24.00

24.00

24.00

24.00

22.00

19.00

14.00

10

R

a 
V